REKAPITALASI BIAYA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RUMAH SAKIT - SARI ASIH CIPUTAT, TANGERANG
NO.
URAIAN
BIAYA (Rp)
A. 1 2 3 4
PEKERJAAN PERSIAPAN Pekerjaan Persiapan Perizinan PLN (1000 KVA) Perizinan PT Telkom Indonesia Perizinan PAL (Pembuangan air limbah)
B. 1 2 3 4 5 6
PEKERJAAN MEKANIKAL Pekerjaan Sistem Tata Udara (Air Conditioning) Pekerjaan Sistem Transportasi (Lift) Pekerjaan Sistem Plumbing Seawage Treatment Plant (STP) Pekerjaan Sistem Fire Fighting Pekerjaan Sistem Gas Medic
2,293,882,000 1,373,000,000 1,997,681,188 456,997,000 2,845,815,864 1,553,439,767
C. 1 2 3 4 5 6 7 8 9
PEKERJAAN ELEKTRIKAL Pekerjaan Sistem Listrik Pekerjaan Sistem Genset Pekerjaan Sistem Penangkal Petir Pekerjaan Sistem Telepon dan Data Pekerjaan Sistem Tata Suara Pekerjaan Fire Alarm Pekerjaan Sistem MATV Pekerjaan Sistem CCTV Pekerjaan Sistem Nurse Call
4,512,322,298 1,914,503,750 41,400,000 294,710,000 141,120,000 372,454,520 112,926,000 288,495,320 1,651,986,275
Total A + B + C Keuntungan Pemborong 10% Sub total A + B + C + Keuntungan Pemborong PPN 10 % TOTAL
227,600,000 150,000,000 9,600,000 12,000,000
20,249,933,982 2,024,993,398 22,274,927,380 2,227,492,738 24,502,420,119
REKAPITALASI BIAYA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RUMAH SAKIT - SARI ASIH CIPUTAT, TANGERANG
NO.
URAIAN
BIAYA (Rp)
A. 1 2 3 4
PEKERJAAN PERSIAPAN Pekerjaan Persiapan Perizinan PLN (1000 KVA) Perizinan PT Telkom Indonesia Perizinan PAL (Pembuangan air limbah)
B. 1 2 3 4 5 6
PEKERJAAN MEKANIKAL Pekerjaan Sistem Tata Udara (Air Conditioning) Pekerjaan Sistem Transportasi (Lift) Pekerjaan Sistem Plumbing Seawage Treatment Plant (STP) Pekerjaan Sistem Fire Fighting Pekerjaan Sistem Gas Medic
2,293,882,000 ( By Owner ) 1,997,681,188 ( By Owner ) 2,845,815,864 ( By Owner )
C. 1 8 2 3 4 5 6 7 9
PEKERJAAN ELEKTRIKAL Pekerjaan Sistem Listrik Pekerjaan Sistem Genset Pekerjaan Sistem Penangkal Petir Pekerjaan Sistem Telepon dan Data Pekerjaan Sistem Tata Suara Pekerjaan Fire Alarm Pekerjaan Sistem MATV Pekerjaan Sistem CCTV Pekerjaan Sistem Nurse Call
4,512,322,298 ( By Owner ) 41,400,000 294,710,000 141,120,000 372,454,520 112,926,000 288,495,320 1,651,986,275
Total A + B + C Keuntungan Pemborong 10% Sub total A + B + C + Keuntungan Pemborong PPN 10 % TOTAL
227,600,000 150,000,000 9,600,000 12,000,000
14,951,993,465 1,495,199,347 16,447,192,812 1,644,719,281 18,091,912,093
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN PERSIAPAN No
1
Uraian Pekerjaan Persiapan Biaya -biaya pengadaan staf dan peralatan kantor yang akan mengelola pelaksanaan pekerjaan dan mengurus segala hal yang berhubungan dengan administrasi proyek (mobilisasi)
Qty
Sat
H.Sat (Rp)
Total (Rp)
1
lot
40,000,000
40,000,000
25,000,000
2
Biaya - Biaya pemindahan peralatan kantor dan staff yang telah dipergunakan untuk pelaksanaan proyek (demobilisasi)
1
lot
25,000,000
3
Pemborong harus mengadakan peralatan kerja yang cukup, jumlah kualitas dan kapasitasnya untuk melaksanakan pekerjaan yang dimaksudkan dalam dokumen tender ini. Termasuk dalam biaya ini adalah pembuatan dan pembong karan serta perampihan kembali tempat penyimpanan barang.
1
lot
########## 100,000,000
4
Pembuatan dan penggandaan dokumen kontrak lengkap gambar-gambar kontrak sebanyak lima (5) set, dimana 4(empat) set diberikan kepada pemberi tugas.
1
lot
2,000,000
2,000,000
5
Pembuatan gambar- gambar pelaksanaan /shop drawing, gambar-gambar yang telah dilaksanakan /as built drawing yang harus diberikan kepada pemberi tugas dalam bentuk kalkir 1(satu) set dan 2(dua) set blue print.
1
lot
5,000,000
5,000,000
6
Pengadaan contoh - contoh bahan yang dikehendaki oleh pemberi tugas atau wakilnya sesuai dengan spesifikasi tehnis yang dipersyaratkan dalam dokumen tender harus segera diadakan tanpa keterlambatan
1
lot
7
Pemborong harus mengangkat keluar lokasi proyek semua sampah-sampah hasil pekerjaan secara teratur sehingga keadaan lapangan selalu bersih. Termasuk didalamnya pengadaan tempat sampah sementara dan peralatan kebesihannya.
1
lot
15,000,000
15,000,000
8
Pemborong harus penyiapkan kantor proyek untuk wakil pemberi tugas termasuk didalamnya kantor pemborong lengkap dengan lampu penerangan dan instalasinya.
1
lot
12,000,000
12,000,000
9
Pengadaan peralatan pencegahan terhadap bahan kebakaran berupa APAR dan menyediakan tenaga-tenaga yang terlatih.
1
lot
600,000
600,000
10 Pemborong bertanggung jawab terhadap penjagaan / perlindungan peralatan kerja dan material kerja terhadap kehilangan atau kerusakan yang sedang dipergunakan dalam proyek.
1
lot
4,000,000
4,000,000
11 Pengadaan Sepatu Safety, Handy talky (HT), Helm proyek, jas hujan, payung untuk pemberi tugas dan pengawas lapangan
1
lot
9,000,000
9,000,000
12 Semua pekerja pemborong harus mendaftarkan seluruh pegawainya yang terlibat dalam proyek ini kepada asuransi JAMSOSTEK
1
lot
15,000,000
15,000,000
Sub Total
incl
227,600,000
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM TATA UDARA No
Uraian
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
2
Unit
16,100,000
32,200,000
A
PEKERJAAN PLUMBING
I 1
Peralatan Utama Transfer Pump Kapasitas : 475 l/m Head : 40 mtr Speed : 2900 rpm Daya : 7,5 kw/ 3Ø/ 380 V/50 hz/3 ph Jenis : Pakaged (1set 2 pompa) Berikut kabel electroda GWT dan Roof Tank
2
Booster Pump Kapasitas : 150 l/m Head : 20 mH20 Speed : 2900 rpm Daya : 3 kw/ 3Ø/ 380 V/50 hz/3 ph Jenis : Pakaged (1set 2 pompa) Spesifikasi Pompa : 1 Paket Booster Pump terdiri dari : - 2 unit Pompa + Motor - 1 unit Panel Control Automatic/ Alternate - 1 unit Diagprahma Pressure Tank - 1 lot Accessories
1
Unit
48,000,000
48,000,000
3
Pompa Deep Well Kapasitas : 150 Lpm Head : 20 mH20 Speed : 2900 rpm Daya : 3 kw/ 3Ø/ 380 V/50 hz/3 ph
1
Unit
262,500,000
262,500,000
4
Sand Filter Type : Automatic Backwash Kap : 150 l/min
1
Unit
42,625,000
42,625,000
Carbon Filter Type : Automatic Backwash Kap : 150 l/min
1
Unit
48,625,000
48,625,000
1
set
83,125,000
83,125,000
18
unit
15,312,000
275,616,000
5
6
Tanki Air Atas (Roof tank) , Lokasi Atap Kapasitas : 20 m3 Bahan : FRP Lengkap dengan dudukan pondasi, dan pipa over, flow dan sistem drain. Termasuk tangga pengontrol
7
Sump Pump 1 (Basement) Kapasitas : 150 Lpm Head : 20 m H2O Speed : 1450 rpm Daya : 1,5 kW, 3Ø, 380 V, 50 Hz Jenis : Submersible Pump, lengkap dengan panel kontrol dan pengkabelannya dan Accessories
8
Material bantu
1
lot
3,500,000
3,500,000
9
Testing commissioning
1
lot
7,500,000
7,500,000
No
Uraian
QTY
SAT
HARGA SATUAN Rp.
