Score
Condition Observed 0
4
Very Good (perfect condition)
3
Good (1-2 problems)
2
OK (3-4 problems)
1
Bad (5-6 problems)
0
Very Bad (above 7 problems), or non existant
Score (check box) 1 2 3
Date :_____________________________ Number
Category
Sort(Organization) Distinguish between what is needed and not needed
Score 0
1
Equipments-Health & Safety?
Whether Fire extinguishers, fire exits clear, PPE, Smoke detector , Hose pipes, Sand bag, Eye wash stations and first aid equipment are available in the floor
2
Facilities
Are facility items in the area broken, damaged
3
Floors & Gangways
Free of obstructions, fire exits clear
4
Visual Control System / Visual Mgt
All information is current and necessary ?
5
Storage(trims Accessories , sessior & Trimmer )
No material storage areas are overflowing
6
Awareness Building
all information related to awareness building are current & Necessary?
7
Workbenches & surfaces
No un-necessary items on workbenches or work surfaces
1
2
3
8
Wires , Cabiling & Hoses
Are all Wires, Cabling & Hoses item(Electrical panel board, Bus bar, Hoses) are current & Necessary?
9
Machine Guards, Windows & Interlocks
All interlocks are operational
10
Duty Technician
11
Emergency
12
Work Place Distribution
13
Sharp Tools
14
Tooling, Fixtures, Jigs
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
No Tools, fixtures & jigs on workstations unless in use
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
check box) 4
PRODUCTION 5S CH
core 4
Au dite d By :__ ___ ___ ___ Set in Order (Orderliness) A place ___ for everything and everything in its ___ place ___ ___ 0 __
Shine(Cleanliness)Cleaning and looking for ways to keep it clean and organized
Score 1
2
3
4
All fire extinguishers are charged, eye wash stations labelled, Smoke detector Hose pipe and first aid equipment available and labelled
Are safety glasses & Hose Pipes clean and in good condition
Have items in the area been identified that are broken or damaged ?
The area has floors swept, machinery clean and generally clean
Floor Marked per plant standard
Clean (No Dirst, No Spills, No Oil)
Floor visual tracking board layout constant with plant standard
All postings are neat & orderly in appearance
All material storage areas are clearly designated and labeled
Material storage areas only contain WIP and/or pre-kitted items
All information are available according to their placement
All Information is orderly place able and Organize
Workbenches and work surfaces are organized
Workbenches and work surfaces are clean and in good condition
Are all Wires, Cabling & Hoses item (Electrical panel board, Bus bar, Hoses) are in Quarantine area Guards and shields in place where required
All machine windows are cleaned regularly to area standard
Point of use Items have designated and clearly organized storage location
No tooling (measuring equipment, torque wrenches, pressure gauges) in area out of calibration
5S CHECKSHEET Standardize (Adherence) Maintain and monitor the first three categories
Score 0
1
2
3
4 Area plan identifies eye wash stations, fire extinguishers, and fire exits
Has maintenance request been raised ?
Floor marking standard created and posted in the area Area standard exists and is posted to define layout and format Area plan identifies location of material storage
All information are monitored according to SOP Does a standard exist in the area that describes what the workbenches and surfaces should require
Are a Aud ited : ___ ___ ___ ___ ___ ___ ___ 0 ___ _
Score 1
2
3
4
Machine guards, interlocks have planned maintenance standard and schedule
Area plan identifies location of tooling, fixtures & jigs
Sustain (Self-discipline) “Make habit of obedience to the rules”
Score 0
Are PPE and safety standards being adhered to by all employees in the area
Does an area have a planned maintenance schedule for all facilities issues ? Daily checksheet in place with sign off & date with improvement action items Are all visual tracking board standards adhered to at all times ? Items are returned to designated area when not in use
`
Are all workbenches & surfaces standards adhered to at all times ?
1
2
3
4
Machine guards, interlocks are maintained to planned maintenance standard
Are all tooling standards adhered to at all times ?