Sub. Total I II
Site Plan dan R. Pompa - Ø 100 mm ( Header ) - Ø 65 mm - Ø 32 mm - Ø 25 mm - Ø 20 mm
803,691,000
1 131 70 196 210
lot mtr mtr mtr mtr
3,500,000 164,260 76,879 61,155 42,881
3,500,000 21,518,060 5,381,513 11,986,380 9,005,063
Water meter dia 65mm Bak kontrol 40 x 40 x 40 cm
1 8
bh bh
1,970,250 1,750,000
1,970,250 14,000,000
Gate valve , tekanan kerja 10 bar - Ø 150 mm - Ø 80 mm - Ø 20 mm
5 2 8
bh bh bh
3,787,500 1,413,750 156,603
18,937,500 2,827,500 1,252,821
2
bh
1,970,250
3,940,500
2
bh
1,833,750
3,667,500
Flexibel joint - Ø 80 mm - Ø 65 mm
2 2
bh bh
993,750 861,250
1,987,500 1,722,500
Foot Valve - Ø 80 mm
2
bh
1,613,750
Pressure Gauge
2
bh
185,000
370,000
Floating Valve - Ø 50 mm
1
bh
2,500,000
2,500,000
Kran Taman
9
bh
130,000
1,170,000
m m
131,719 51,333
6,322,514 5,236,000
Check Valve, tekanan kerja 10 kg - Ø 65 mm Strainer, tekanan kerja 10 bar : - Ø 80 mm
Instalasi Air Kotor (Pipa PVC Class AW, class 10 K) air kotor dia. 150 mm dia. 100 mm
48 102
Sub Total II III
JUMLAH HARGA Rp.
117,295,600
INSTALASI AIR HUJAN Pipa PVC AW Class 10 K Site Plan Ø 200 Ø 150
150 67
m m
289,200 197,710
43,380,000 13,246,570
Instalasi pipa tegak Ø 50 Ø 80 Ø 150
28 56 168
m m m
33,384 55,650 197,710
934,752 3,116,400 33,215,280
Lantai-dasar Ø 150
73
m
197,710
14,432,830
Lantai-dua Ø 150
95
m
197,710
18,782,450
Ø 80
70
m
HARGA SATUAN Rp. 55,650
Roof drain Ø 80
10
bh
162,750
1,627,500
Lantai-tiga Ø 150
76
m
93,780
7,127,280
Lantai-empat Ø 150
76
m
93,780
7,127,280
Lantai-lima Ø 100
76
m
93,780
7,127,280
Lantai-atap Ø 100
76
m
93,780
7,127,280
Roof drain Ø 100
20
bh
187,250
3,745,000
Lantai-atap (ruang mesin) Ø 80 Ø 100
41 20
m m
51,333 93,780
2,104,667 1,875,600
Roof drain Ø 80 Ø 100
5 4
bh bh
162,750 187,250
813,750 749,000
Fitting-fitting
1
lot
12,500,000
12,500,000
Material bantu
1
lot
5,000,000
5,000,000
Testing commissioning
1
lot
4,500,000
4,500,000
No
Uraian
QTY
SAT
Sub. Total III IV
LANTAI BASEMENT Instalasi Air Bersih (Pipa Galvanized Iron Medium Class) dia. 80 mm dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm dia. 20 mm dia. 15 mm
JUMLAH HARGA Rp. 3,895,500
192,428,419
30 30 55 85 75 120 300
mtr mtr mtr mtr mtr mtr mtr
210,825 119,550 87,345 76,879 61,155 42,881 33,608
6,324,750 3,586,500 4,803,975 6,534,694 4,586,625 5,145,750 10,082,250
Gate Valve dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm
1 2 2 8
bh bh bh bh
396,700 256,250 209,450 157,600
396,700 512,500 418,900 1,260,800
Fitting
1
lot
2,750,000
2,750,000
Material bantu
1
lot
1,375,000
1,375,000
Pengetesan
1
lot
2,500,000
2,500,000 47,778,444
No
Uraian INSTALASI AIR KOTOR, BEKAS DAN VENT Instalasi Air Bekas (Pipa PVC Class AW, class 10 K) air kotor dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
8 88 100 72 30
m m m m m
197,710 93,780 55,650 44,295 33,384
1,581,680 8,252,640 5,565,000 3,189,240 1,001,520
Gate valve dia 80 mm Check valve dia 80 mm
18 18
bh bh
1,335,750 1,593,750
24,043,500 28,687,500
Instalasi Air Kotor (Pipa PVC Class AW, class 10 K) air bekas dia. 150 mm dia. 100 mm
48 30
m m
197,710 93,780
9,490,080 2,813,400
Instalasi Air Vent dia. 50 mm dia. 40 mm dia. 32 mm
71 17 45
m m m
32,100 24,825 22,688
2,279,100 422,025 1,020,938
Floor Drain (FD) dia. 50 mm
9
bh
147,650
1,328,850
Clean Out lantai (Co) dia. 100 mm dia. 50 mm
2 4
bh bh
164,286 136,905
328,571 547,619
Fitting
1
lot
2,750,000
2,750,000
Material bantu
1
lot
1,350,000
1,350,000
Pengetesan
1
lot
2,500,000
2,500,000 97,151,663
V
LANTAI SATU Instalasi Air Bersih (Pipa Galvanized Iron Medium Class) dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm dia. 20 mm dia. 15 mm
6 46 85 66 133 285
m m m m m m
119,550 87,345 76,879 61,155 42,881 33,608
717,300 4,017,870 6,534,694 4,036,230 5,703,206 9,574,777
Gate Valve dia. 50 mm dia. 32 mm dia. 25 mm dia. 20 mm
1 2 2 3
bh bh bh bh
396,700 209,450 157,600 120,000
396,700 418,900 315,200 360,000
Fitting
1
lot
1,250,000
1,250,000
Material bantu
1
lot
750,000
750,000
25
m
93,780
2,344,500
INSTALASI AIR KOTOR, BEKAS DAN VENT Instalasi Air Bekas (Pipa PVC Class AW, class 10 K) air kotor dia. 100 mm
75 90 115
m m m
HARGA SATUAN Rp. 55,650 44,295 44,295
22 85 12
m m m
93,780 55,650
7,971,300 667,800
92 54 120
m m m
32,100 24,825 22,688
2,953,200 1,340,550 2,722,500
15
bh
147,650
2,214,750
Clean out lantai (Co) dia. 80 mm dia. 65 mm
5 3
bh bh
164,286 136,905
821,429 410,714
Fitting
1
lot
2,250,000
2,250,000
Material bantu
1
lot
1,450,000
1,450,000
Pengetesan
1
lot
2,500,000
2,500,000
No
Uraian dia. 80 mm dia. 65 mm dia. 50 mm Instalasi Air Kotor (Pipa PVC Class AW, class 10 K) air bekas dia. 150 mm dia. 100 mm dia. 80 mm Pipa Vent PVC Class D Class 5 K dia. 50 mm dia. 40 mm dia. 32 mm Floor Drain (FD) dia. 50 mm
QTY
SAT
JUMLAH HARGA Rp. 4,173,750 3,986,550 5,093,925
74,975,845 VI
LANTAI DUA Instalasi Air Bersih (Pipa Galvanized Iron Medium Class) dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm dia. 20 mm dia. 15 mm
3 65 36 45 68 265
mtr mtr mtr mtr mtr mtr
119,550 87,345 76,879 61,155 42,881 33,608
358,650 5,677,425 2,767,635 2,751,975 2,915,925 8,905,988
Gate Valve dia. 50 mm dia. 32 mm dia. 25 mm
1 2 2
bh bh bh
396,700 256,250 209,450
396,700 512,500 418,900
Fitting
1
lot
1,000,000
1,000,000
Material bantu
1
lot
650,000
650,000
Instalasi Air Bekas (Pipa PVC Class AW, class 10 K) air kotor dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm
150 20 25 25
mtr m m m
93,780 55,650 44,295 32,100
14,067,000 1,113,000 1,107,375 802,500
Instalasi Air Kotor (Pipa PVC Class AW, class 10 K) air bekas dia. 100 mm dia. 150 mm
14 14
mtr mtr
93,780 197,750
1,312,920 2,768,500
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
51 50 80
mtr mtr mtr
32,100 24,825 22,688
1,637,100 1,241,250 1,815,000
Floor Drain (FD) dia. 50 mm dia. 65 mm
5 2
bh bh
147,650 175,000
738,250 350,000
Clean out lantai (Co) dia. 50 mm dia. 65 mm dia. 150 mm
3 5 7
bh bh bh
32,100 136,905 197,750
96,300 684,524 1,384,250
Fitting
1
lot
2,738,095
2,738,095
Material bantu
1
lot
2,190,476
2,190,476
2,190,476
2,190,476
No
Uraian Pipa Vent PVC Class D Class 5 K dia. 50 mm dia. 40 mm dia. 32 mm
. Pengetesan
1
lot
62,592,714 VII
LANTAI TIGA Instalasi Air Bersih (Pipa Galvanized Iron Medium Class) dia. 65 mm dia. 40 mm dia. 32 mm dia. 25 mm dia. 20 mm dia. 15 mm
20 65 64 60 60 205
mtr mtr mtr mtr mtr mtr
164,260 87,345 76,879 61,155 42,881 33,608
3,285,200 5,677,425 4,920,240 3,669,300 2,572,875 6,889,538
Gate Valve dia. 65 mm dia. 40 mm dia. 32 mm dia. 25 mm dia. 15 mm
1 2 2 5 3
bh bh bh bh bh
164,260 465,476 186,174 156,603 33,608
930,952 372,348 783,013 100,823
Fitting
1
lot
2,738,095
2,738,095
Material bantu
1
lot
2,190,476
2,190,476
Instalasi Air Bekas (Pipa PVC Class AW, class 10 K) air kotor dia. 80 mm dia. 65 mm
230 230
m m
55,650 44,295
12,799,500 10,187,850
Instalasi Air Kotor (Pipa PVC Class AW, class 10 K) air bekas dia. 100 mm dia. 150 mm
329 91
m m
93,780 55,650