Standarization - Check
SI- No 1 Keep trolley are in correct place 2 Keep Machice in Right Angle 3 Keep machine cables in Proper hanging position 4 Keep Trimmers Hook To sewing Machine Keep Work Place Area Clean (Machine, Helpers 5 table iron Table, Under machine) Keep ,Accessories cup boar clean & keep 6 materials in allocated space 7 Keep Passage Free 8 Keep Trolley Clean keep cutting loading trolley clean & Pieces to be 9 in proper place Isolate The old style materials & keep in 10 respective area 11 Keep Production Document In Proper place 12 keep Clean the operation waste tag Keep Operators Launch bags In Respective racks 13 & Clean In QC table 14 keep Keep Necessary Proper InfoInformation like Style sample pieces , OB 15 layout , Trims card, Critical Operations Moke up & integrityWater in Display Keep Drinking Tank Clean 16 Bundle 17 Keep Floor & Window & Cabins Clean 18 Keep Toilet Clean
TWICE PER DAY
0-Bad, 1-Ok, 2- Good, 3-very 4th pillar- stan
CONTINOUSLY
SHINE
5S JOBS
1st 3 pillar
SET IN ORDER
Team: T-13
SORT
Zone: Sewing
Standarization - Checklist Month
Operators/ Feeding helper/ IE M/c/ Operators / IE Electrician/ Machine/ IE Operators Operators/ Supervisor Feeding Helper/ Supervisor/ IE Supervisor/ IE Operators/ Supervisor Feeding helper / Supervisor Feeding helper / Supervisor Feeding helper Operators Operators QC IE/ Supervisors/ QC House Keeping House Keeping House Keeping TTL
3RD WEEK
2ND WEEK
POINTS
1ST WEEK
RESPONSIBLE
ONCE PER ORDER
ONCE PER MONTH
ONCE PER WEEK
ONCE PER TWO DAYS
ONCE PER DAY
ad, 1-Ok, 2- Good, 3-very Good 4th pillar- standardize
5TH WEEK
4TH WEEK
POINTS
Record Sheet Zone Leader Ref
Code
Date
Inventory Item
Member Item Requirement
Physical Area
Needed
Necessity Red tag
Necessity Un needed
Visual Requirements For Seiton Organize flow & connect Workers Champion Team Leaders Start Due Factory: Visuals/3s for the Floor Team Design poka-yoke (Mistake Proffing) To Ensure That Workers follow 3s 1 2 3 4 5 6 7 a b c d e f g 8 a b c d e 9 10 11 12 13 14 15 16 17 18 19 20 21
Visual Requirements For Seiton Organize flow & connect Workers
Visuals/3s for the Floor Team Design poka-yoke (Mistake Proffing) To Ensure That Workers follow 3s All tables must be at same sight All Trimmers/ Scissors / Pencils Must be attached To the machine Design an area to post the necessary instruction on machines the same way Allocating a place for the side tables (painted) Marking the kanban level on the side table (Minimum & Maximum) Implement Pipeline Table for feeding parts at same frequency Modular have to have a designated place & visually identified to; Keep the folders Keep tools such as (screw drivers, extra foots etc) Keep input (Name what will be there) Keep packed cartons Keep empty cartons Keep maintenance log book Keep the key drivers visually At each work station Planning the point-of-use boards with simbala instructions needed for each work station Organize the machine lockers (A place to keep the extra Bobbin ect) A place to keep thing needed for clean up activities A place to keep a scrap materials to adjust the machine A place to put the size tag Display Decesion making support cadre allocated for the floor Display the leaders role / members role in local language (Convert into a pledge) Display the lean objectives with regard to the new floor Display Picture of the team A list of all colors used unside the floor (Legend for size colors, other indications used) Floor name board and picture , style, buyer, and number of weeks style is in process 2 Bulbs for Break-down and input kanban indentiofication (Make sure you name it) Machine should have a identification no related to TPM A bin for putting rejects at the end line and a place allocated for keeping it ( Separate the bin for 5 types of rejects ) Audit can use Visual controls for indicating the pass/fail Allocate a parking area for the trolley Display 'Meters' Cover- Up Wires / Nuts etc
Standarization - Checklist
Keep Yarn & fabric in correct place Keep fabric according to style & Dia wise Keep machine cables in Proper hanging position Keep Secissors in hanging Position Keep Work Place Area Clean (Machine, Helpers 5 table , Uner Table, Under machine)
Keep machine , Globes & Clips in Allocated Space 6 7 Keep Passage Free 8 Keep Table clean keep cutting loading trolley clean & Bundle to be in Proper place Isolate The old style Fabric & keep in respective 9 area 10 Keep Production Document In Proper place 11 keep Clean the operation waste tag Keep Workers Launch bags In Respective racks & 12 Clean 13 keep Necessary Information In QC table Keep Proper Info like Style , fabric quality fabric 14 Composition & quality Check Description 15 Keep Drinking Water Tank Clean 16 Keep Floor & Window & Cabins Clean 17 Keep Toilet Clean
ONCE PER ORDER
ONCE PER MONTH
ONCE PER WEEK
ONCE PER DAY
TWICE PER DAY
CONTINUESLY
ONCE PER TWO DAYS
SI- No 1 2 3 4
SHINE
5S JOBS
0-Bad, 1-Ok, 2- Good, 3-very Good 1st 3 pillar 4th pillar- standardize
SET IN ORDER
Team: T-13
SORT
Zone: Sewing
5TH WEEK
4TH WEEK
3RD WEEK
2ND WEEK
1ST WEEK
RESPONSIBLE
klist Month POINTS
Standarization - Checklist
Keep fabric in correct place Keep fabric according to style wise Keep machine cables in Proper hanging position Keep Secissors in hanging Position Keep Work Place Area Clean (Machine, Helpers 5 table , Uner Table, Under machine)
Keep machine , Globes & Clips in Allocated Space 6 7 Keep Passage Free 8 Keep Table clean keep cutting loading trolley clean & Bundle to be in Proper place Isolate The old style Fabric & keep in respective 9 area 10 Keep Production Document In Proper place 11 keep Clean the operation waste tag Keep Workers Launch bags In Respective racks & 12 Clean 13 keep Necessary Information In QC table Keep Proper Info like Style , fabric quality fabric 14 Composition & quality Check Description 15 Keep Drinking Water Tank Clean 16 Keep Floor & Window & Cabins Clean 17 Keep Toilet Clean
ONCE PER ORDER
ONCE PER MONTH
ONCE PER WEEK
ONCE PER DAY
TWICE PER DAY
CONTINUESLY
ONCE PER TWO DAYS
SI- No 1 2 3 4
SHINE
5S JOBS
0-Bad, 1-Ok, 2- Good, 3-very Good 1st 3 pillar 4th pillar- standardize
SET IN ORDER
Team: T-13
SORT
Zone: Sewing
cklist Month
Operators/ Feeding helper/ IE M/c/ Operators / IE Electrician/ Machine/ IE Operators Operators/ Supervisor Feeding Helper/ Supervisor/ IE Supervisor/ IE Operators/ Supervisor Feeding helper / Supervisor Feeding helper / Supervisor Feeding helper Operators Operators QC IE/ Supervisors/ QC House Keeping House Keeping House Keeping TTL
5TH WEEK
4TH WEEK
3RD WEEK
2ND WEEK
1ST WEEK
RESPONSIBLE
POINTS
Standarization - Checklist
Keep Yarn & fabric in correct place Keep fabric according to style & Dia wise Keep machine cables in Proper hanging position Keep Secissors in hanging Position Keep Work Place Area Clean (Machine, Helpers 5 table , Uner Table, Under machine)