30,853,620 5,064,150
Pipa Vent PVC Class D Class 5 K dia. 50 mm dia. 40 mm dia. 32 mm
45 60 132
m m m
32,100 24,825 22,688
1,444,500 1,489,500 2,994,750
32 6
bh bh
147,650 175,000
4,724,800 1,050,000
Floor Drain (FD) dia. 50 mm dia. 65 mm
No
Uraian Clean out lantai (Co) dia. 100 mm dia. 65 mm
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
4 22
bh bh
164,286 136,905
657,143 3,011,905
Fitting
1
lot
3,500,000
3,500,000
Material bantu
1
lot
2,000,000
2,000,000
2,500,000
2,500,000
. Pengetesan
1
lot
116,408,003 VIII
LANTAI EMPAT Instalasi Air Bersih (Pipa Galvanized Iron Medium Class) dia. 65 mm dia. 50 mm dia. 40 mm dia. 25 mm dia. 20 mm dia. 15 mm
20 6 65 60 60 205
mtr mtr mtr mtr mtr mtr
164,260 119,550 87,345 61,155 42,881 33,608
3,285,200 717,300 5,677,425 3,669,300 2,572,875 6,889,538
1 2 16 3
bh bh bh bh
485,587 465,476 156,603
485,587 930,952 2,505,642
Fitting
1
lot
2,738,095
2,738,095
Material bantu
1
lot
2,190,476
2,190,476
Instalasi Air Bekas (Pipa PVC Class AW, class 10 K) air kotor dia. 80 mm dia. 65 mm
230 230
m m
55,650 44,295
12,799,500 10,187,850
Instalasi Air Kotor (Pipa PVC Class AW, class 10 K) air bekas dia. 100 mm dia. 150 mm
329 75
m m
93,780 55,650
30,853,620 4,173,750
Pipa Vent PVC Class D Class 5 K dia. 50 mm dia. 40 mm dia. 32 mm
45 60 132
m m m
32,100 24,825 22,688
1,444,500 1,489,500 2,994,750
Floor Drain (FD) dia. 50 mm dia. 65 mm
32 6
bh bh
147,650 175,000
4,724,800 1,050,000
Clean out lantai (Co) dia. 100 mm dia. 65 mm
29 31
bh bh
164,286 136,905
4,764,294 4,244,048
Fitting
1
lot
3,500,000
3,500,000
Material bantu
1
lot
2,000,000
2,000,000
2,500,000
2,500,000
Gate Valve dia. 65 mm dia. 40 mm dia. 25 mm dia. 15 mm
. Pengetesan
1
lot
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp. 118,389,002
60 75 220 245
mtr mtr mtr mtr
76,879 61,155 42,881 33,608
4,612,725 4,586,625 9,433,875 8,233,838
16
bh
186,174
2,978,785
Fitting
1
lot
2,400,000
2,400,000
Material bantu
1
lot
1,250,000
1,250,000
INSTALASI AIR KOTOR, BEKAS DAN VENT (Pipa PVC Class AW, class 10 K) air kotor dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm
6 48 6 6 6
m m m m m
197,710 93,780 55,650 44,295 33,384
1,186,260 4,501,440 333,900 265,770 200,304
(Pipa PVC Class AW, class 10 K) air bekas dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm
34 25 6 25 20
m m m m m
197,710 93,780 55,650 44,295 33,384
6,722,140 2,344,500 333,900 1,107,375 667,680
Pipa Vent PVC Class D Class 5 K dia. 50 mm dia. 40 mm dia. 32 mm dia. 50 mm
6 22 21 6
m m m bh
32,100 24,825 22,688 147,650
192,600 546,150 476,438 885,900
Clean out lantai (Co) dia. 100 mm dia. 50 mm Fitting
2 2 1
bh bh lot
164,286 136,905 2,000,000
328,571 273,810 2,000,000
Material bantu
1
lot
1,500,000
1,500,000
Pengetesan
1
lot
2,500,000
2,500,000
No
IX
Uraian
LANTAI LIMA (Pipa Galvanized Iron Medium Class) dia. 32 mm dia. 25 mm dia. 20 mm dia. 15 mm Gate Valve dia. 32 mm
59,862,585 X
Lantai - Atap (Pipa Galvanized Iron Medium Class) dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm
12 189 16 8 3
mtr mtr mtr mtr mtr
279,145 210,825 164,260 119,550 87,345
3,349,740 39,845,925 2,628,160 956,400 262,035
1 28
bh bh
186,174 156,603
186,174 4,384,873
Fitting
1
lot
1,750,000
1,750,000
Material bantu
1
lot
1,500,000
1,500,000
Gate Valve dia. 32 mm dia. 25 mm
No
Uraian
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
INSTALASI AIR KOTOR, BEKAS DAN VENT Lantai- Atap dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm
6 48 6 6 6
m m m m m
197,710 93,780 55,650 44,295 33,384
1,186,260 4,501,440 333,900 265,770 200,304
(Pipa PVC Class AW, class 10 K) Air bekas dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm
34 6 6 6 20
m m m m m
197,710 93,780 55,650 44,295 33,384
6,722,140 562,680 333,900 265,770 667,680
Pipa Vent PVC Class D Class 5 K dia. 65 mm dia. 50 mm dia. 40 mm dia. 32 mm
6 6 6 21
m m m m
44,295 32,100 24,825 22,688
265,770 192,600 148,950 476,438
Floor Drain (FD) dia. 50 mm
6
bh
147,650
885,900
Clean out lantai (Co) dia. 100 mm dia. 50 mm
2 2
bh bh
164,286 136,905
328,571 273,810
Fitting
1
lot
1,350,000
1,350,000
Material bantu
1
lot
750,000
750,000
Pengetesan
1
lot
2,500,000
2,500,000 77,075,190
Instalasi Air Bersih dia 80 mm ( supplay ke Roof Tank ) dia 80 mm ( Gravitasi ke lt. B dan lt. 1 )
70 70
mtr mtr
210,825 210,825
14,757,750 14,757,750
Instalasi Air Kotor & Air Bekas dia 150 mm dia 100 mm
50 50
mtr mtr
197,710 93,780
9,885,500 4,689,000
Instalasi Ventilasi dia 80 mm
50
mtr
71,888
3,594,375
1
lot
7,500,000
7,500,000
Testing commissioning
55,184,375 VI.
Instalasi Air Panas Sistem Water Heater PERALATAN UTAMA Pengadaan dan pemasangan matrial utama water heater system Gas lengkap dengan matrial Pendukung dan Accesoriesnya sehingga dapat berpungsi dengan baik Air Panas Sistem Electrical
unit
HARGA SATUAN Rp. 11,000,000
JUMLAH HARGA Rp. 22,000,000
50 6
mtr bh
24,900 175,000
1,245,000 1,050,000
2
unit
1,600,000
3,200,000
50 3
mtr bh
24,900 175,000
1,245,000 525,000
13
unit
21,000,000
273,000,000
Lantai 1 dia 20 mm dia 15 mm Ball Valve dia 15 mm
17 33 1
mtr mtr bh
38,900 24,900 175,000
661,300 821,700 175,000
Lantai 2 dia 20 mm dia 15 mm Ball Valve dia 15 mm
22 65 2
mtr mtr bh
38,900 24,900 175,000
855,800 1,618,500 350,000
Lantai 3 dia 20 mm dia 15 mm Ball Valve dia 15 mm
22 90 3
mtr mtr bh
38,900 24,900 175,000
855,800 2,241,000 525,000
No
Uraian GWH (Gas Water Heater) di lantai Basement Model : 25V30-7P ENERGY : LPG/Nat Gas Heat Input : 30.000 BTUH Capacity : 30 USG/114 Liter Dray Weight : 44 Kg
QTY
SAT
2
Instalasi pipa air panas dari Water heater solar panel ke Outlet. Menggunakan pipa PPR Type PN - 20 Lantai Basement dia 15 mm Ball Valve dia 15 mm Instalasi Air Panas Sistem Water Heater PERALATAN UTAMA Pengadaan dan pemasangan matrial utama water heater system Electrical lengkap dengan matrial Pendukung dan Accesoriesnya sehingga dapat berpungsi dengan baik Air Panas Sistem Electrical EWH (Electric Water Heater) di lantai 2 Kapasitas 50 Liter Daya1500 Watt Instalasi pipa air panas dari Water heater solar panel ke Outlet. Menggunakan pipa PPR Type PN - 20 Lantai Dua dia 15 mm Ball Valve dia 15 mm PERALATAN UTAMA Pengadaan dan pemasangan matrial utama water heater system solar panel lengkap dengan matrial Pendukung dan Accesoriesnya sehingga dapat berpungsi dengan baik Air Panas Sistem Solar Panel SWH (Solar Water Heater) di lantai atap Kapasitas 300 Liter Type 300 LXC Daya 1500 Watt Instalasi pipa air panas dari Water heater solar panel ke Outlet. Menggunakan pipa PPR Type PN - 20
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
Lantai 4 dia 20 mm dia 15 mm Ball Valve dia 15 mm
8 40 2
mtr mtr bh
38,900 24,900 175,000
311,200 996,000 350,000
Lantai 5 PPR dia 20 mm dia 15 mm Ball Valve dia 15 mm
136 320 8
mtr mtr bh
38,900 24,900 175,000
5,290,400 7,968,000 1,400,000
Lantai Atap dia 25 mm Ball Valve dia 25 mm Ball Valve dia 15 mm
120 1 13
mtr bh bh
62,600 225,000 175,000
7,512,000 225,000 2,275,000
Material bantu
1
lot
3,000,000
3,000,000
Testing commissioning
1
lot
7,500,000
7,500,000
No
Uraian
317,931,700
TOTAL
1,997,681,188
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM TATA UDARA Qty
Sat
H.Sat (Rp)
IU/OU - B.1,B.2,B.3, B.9 Lokasi :Rekam Medis, R.Dewasa, Lift Lobby Kapasitas :12200 BTUH Air flow :350 CFM Daya :1120 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
4
Unit
6,150,000
66,500,000
IU/OU - B.4,B.7 B.8, B.11, B.12, B.14 Lokasi :Ruangan I, Work Shop, R.Kebidanan, R. Anak, Bank Kapasitas :8900 BTUH Air flow :311 CFM Daya :815 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
6
Unit
4,950,000
29,700,000
IU/OU - B.6, B.15, B.16, B.17 Lokasi :R.Dewasa,Gudang Apotik, Bank Kapasitas :18100 BTUH Air flow :572 CFM Daya :1650 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
4
Unit
9,200,000
36,800,000
IU/OU - B.13 Lokasi Kapasitas Air flow Daya Type Power Suplai
1
Unit
4,500,000
4,500,000
1
Unit
2,200,000
2,200,000
1
Unit
5,000,000
5,000,000
No A. 1
2
Uraian
Total (Rp)
TATA UDARA LANTAI BASEMENT Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
:KA :4500 BTUH :240 CFM :350 WATT :Split Wall :1P/220V/50HZ
Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF - B.1 Lokasi Air flow Daya Type Power Suplai
:R.pompa :1000 CFM :150 WATT :Wall Industrial :3P/380V/50HZ
EF - B.2 Lokasi Air flow Daya
:Parkir Basement :3000 CFM :350 WATT
No
Uraian Type Power Suplai
:Wall Industrial :3P/380V/50HZ
EF - B.3 Lokasi Air flow Daya Type Power Suplai
Toilet :1000 CFM :150 WATT :Axial :3P/380V/50HZ
EF - B.4 Lokasi Air flow Daya Type Power Suplai
:Parkir Basement :3000 CFM :350 WATT :Wall Industrial :3P/380V/50HZ
EF - B.5 Lokasi Air flow Daya Type Power Suplai
:Parkir Basement :3000 CFM :350 WATT :Wall Industrial :3P/380V/50HZ
EF - B.6 Lokasi Air flow Daya Type Power Suplai
:Loundry :3000 CFM :350 WATT :Axial :3P/380V/50HZ
EF - B.7 Lokasi Air flow Daya Type Power Suplai
:Dapur :200 CFM :150 WATT :Axial :1P/220V/50HZ
EF - B.8 Lokasi Air flow Daya Type Power Suplai
:Parkir Basement :3000 CFM :350 WATT :Wall Industrial :3P/380V/50HZ
EF - B.9 Lokasi Air flow Daya Type Power Suplai
:Gudang Apotik :100 CFM :30 WATT :Ceilling :1P/220V/50HZ
EF - B.10 Lokasi Air flow Daya Type Power Suplai
:R Jenazah :100 CFM :30 WATT :Ceilling :1P/220V/50HZ
EF - B.11 Lokasi
Koridor
Qty
Sat
H.Sat (Rp)
Total (Rp)
1
Unit
2,200,000
2,200,000
1
Unit
5,000,000
5,000,000
1
Unit
5,000,000
5,000,000
1
Unit
5,000,000
5,000,000
1
Unit
700,000
700,000
1
Unit
5,000,000
5,000,000
1
Unit
1,100,000
1,100,000
1
Unit
1,100,000
1,100,000
1
Unit
2,200,000
2,200,000
Qty
Sat
H.Sat (Rp)
Total (Rp)
1
Unit
5,000,000
5,000,000
1
Unit
5,000,000
5,000,000
1
Unit
2,200,000
2,200,000
Grill Fan R Pompa ( EF=B.1) ukuran 500 x 500
1
Buah
450,000
450,000
Grill Fan Parkir Basement ( EF=B.2) ukuran 600 x 600
1
Buah
600,000
600,000
Ducting Exhaust Toilet ukuran 100 x 100 150 x 100 200 x 200 300 x 250 350 x 250 400 x 300 400 x 400
30 8 7 10 10 20 5
Meter Meter Meter Meter Meter Meter Meter
120,000 130,000 160,000 190,000 200,000 220,000 240,000
3,600,000 1,040,000 1,120,000 1,900,000 2,000,000 4,400,000 1,200,000
Exhaust Air Grill Toilet ukuran 250 x 250
8
Buah
105,000
840,000
Grill Fan Toilet (EF-B.3) ukuran 500 x 500
1
Buah
450,000
450,000
Ducting Intake Fan Kitchen ukuran 600 x 300
34
Meter
280,000
9,520,000
Grill Kitchen (IF=B.2) Hood ukuran 600 x 300
1
Buah
600,000
600,000
Suplay Air Grill Kitchen ukuran 500 x 250
4
Buah
400,000
1,600,000
Ducting Exhaust Fan Kitchen ukuran 600 x 300
58
Meter
280,000
16,240,000
Stove Hood Ukuran 5000 x 1500
2
Set
6,500,000
13,000,000
Grill Kitchen (EF=B.4) Hood ukuran 600 x 600
1
Buah
600,000
600,000
No
3
Uraian Air flow Daya Type Power Suplai
:1000 CFM :150 WATT :Axial :3P/380V/50HZ
IF - B.1 Lokasi Air flow Daya Type Power Suplai
:Loundry :3000 CFM :350 WATT :Axial :3P/380V/50HZ
IF - B.2 Lokasi Air flow Daya Type Power Suplai
Kitchen :3000 CFM :350 WATT :Axial :3P/380V/50HZ
IF - B.3 Lokasi Air flow Daya Type Power Suplai
Koridor :1000 CFM :150 WATT :Axial :3P/380V/50HZ
Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
No
Uraian Grill Fan Parkir Basement ( EF=B.5) Hood ukuran 600 x 600
1
Buah
600,000
600,000
Ducting Intake Fan Loundry ukuran
34
Meter
280,000
9,520,000
Grill Loundry (IF=B.1) ukuran 600 x 300
1
Buah
600,000
600,000
Suplay Air Grill Loundry ukuran 500 x 250
3
Buah
400,000
1,200,000
Ducting Exhaust Fan Loundry ukuran 600 x 300
58
Meter
280,000
16,240,000
Suplay Air Grill Loundry ukuran 500 x 250
3
Buah
400,000
1,200,000
Grill Fan Loundry (EF=B.6) Hood ukuran 600 x 600
1
Buah
600,000
600,000
Ducting Exhaust Dapur ukuran 200 x 200
7
Meter
160,000
1,120,000
Exhaust Air Grill Dapur ukuran 300 x 300
2
Buah
105,000
210,000
Grill Fan Dapur (EF-B.7) Hood ukuran 500 x 500
1
Buah
450,000
450,000
Grill Fan Parkir Basement ( EF=B.8) Hood ukuran 600 x 600
1
Buah
600,000
600,000
Ducting Exhaust Gudang Apotik ukuran 200 x 200
9
Meter
160,000
1,440,000
Grill Fan Gudang Apotik (EF-B.9) ukuran 250 x 250
1
Buah
105,000
105,000
Ducting Exhaust R jenazah ukuran 200 x 200
9
Meter
160,000
1,440,000
Grill Fan R jenazah (EF-B.10) ukuran 250 x 250
1
Buah
105,000
105,000
16 16 16 16 16 42
Meter Meter Meter Meter Meter Meter
180,000 190,000 200,000 220,000 220,000 240,000
2,880,000 3,040,000 3,200,000 3,520,000 3,520,000 10,080,000
1
Buah
600,000
600,000
6
Buah
400,000
2,400,000
1
Buah
600,000
600,000
6
Buah
400,000
2,400,000
39 96 16
Meter Meter Meter
37,000 40,000 75,000
1,443,000 3,840,000 1,200,000
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berfungsi dengan baik Diameter 3/4" Diameter 1" Riser Diameter 2" Sub Total A
B 1
Total (Rp)
Sat
Ducting Intake dan Exhaust Fan Koridor ukuran 250 x 250 300 x 250 300 x 300 350 x 300 350 x 350 400 x 400 Grill Fan Koridor (IF-B.3) ukuran 500 x 500 Suplay Air Grill Koridor ukuran 400 x 400 Grill Fan Koridor (EF-B.3) ukuran 500 x 500 Exhaust Air Grill Koridor ukuran 400 x 400 4
H.Sat (Rp)
Qty
TATA UDARA LANTAI 1 ( SATU ) Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
317,513,000
Qty
Sat
H.Sat (Rp)
20
Unit
4,750,000
95,000,000
IU/OU - 1.2,1.3,1.4 1.6, 1.7,1.8, 1.17,1.18,1.3.7, 1.4.4,1.4.5,1.4.6 12 Lokasi :Alat, KA, Panoramic, Dokter, KA Lab, :Sperma Kapasitas :4500 BTUH Air flow :240 CFM Daya :350 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
Unit
4,500,000
54,000,000
IU/OU - 1.9,1.15,1.26,1.38, 1.62, 1.63, 1.64 Lokasi :R.Tunggu Exutive, Locket, Rawat jalan, :Pendaptaran, Bank Kapasitas :8900 BTUH Air flow :311 CFM Daya :815 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
7
Unit
4,950,000
34,650,000
IU/OU - 1.19,1.20,1.40,1.41,1.42,1.43, 1.60, 1.61 Lokasi :Racik, KA, IGD, Kapasitas :18100 BTUH Air flow :572 CFM Daya :1650 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
8
Unit
9,200,000
73,600,000