Keep machine , Globes & Clips in Allocated Space 6 7 Keep Passage Free 8 Keep Table clean keep cutting loading trolley clean & Bundle to be in Proper place Isolate The old style Fabric & keep in respective 9 area 10 Keep Production Document In Proper place 11 keep Clean the operation waste tag Keep Workers Launch bags In Respective racks & 12 Clean 13 keep Necessary Information In QC table Keep Proper Info like Style , fabric quality fabric 14 Composition & quality Check Description 15 Keep Drinking Water Tank Clean 16 Keep Floor & Window & Cabins Clean 17 Keep Toilet Clean
ONCE PER ORDER
ONCE PER MONTH
ONCE PER WEEK
ONCE PER DAY
TWICE PER DAY
CONTINUESLY
ONCE PER TWO DAYS
SI- No 1 2 3 4
SHINE
5S JOBS
0-Bad, 1-Ok, 2- Good, 3-very Good 1st 3 pillar 4th pillar- standardize
SET IN ORDER
Team: T-13
SORT
Zone: Sewing
klist Month
Operators/ Feeding helper/ IE M/c/ Operators / IE Electrician/ Machine/ IE Operators Operators/ Supervisor Feeding Helper/ Supervisor/ IE Supervisor/ IE Operators/ Supervisor Feeding helper / Supervisor Feeding helper / Supervisor Feeding helper Operators Operators QC IE/ Supervisors/ QC House Keeping House Keeping House Keeping TTL
5TH WEEK
4TH WEEK
3RD WEEK
2ND WEEK
1ST WEEK
RESPONSIBLE
POINTS
Standarization - Checklist
Zone: Sewing
Team: T-13
5S JOBS
SI- No 1 Lockers
No irrelevant reference materials, such as documents, drawings, meeting materia
2 Desk
No excess pieces of equipment or reference materials on desk or in
3 Visual Control
rrelevan items or documents can be identified at a glance.
4 Standards for Disposal
Standards are fixed for disposal of documents and equipment.
5 Exhibits
Displays are up-to-date, tidy, and well-balanced.
6 Storage labels
Labeling of lockers and equipment allows immediate identification.
7 Labels for documents and eq Everything is clearly identified. 8 Ease of use
Storage is designed for ease of use.
9 Orderly storage
Everything is stored in a fixed place.
10 Aisles and display areas
All dividing lines and bulletin boards are clearly indicated
11 Floor
The floor is clean
12 Dust and Dirt
Windows, window sills and shelves are clean
13 Cleaning responsibilities
There is a rotation or shift system for cleaning
14 Wastebaskets
There is a system for getting rid of dirt and waste paper
15 Habitual cleaning
Sweeping and dusting are regarded as habitual activities
16 Ventilation
The air is clean, odorless, and free of cigarette smoke
17 Lighting
The angle and intensity of illumination are appropriate.
18 Uniforms
No body is wearing a dirty uniform.
19 Environment
The general environment is good, including color, air, lighting, etc.
20 The first 3 steps
There is a system for maintaing clearing up, organizing, and cleaning.
21 Clothing rules
The rules are adhered to.
22 Interaction of people
There is a pleasant general atmoshere, people exchange greetings, etc.
23 Meeting times and break timeEveryone makes an effort to be punctual. 24 Telephone Manners
Everyone states their business clearly, politely, and succinctly.
25 Rules and Regulations
All rules and regulations are strictly observed.
wings, meeting materials, etc.
nd cleaning.
eetings, etc. 5TH WEEK
4TH WEEK
3RD WEEK
1st 3 pillar 4th pillar- standardize 2ND WEEK
0-Bad, 1-Ok, 2- Good, 3-very Good
1ST WEEK
RESPONSIBLE
SORT SET IN ORDER SHINE CONTINUESLY TWICE PER DAY ONCE PER DAY ONCE PER TWO DAYS ONCE PER WEEK ONCE PER MONTH ONCE PER ORDER