IU/OU - 1.31,1.32,1.33,1.34,1.47,1.51, 1.65 Lokasi :Rontgen, CT Scan, Lab, Minimarket Kapasitas :12200 BTUH Air flow :350 CFM Daya :1120 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
7
Unit
6,150,000
43,050,000
IU/OU - 1.52 Lokasi Kapasitas Air flow Daya Type Power Suplai
1
Unit
42,000,000
42,000,000
:Ruang tunggu Poliklinik :90 000 BTUH : CFM :9650 WATT :Split Duct :3P/380V/50HZ
IU/OU - 1.53 Lokasi Kapasitas Air flow Daya Type Power Suplai
1
Unit
9,200,000
9,200,000
:Ruang tunggu :18100 BTUH :572 CFM :1650 WATT :Split Wall :1P/220V/50HZ
No
Uraian
Total (Rp)
vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik IU/OU - 1.1,1.5,1.10, 1.11,1.12,1.13,1.14,1.16,1.21, 1.22, 1.23,1.24,1.25, 1.27,1.28,1.29,1.30,1.35,1.36,1.39 Lokasi :Play room, Nursery, USG, Dokter, Kapasitas :6750 BTUH Air flow :296 CFM Daya :552 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
No
2
Uraian IU/OU - 1.54 Lokasi Kapasitas Air flow Daya Type Power Suplai
:Ruang tunggu :18100 BTUH :572 CFM :1650 WATT :Split Wall :1P/220V/50HZ
IU/OU - 1.55 Lokasi Kapasitas Air flow Daya Type Power Suplai
:Poli Umum :6750 BTUH :296 CFM :552 WATT :Split Wall :1P/220V/50HZ
IU/OU - 1.56 Lokasi Kapasitas Air flow Daya Type Power Suplai
:Ruang tunggu, Koridor :774 00 BTUH : CFM :6500 WATT :Split Duct :3P/380V/50HZ
IU/OU - 1.57 Lokasi Kapasitas Air flow Daya Type Power Suplai
:Koridor, Food Court :115 000 BTUH : CFM :9 800 WATT :Split Duct :3P/380V/50HZ
IU/OU - 1.58 Lokasi Kapasitas Air flow Daya Type Power Suplai
:Lift Lobby :126 000 BTUH : CFM :10 000 WATT :Split Duct :3P/380V/50HZ
IU/OU - 1.59 Lokasi Kapasitas Air flow Daya Type Power Suplai
:Ruang tunggu :116 000 BTUH : CFM :9 800 WATT :Split Duct :3P/380V/50HZ
Qty
Sat
H.Sat (Rp)
Total (Rp)
1
Unit
9,200,000
9,200,000
1
Unit
4,750,000
4,750,000
1
Unit
39,000,000
39,000,000
1
Unit
46,500,000
46,500,000
1
Unit
48,000,000
48,000,000
1
Unit
46,500,000
46,500,000
1
Unit
1,100,000
1,100,000
Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF - 1.1 Lokasi Air flow Daya Type Power Suplai
:Toilet Poli :100 CFM :30 WATT :Ceilling :1P/220V/50HZ
Unit
H.Sat (Rp) 1,400,000
Total (Rp) 1,400,000
1
Unit
1,100,000
1,100,000
EF - 1.4 dan EF 1.5 Lokasi :R Racik Apotik Air flow :100 CFM Daya :30 WATT Type :Ceilling Power Suplai :1P/220V/50HZ
2
Unit
1,100,000
2,200,000
EF - 1.6 dan 1.7 Lokasi Air flow Daya Type Power Suplai
1
Unit
1,100,000
1,100,000
:Wastafel Lab :100 CFM :30 WATT :Ceilling :1P/220V/50HZ
EF - 1.8 Lokasi Air flow Daya Type Power Suplai
1
Unit
1,300,000
1,300,000
:Micro Biologi :200 CFM :30 WATT :Ceilling :1P/220V/50HZ
Flexible Duct c/w Isolasi dia 200 mm 200 x 200 bjls 50 250 x 200 bjls 50 250 x 250 bjls 50 300 x 250 bjls 50 300 x 300 bjls 50 350 x 300 bjls 50
35 80 30 40 16 22 7
Meter Meter Meter Meter Meter Meter Meter
95,000 148,000 185,000 231,000 277,000 333,000 388,000
3,325,000 11,840,000 5,550,000 9,240,000 4,432,000 7,326,000 2,716,000
SAD 250 x 250 RAG 250 x 250 FAG 250 x 250 Plenum Box
34 15 5 5
Buah Buah Buah Set
147,500 105,000 165,000 200,000
5,015,000 1,575,000 825,000 1,000,000
Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. Ducting Exhaust Toilet Poli (EF-1.1) ukuran 100 x 100
12
Meter
110,000
1,320,000
No
3
4
Uraian EF - 1.2 Lokasi Air flow Daya Type Power Suplai
:Toilet Publik :700 CFM :100 WATT :Axial :1P/220V/50HZ
EF - 1.3 Lokasi Air flow Daya Type Power Suplai
:R Gelap :100 CFM :30 WATT :Ceilling :1P/220V/50HZ
Qty
Sat
1
Pengadaan dan Pemasangan Ducting AC Split Duct fan leng kap berikut isolasi, hanger, suport, vibration mounting, plexible joint,plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Ducting Exhaust Toilet Publik (EF-1.2) ukuran
Meter Meter Meter Meter
H.Sat (Rp) 110,000 130,000 160,000 200,000
Total (Rp) 5,610,000 1,950,000 320,000 600,000
3
Meter
110,000
330,000
Ducting Exhaust R Racik (EF-1.4dan EF-1.5) ukuran 200 x 200
26
Meter
160,000
4,160,000
Ducting Exhaust Wastafel Lab (EF-1.6) ukuran PVC Type D 100
22
Meter
25,000
550,000
Ducting Exhaust R Lab (EF-1.7) ukuran PVC Type D 100
20
Meter
25,000
500,000
Ducting Exhaust Micro Biologi (EF-1.7) ukuran PVC Type D 150
15
Meter
30,000
450,000
11
Buah
105,000
1,155,000
1
Buah
105,000
105,000
1
Buah
180,000
180,000
1
Buah
105,000
105,000
1
Buah
180,000
180,000
1
Buah
105,000
105,000
1
Buah
105,000
105,000
1
Buah
180,000
180,000
320 112 90
Meter Meter Meter
37,000 40,000 75,000
11,840,000 4,480,000 6,750,000
No
Uraian
Qty
Sat
100 x 100 150 x 100 200 x 200 300 x 300
51 15 2 3
Ducting Exhaust R Gelap (EF-1.3) ukuran 100 x 100
Exhaust Air Grill Toilet Publik ukuran 250 x 250 Grill fan Toilet Poli (EF-1.1) ukuran 250 x 250 Grill fan Toilet Publik (EF-1.2) ukuran 300 x 300 Grill fan R Gelap (EF-1.3) ukuran 250 x 250 Grill fan R Racik (EF-1.4 dan EF- 1.5) ukuran 300 x 300 Grill fan Wastafel Lab (EF-1.6) ukuran 250 x 250 Grill fan R Lab (EF-1.7) ukuran 250 x 250 Grill fan Micro Biologi (EF-1.8) ukuran 300 x 300 5
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik Diameter 3/4" Diameter 1" Diameter 2" Sub Total B
C 1
647,469,000
TATA UDARA LANTAI 2 ( DUA ) Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik IU/OU - 2.1, 2.3, 2.6 Lokasi :OK1, OK2, OK3 (Plasma Cluster) Kapasitas :18100 BTUH Air flow :572 CFM Daya :1650 WATT Type :PLASMA CLUSTER Power Suplai :1P/220V/50HZ
3
Unit
9,200,000
27,600,000
IU/OU - 2.7, 2.10, 2.18, 2.19, 2.24, 2.25, 2.32, 2.33, 2.34
10
Unit
9,200,000
92,000,000
Qty
Sat
H.Sat (Rp)
IU/OU - 2.8,2.9,2.17,2.31,2.32 Lokasi :Dirut, Fisio terafi, Meeting :room 1, SPI Kapasitas :12200 BTUH Air flow :350 CFM Daya :1120 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
4
Unit
6,150,000
24,600,000
IU/OU - 2.11,2.12,2.16, 2.21,2.22,2.23,2.28,2.29,2.36 Lokasi :RR, NS, Meeting, EDP, SDM, Scre :tary, Dokter, KA, RO Kapasitas :6750 BTUH Air flow :296 CFM Daya :552 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
9
Unit
4,750,000
42,750,000
IU/OU - 2.13,2.14,2,15, 2.20, 2.26,2.30 Lokasi :ODC, Dokter,R.Tunggu OK, Keuangan Kapasitas :8900 BTUH Air flow :311 CFM Daya :815 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
6
Unit
4,950,000
29,700,000
1
Unit
2,200,000
2,200,000
1
Unit
1,300,000
1,300,000
1
Unit
1,100,000
1,100,000
No
Uraian Lokasi Kapasitas Air flow Daya Type Power Suplai
2
Total (Rp)
2.36 :Resulasi,RR, Keuangan, PT, Hemodialisa, NS, Meeteng Room 2 :18100 BTUH :572 CFM :1650 WATT :Split Wall :1P/220V/50HZ
Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF - 2.1 Lokasi Air flow Daya Type Power Suplai
:OK1, OK2, OK3 :1000 CFM :150 WATT :Axial :3P/380V/50HZ
EF - 2.2 Lokasi Air flow Daya Type Power Suplai
Toilet :250 CFM :100 WATT :Axial :1P/220V/50HZ
EF - 2.3 Lokasi Air flow Daya Type Power Suplai
:Toilet :100 CFM :30 WATT :Axial :1P/220V/50HZ
Unit
H.Sat (Rp) 2,200,000
Total (Rp) 2,200,000
1
Unit
1,100,000
1,100,000
1
Unit
1,100,000
1,100,000
1
Unit
1,100,000
1,100,000
1
Unit
2,200,000
2,200,000
3
Buah
400,000
1,200,000
1 3
Buah Set
400,000 2,000,000
400,000 6,000,000
Ducting Exhaust Fan Toilet ukuran 100 x 100 150 x 150 200 x 200
36 15 12
Meter Meter Meter
110,000 130,000 160,000
3,960,000 1,950,000 1,920,000
Ducting Exhaust Fan OK ukuran 300 x 200 300 x300
20 10
Meter Meter
130,000 160,000
2,600,000 1,600,000
6
Buah
105,000
630,000
1
Buah
105,000
105,000
1
Buah
105,000
105,000
No
3
Uraian EF - 2.4 Lokasi Air flow Daya Type Power Suplai
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
EF - 2.5 Lokasi Air flow Daya Type Power Suplai
:Hemodialisa :100 CFM :30 WATT :Axial :1P/220V/50HZ
EF - 2.6 Lokasi Air flow Daya Type Power Suplai
:Hempdialisa :100 CFM :30 WATT :Axial :1P/220V/50HZ
EF - 2.7 Lokasi Air flow Daya Type Power Suplai
:Alat :100 CFM :30 WATT :Axial :1P/220V/50HZ
IF - 2.1 Lokasi Air flow Daya Type Power Suplai
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
Qty
Sat
1
Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. Exhaust Air Grill OK1, OK2, OK3 ukuran 400 x 400 Grill fan (EF-2.1) OK1, OK2, OK3) ukuran 400 x 400 Filter
Exhaust Air Grill Toilet Publik ukuran 250 x 250 Grill fan (EF-2.2) Toilet Publik ukuran 300 x 300 Grill fan (EF-2.3) Toilet Hemodilisa ukuran 250 x 250
No
Uraian Ducting Exhaust (EF-2.5 dan EF-2.6) Hemodialisa ukuran 100 x 100
8
Meter
110,000
880,000
Grill fan (EF-2.5 dan EF-2.6) Hemodialisa ukuran 250 x 250
2
Buah
105,000
210,000
20 20 20 20 20 20 40
Meter Meter Meter Meter Meter Meter Meter
180,000 190,000 200,000 210,000 220,000 230,000 240,000
3,600,000 3,800,000 4,000,000 4,200,000 4,400,000 4,600,000 9,600,000
1
Buah
600,000
600,000
7
Buah
400,000
2,800,000
1
Buah
600,000
600,000
6
Buah
400,000
2,400,000
328 80
Meter Meter
37,000 75,000
12,136,000 6,000,000
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik Diameter 3/4" Diameter 2" Sub Total C
D 1
Total (Rp)
Sat
Ducting Intake dan Exhaust Fan Koridor ukuran 250 x 250 300 x 250 300 x 300 350 x 300 350 x 350 400 x 350 400 x 400 Grill Fan Koridor (IF=2.1) ukuran 500 x 500 Suplay Air Grill Koridor ukuran 400 x 400 Grill Fan Koridor (EF=2.4) ukuran 500 x 500 Return Air Grill Koridor ukuran 400 x 400 4
H.Sat (Rp)
Qty
309,246,000
TATA UDARA LANTAI 3 ( TIGA ) Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik IU/OU - 3.1,3.5,3.13,3.17,3.20,3.21,3.22,3.24,3.26, 3.29,3.30 Lokasi :Dokter, Isolasi, Karu, menyusui, mandi :bayi, kala Kapasitas :6750 BTUH Air flow :296 CFM Daya :552 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
11
Unit
4,750,000
52,250,000
IU/OU - 3.2, 3.6, 3.15, 3.16, 3.18,3.25,3.28, 3.31, 3.33 Lokasi :ICU VIP, R tunggu VK, NICU, Kala, :Lounge, Preinatologi, Nurse (OK, VK pakai AC Plasma Cluster) Kapasitas :8900 BTUH Air flow :311 CFM Daya :815 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
9
Unit
4,950,000
44,550,000
IU/OU - 3.6, 3.7,3.8,3.9,3.10,3.11,3.12, 3.19, 3.27,3.34,3.35,3.36,3.37,3.38 Lokasi :Kelas I, II, III, VTP, NICU, Primatologi
13
Unit
4,150,000
53,950,000
Qty
Sat
H.Sat (Rp)
6
Unit
9,200,000
55,200,000
1
Unit
2,200,000
2,200,000
EF - 3.2 s/d EF-3.21 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ
20
Unit
1,100,000
22,000,000
IF - 3.1 Lokasi Air flow Daya Type Power Suplai
1
Unit
2,200,000
2,200,000
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
CF - 3.1 Lokasi Air flow Daya Type Power Suplai
1
Unit
700,000
700,000
:Mushola :200 CFM :100 WATT :Ceilling :1P/220V/50HZ
Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. Ducting Exhaust Toilet ukuran 100 x 100
82
Meter
110,000
9,020,000
Ducting Intake dan Exhaust Fan Koridor ukuran 250 x 250 300 x 250 300 x 300 350 x 300 400 x 400
32 32 32 32 20
Meter Meter Meter Meter Meter
180,000 190,000 200,000 220,000 240,000
5,760,000 6,080,000 6,400,000 7,040,000 4,800,000
No
Uraian Kapasitas Air flow Daya Type Power Suplai
Total (Rp)
:Kala, Bayi VIP, :12200 BTUH :350 CFM :1120 WATT :Split Wall :1P/220V/50HZ
IU/OU - 3.14,3.23, 3.32, 3.33, 3.34, 3.39 Lokasi :High Care, VK, Bayi, TCU Kapasitas :18100 BTUH Air flow :572 CFM Daya :1650 WATT Type :Split Wall Power Suplai :1P/220V/50HZ 2 berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF -.3.1 Lokasi Air flow Daya Type Power Suplai
3
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
No
Uraian Grill Fan Koridor (IF=3.1) ukuran 500 x 500 Suplay Air Grill Koridor ukuran 400 x 400 Grill Fan Koridor (EF=3.1) ukuran 500 x 500 Return Air Grill Koridor ukuran 400 x 400
4
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berfungsi dengan baik Diameter 3/4" Diameter 1" Diameter 2"
H.Sat (Rp)
Sat
1
Buah
600,000
600,000
8
Buah
400,000
3,200,000
1
Buah
600,000
600,000
9
Buah
400,000
3,600,000
280 10 80
Meter Meter Meter
37,000 40,000 75,000
10,360,000 400,000 6,000,000
Sub Total D
E 1
Total (Rp)
Qty
296,910,000
TATA UDARA LANTAI 4 ( EMPAT ) Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik IU/OU - 4.1,4.2,4.8,4.9,4.25, Lokasi :Kelas III, Rtunggu, Kapasitas :18100 BTUH Air flow :572 CFM Daya :1650 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
5
Unit
9,200,000
46,000,000
IU/OU - 4.3,4.4,4.5,4.6,4.7,4.10,4.11,4.12,4.13,4.14,4.15, 4.16,4.17,4.18,4.19,4.23,4.24,4.27,4.28,4.29,4.30 4.31,4.34 Lokasi :Kelas II, Nurse Kapasitas :12200 BTUH Air flow :350 CFM Daya :1120 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
23
Unit
6,150,000
141,450,000
IU/OU - 4.20,4.21,4.32,4.33,4.36 Lokasi :Observasi, Karu, Kelas II, obat, Kon sultasi Kapasitas :6750 BTUH Air flow :296 CFM Daya :552 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
5
Unit
4,750,000
23,750,000
IU/OU - 4.22 Lokasi Kapasitas Air flow Daya Type Power Suplai
1
Unit
4,950,000
4,950,000
:Nurse :8900 BTUH :311 CFM :815 WATT :Split Wall :1P/220V/50HZ
Qty
Sat
H.Sat (Rp)
Total (Rp)
1
Unit
2,200,000
2,200,000
EF - 4.2 s/d EF-4.30 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ
29
Unit
1,100,000
31,900,000
IF - 4.1 Lokasi Air flow Daya Type Power Suplai
1
Unit
2,200,000
2,200,000
Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. Ducting Exhaust Toilet ukuran 100 x 100
75
Meter
110,000
8,250,000
Ducting Exhaust Toilet (Riser) ukuran 300 x 300
108
Meter
200,000
21,600,000
16 16 16 16 16 16 16 16
Meter Meter Meter Meter Meter Meter Meter Meter
180,000 190,000 200,000 220,000 220,000 230,000 240,000 250,000
2,880,000 3,040,000 3,200,000 3,520,000 3,520,000 3,680,000 3,840,000 4,000,000
1
Buah
600,000
600,000
9
Buah
400,000
3,600,000
1
Buah
600,000
600,000
8
Buah
400,000
3,200,000
260 4 80
Meter Meter Meter
37,000 40,000 75,000
9,620,000 160,000 6,000,000
No 2
Uraian Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF -.4.1 Lokasi Air flow Daya Type Power Suplai
3
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
Ducting Intake dan Exhaust Fan Koridor ukuran 250 x 250 300 x 250 300 x 300 350 x 300 350 x 350 400 x 350 400 x 400 450 x 400 Grill Fan Koridor (IF=4.1) ukuran 500 x 500 Suplay Air Grill Koridor ukuran 400 x 400 Grill Fan Koridor (EF=4.1) ukuran 500 x 500 Return Air Grill Koridor ukuran 400 x 400 4
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik Diameter 3/4" Diameter 1" Diameter 2"
Qty
Sat
H.Sat (Rp)
Total (Rp) 333,760,000
IU/OU - 5.1,5.2,5.3,5.4,5.5,5.6,5.7,5.8,5.9,5.10,5.11,5.12, 5.13,5.14,5.15,5.16,5.17,5.18,5.19,5.20,5.21,5.22, 5.23,5.24,5.25,5.26,5.27,5.28,5.29,5.30,5.31, 5.32,5.36 Lokasi :VIP, R TUNGGU,Kelas I, Obat, NS Kapasitas :12200 BTUH Air flow :350 CFM Daya :1120 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
33
Unit
6,150,000
202,950,000
IU/OU - 5.33,5.34,5.37 Lokasi :Konsultasi, Karu, :sultasi Kapasitas :6750 BTUH Air flow :296 CFM Daya :552 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
3
Unit
4,750,000
14,250,000
1
Unit
2,200,000
2,200,000
EF - 5.2 s/d EF-5.33 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ
32
Unit
1,100,000
35,200,000
IF - 5.1 Lokasi Air flow Daya Type Power Suplai
1
Unit
2,200,000
2,200,000
No
Uraian Sub Total E
F 1
2
TATA UDARA LANTAI 5 ( LIMA ) Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF -.5.1 Lokasi Air flow Daya Type Power Suplai
3
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
:Koridor :1000 CFM :250 WATT :Axial :3P/380V/50HZ
Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. Ducting Exhaust Toilet ukuran
No
Uraian
Total (Rp) 10,120,000
120
Meter
200,000
24,000,000
16 16 16 16 16 16 16 16
Meter Meter Meter Meter Meter Meter Meter Meter
180,000 190,000 200,000 220,000 220,000 230,000 240,000 250,000
2,880,000 3,040,000 3,200,000 3,520,000 3,520,000 3,680,000 3,840,000 4,000,000
1
Buah
600,000
600,000
9
Buah
400,000
3,600,000
1
Buah
600,000
600,000
8
Buah
400,000
3,200,000
250 8 80
Meter Meter Meter
37,000 40,000 75,000
9,250,000 320,000 6,000,000
Sat
100 x 100
92
Ducting Exhaust Toilet (Riser) ukuran 300 x 300 Ducting Intake Fan Koridor ukuran 250 x 250 300 x 250 300 x 300 350 x 300 350 x 350 400 x 350 400 x 400 450 x 400 Grill Fan Koridor (IF=5.1) ukuran 500 x 500 Suplay Air Grill Koridor ukuran 400 x 400 Grill Fan Koridor (EF=5.1) ukuran 500 x 500 Return Air Grill Koridor ukuran 400 x 400 4
Meter
H.Sat (Rp) 110,000
Qty
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik Diameter 3/4" Diameter 1" Diameter 2" Sub Total F
G 1
342,170,000
TATA UDARA LANTAI A ( ATAP ) Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik IU/OU - A.01,A.02,A.03 Lokasi :R mesin Lift Kapasitas :8900 BTUH Air flow :311 CFM Daya :815 WATT Type :Split Wall Power Suplai :1P/220V/50HZ
2
Unit
4,950,000
14,850,000
1
Unit
14,000,000
14,000,000
Pengadaan dan Pemasangan Presh Air fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berfungsi dengan baik.(Interpace to Fire Alarm) PAF - A..1 Lokasi Air flow Daya Type Power Suplai
3
3
:Lantai Tangga kebakaran :11000 CFM :3000 WATT :Axial :3P/380V/50HZ
Pengadaan dan Pemasangan Ducting/Hood PAF lengkap berikut hanger, suport, vibration mounting, flexible joint,
No
Uraian
H.Sat (Rp)
Total (Rp)
Qty
Sat
4
Meter
440,000
1,760,000
2
Buah
480,000
960,000
Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik Diameter 3/4"
12
Meter
37,000
444,000
Grill tangga kebakaran 600 x 300
6
Buah
400,000
2,400,000
plenum box dan accesoriesnya sehingga dapat berfungsi dengan baik. Ducting Presh air fan ukuran 800 x 800 Presh air fan grill 800 x 800 4
5
Sub Total G H 1
34,414,000
TATA UDARA R. GENSET DAN TRAFO Pengadaan dan Pemasangan peralatan utama FAN Lengkap dengan Instalasi pengkabelan, berikut accesoriesnya.sehingga dapat berpungsi dengan baik EF - G.1/ EF - G.2 Lokasi :R. Genset Air flow :2000 CFM Daya :250 WATT Type :Wall Industrial Power Suplai :3P/380V/50HZ
2
Unit
3,800,000
7,600,000
EF - T1 Lokasi Air flow Daya Type Power Suplai
1
Unit
4,800,000
4,800,000
Sub Total H Total A - H
:R. Trafo :7000 CFM :700 WATT :Wall Industrial :3P/380V/50HZ 12,400,000 2,293,882,000
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM PEMADAM KEBAKARAN QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
1.1 Pompa Elektrik Hydrant (Ruang pompa lt, B ) - Kapasitas : 500 GPM - Head : 100 meter - Put : 2900 Rpm - Type : splite case - Operation : start automatik, stop manual
1
unit
104,000,000
104,000,000
1.2 Pompa Diesel Hydrant (Ruang pompa lt, B ) - Kapasitas : 500 GPM - Head : 100 meter - Put : 2900 Rpm - Type : splite case - Operation : start automatik,
1
unit
200,000,000
200,000,000
1.3 Pompa Jokey - Kapasitas - Head - Put - Type - Operation
(Ruang pompa lt, B ) : 25 GPM : 100 meter : 2900 Rpm : Vertikal : start/stop automatik
1
unit
25,794,500
25,794,500
1.4 Panel Kontrol Pompa Kebakaran Mengacu ke Standard NFPA - Lengkap dengan Pressure tank dan acce sories Dan dapat interface dengan MCFA
3
set
1
lot
12,500,000
12,500,000
2
set
7,352,500
14,705,000
54 30 30
m m m
781,128 470,400 185,400
42,180,912 14,112,000 5,562,000
No
Uraian Pekerjaan Pemadam Kebakaran 1
Pekerjaan Equipment Utama
1.5 Assesories instalasi pompa Material Bantu Termasuk pondasi pompa, support,hangger, Vibration mounting , dan tanki solar harian kap200 ltr , berikut instalasinya + pengecatan
INCLUDE
sub total 1 2
Instalasi Pemadam Kebakaran di Ruang Pompa
2.1 Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support, penge catan Blind Flange dan Accessories Header dia. 200 mm termasuk support, blind flanges fitting weldolet,air realease dia 25 mm2dan pengecatan. Pipa dia. 150 mm Pipa dia. 100 mm Pipa dia. 50 mm
75
m
HARGA SATUAN Rp. 375,000
10 2
bh bh
10,459,980 824,380
104,599,800 1,648,760
- Check valve Dia. 150 mm Dia. 50 mm
2 1
bh bh
6,940,020 631,060
13,880,040 631,060
- Fleksible joint Dia. 150 mm Dia. 50 mm
4 2
bh bh
1,927,500 533,800
7,710,000 1,067,600
- Strainer Dia. 150 mm dia. 50 mm
2 1
bh bh
6,070,620 639,940
12,141,240 639,940
- Foot Valve ( lihat diimeter pipa pompa) Dia. 150 mm dia. 50 mm
2 1
bh bh
3,421,140 2,165,740
6,842,280 2,165,740
- Flow meter dia 150 mm
1
bh
21,156,250
21,156,250
- Pressure Gauge - Pressure Switch
3 3
bh bh
211,250 2,131,250
633,750 6,393,750
- Main Control Valve (MCV) dia. 150 mm c/w Alarm gong, dan acesoriesnya
1
set
55,875,000
55,875,000
Pressure Reducing Valve (PRV) dia 150 mm c/w stainer, valve , presurre gauge dan pemi paan
1
set
46,815,000
46,815,000
2.4 Safety Valve dia 150 mm
1
bh
21,156,550
21,156,550
2.5 FE 10 kg (gas)
1
bh
5,282,000
5,282,000
2.6 Fiting- fitting
1
lot
16,562,500
16,562,500
2.7 Material bantu termasuk pengecatan
1
lot
6,625,000
6,625,000
2.8 Pengetesan
1
lot
9,375,000
9,375,000
No
Uraian Knalpot pipa dia 80 mm termasuk isolasi panas (asbes type) dan diberi metal Jakecting 2.2 Assesories - Gate valve Dia. 150 mm Dia. 50 mm
2.3
sub total 2 3
Instalasi Pipa Kebakaran (Dari R Pompa dan dalam Shaft)
3.1 Instalasi Pipa Hydrant dan Sprinkler dalam Shaft s/d Lantai Atap Pengadaan dan pemasangan Pipa Black Steel
QTY
SAT
JUMLAH HARGA Rp. 28,125,000
445,886,172
No
Uraian Sch 40 (ASTM A53) berikut Support dia. 150 mm air realease valve dia 40mm dan Accessories
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
90 2
m bh
799,120 1,831,250
71,920,764 3,662,500
3.2 Fitting- fiting
1
lot
16,875,000
16,875,000
3.3 Material bantu Termasuk suport pipa tegak, klem pipa dan pengecatan.
1
lot
6,937,500
6,937,500
3.4 Pengetesan
1
lot
3,125,000
3,125,000
sub total 3 Instalasi Pipa Kebakaran di Site Plan Sprinkler 4.1 Instalasi pemadam kebakaran Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support Isolasi pipa dalam tanah (Wrapping) & Primer Coating dan Accessories dan Accessories dia. 150 mm dia. 100 mm
102,520,764
4
Galian Tanah 4.2 Gate valve dia. 100 mm 4.3 Check valve dia. 150 mm 4.5 Siamisse conection 4.6 Outdoor hyhdrant Pilar c/w Box Pilar Hidrand 4.7 Fitting- fiting 4.8 Material Bantu termasuk bak kontrol pondasi siamesse dan pilar hydrant 4.9 Pengetesan
437 40
meter meter
781,128 471,360
341,196,710 18,972,240
477
meter
20,000
9,541,000
5
bh
6,322,160
31,610,800
1 1 6 6 1
bh bh bh bh lot
6,940,020 3,073,500 3,242,410 3,024,250 18,125,000
6,940,020 3,073,500 19,454,460 18,145,500 18,125,000
1
lot
6,750,000
6,750,000
1
lot
6,250,000
6,250,000
sub total 4 5
480,059,230
Instalasi Pemadam Kebakaran Lantai Basement
5.1 Instalasi Sprinkler 1 Head sprinkler 2 Branch Control Valve dia 100 " lengkap dengan pressure gauge 3 Flow Switch dia. 80 mm 4 Gate valve dia. 100 mm dia. 25 mm 5 Sight Glass dia. 25 mm Pressure Gauge 7 Pengadaan dan pemasangan Pipa Black Steel
291 1
ttk bh
60,375 9,334,000
17,569,125 9,334,000
1
bh
1,171,250
1,171,250
1 3 1 1
bh bh bh bh
6,322,160 308,500 931,250 241,250
6,322,160 925,500 931,250 241,250
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
m m m m m m m m
799,128 470,400 343,704 258,240 186,000 132,138 117,030 88,728
55,139,832 83,543,040 15,810,384 5,164,800 12,276,000 38,055,744 28,262,745 46,316,016
2
bh
3,770,410
7,540,820
2
bh
1,218,750
2,437,500
72 125 33
m m m
799,128 471,360 343,704
57,137,652 58,920,000 11,342,232
dia. 100 mm dia. 65 mm
1 5
bh bh
6,322,160 4,399,590
6,322,160 21,997,950
5
Fitting- fiting
1
lot
21,087,500
21,087,500
6
Material Bantu
1
lot
7,237,500
7,237,500
No
Uraian 6
Sch 40 (ASTM A53) berikut Support dan Accessories dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm
5.2 Instalasi Hydrant 1 Indoor hydrant box lenkap dengan 2
3
4
Pemadam Api Ringan (PAR) FE 2 KG (Klas ABC) Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 150 mm dia. 100 mm dia. 80 mm
QTY
SAT
69 178 46 20 66 288 242 522
Gate valve
sub total 5
8
515,086,410
Instalasi Pemadam Kebakaran Lantai Satu
8.1 Instalasi Sprinkler 1 Head sprinkler 2 Branch Control Valve dia 100mm lengkap dengan pressure gauge 3 Flow Switch dia. 100 mm 4 Gate valve dia. 150 mm dia. 100 mm dia. 25 mm 5 Sight Glass dia. 25 mm Pressure Gauge
165 1
ttk bh
60,375 9,334,000
9,961,875 9,334,000
1
bh
1,171,250
1,171,250
1 1 3 2 1
bh bh bh bh bh
10,459,980 6,322,160 308,500 931,250 241,250
10,459,980 6,322,160 925,500 1,862,500 241,250
16 28 46
m m m
470,400 341,904 258,240
7,526,400 9,573,312 11,879,040
Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 100 mm dia. 80 mm dia. 65 mm
m m m m
HARGA SATUAN Rp. 186,000 132,138 117,030 88,728
JUMLAH HARGA Rp. 10,230,000 11,892,420 14,043,600 52,172,064
2
bh
3,770,410
7,540,820
3
bh
1,218,750
3,656,250
dia. 100 mm dia. 80 mm dia. 65 mm
16 55 8
m m m
471,360 343,704 258,240
7,541,760 18,903,720 2,065,920
Gate valve dia. 100 mm dia. 65 mm
1 2
bh bh
6,322,160 4,399,590
6,322,160 8,799,180
5
Fitting- fiting
1
lot
23,912,500
23,912,500
6
Material Bantu
1
lot
9,937,500
9,937,500
No
Uraian dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm 8.2 Instalasi Hydrant 1 Indoor hidran box 2
3
4
Pemadam Api Ringan (PAR) FE 2 KG (Klas ABC)
QTY
SAT
55 90 120 588
Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan
sub total 8( lantai Satu )
246,275,161
11 Instalasi Pemadam Kebakaran Lantai 2 ( dua ) 11.1 Instalasi Sprinkler 1 Head sprinkler 2 Branch Control Valve dia 100mm lengkap dengan pressure gauge 3 Flow Switch dia. 100 mm Sight Glass dia. 25 mm Pressure Gauge 4
5
Gate valve dia. 100 mm dia. 25 mm
125 1
ttk bh
60,375 9,334,000
7,546,875 9,334,000
1 1 1
bh bh bh
1,171,250 931,250 241,250
1,171,250 931,250 241,250
1 4
bh bh
6,322,160 308,500
6,322,160 1,234,000
18 12 42 78 82 136 595
mtr mtr mtr mtr mtr mtr mtr
471,360 343,704 258,240 185,400 139,338 117,030 88,728
8,484,480 4,124,448 10,846,080 14,461,200 11,425,716 15,916,080 52,810,906
2
bh
3,770,410
7,540,820
Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm
11.2 Instalasi Hydrant 1 Indoor hidrant box
No
Uraian 2
Pemadam Api Ringan (PAR) FE 5 KG (Klas ABC) FE 10 KG (Gas) Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 100 mm dia. 80 mm dia. 65 mm
QTY
SAT
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
3 1
bh bh
1,218,750 5,521,850
3,656,250 5,521,850
14 45 8
m m m
470,400 343,704 258,240
6,585,600 15,466,680 2,065,920
Gate valve dia. 100 mm dia. 65 mm
1 2
bh bh
6,322,160 4,399,590
6,322,160 8,799,180
5
Fitting- fiting
1
lot
22,923,500
22,923,500
6
Material Bantu
1
lot
23,328,000
23,328,000
3
4
sub total 11 (lantai tiga )
247,059,655
12 Instalasi Pemadam Kebakaran Lantai 3 ( tiga ) 12.1 Instalasi Sprinkler 1 Head sprinkler 2 Branch Control Valve dia 100mm lengkap dengan pressure gauge 3 Flow Switch dia. 100 mm Sight Glass dia. 25 mm 4 Pressure Gauge Gate valve dia. 100 mm dia. 25 mm
5
12.2 Instalasi Hydrant 1 Indoor hidran box
3
ttk bh
60,375 9,334,000
5,675,250 9,334,000
1 1 1
bh bh bh
1,171,250 931,250 241,250
1,171,250 931,250 241,250
1 4
bh bh
6,322,160 553,500
6,322,160 2,214,000
18 10 38 55 55 20 538
mtr mtr mtr mtr mtr mtr mtr
471,360 343,704 258,240 185,400 139,338 117,030 88,728
8,484,480 3,437,040 9,813,120 10,197,000 7,663,590 2,340,600 47,700,173
2
bh
3,770,410
7,540,820
3
bh
1,218,750
3,656,250
16
mtr
471,360
7,541,760
Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm
2
94 1
Pemadam Api Ringan (PAR) FE 5 KG (Klas ABC) Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 100 mm
mtr mtr
HARGA SATUAN Rp. 343,704 258,240
JUMLAH HARGA Rp. 18,903,720 2,065,920
1 2
bh bh
6,322,160 4,399,590
6,322,160 8,799,180
Fitting- fiting
1
lot
17,748,125
17,748,125
Material Bantu
1
lot
9,802,500
9,802,500
No
Uraian
QTY
SAT
dia. 80 mm dia. 65 mm
55 8
Gate valve dia. 100 mm dia. 65 mm
5 6
4
sub total 12 (lantai tiga )
197,905,598
13 Instalasi Pemadam Kebakaran Lantai 4 ( empat ) 13.1 Instalasi Sprinkler 1 Head sprinkler 2 Branch Control Valve dia 100mm lengkap dengan pressure gauge 3 Flow Switch dia. 100 mm Pressure Gauge Sight Glass dia. 25 mm 4
5
98 1
ttk bh
60,375 9,334,000
5,916,750 9,334,000
1 1 1
bh bh bh
1,171,250 241,250 931,250
1,171,250 241,250 931,250
1 4
bh bh
6,322,160 308,500
6,322,160 1,234,000
20 32 44 39 78 42 598
mtr mtr mtr mtr mtr mtr mtr
471,360 343,704 258,240 185,400 139,338 117,030 88,728
9,427,200 10,998,528 11,362,560 7,230,600 10,868,364 4,915,260 53,023,853
2
bh
3,770,410
7,540,820
3
bh
1,218,750
3,656,250
14 48 8
m m m
471,360 343,704 258,240
6,599,040 16,497,792 2,065,920
Gate valve dia. 100 mm dia. 65 mm
1 4
bh bh
6,322,160 4,399,590
6,322,160 17,598,360
Fitting- fiting
1
lot
19,632,500
19,632,500
Gate valve dia. 100 mm dia. 25 mm Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm
13.2 Instalasi Hydrant 1 Indoor hidran box 2 3
4
5
Pemadam Api Ringan (PAR) FE 5 KG (Klas ABC) Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 100 mm dia. 80 mm dia. 65 mm
No
Uraian 6
Material Bantu
QTY 1
SAT lot
HARGA SATUAN Rp. 9,847,500
sub total 13 (lantai empat )
JUMLAH HARGA Rp. 9,847,500 222,737,367
14 Instalasi Pemadam Kebakaran Lantai 5 ( lima ) 14.1 Instalasi Sprinkler 1 Head sprinkler 2 Branch Control Valve dia 100mm lengkap dengan pressure gauge 3 Flow Switch dia. 80 mm Pressure Gauge Sight Glass dia. 25 mm 4
5
Gate valve dia. 65 mm dia. 25 mm Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm dia. 32 mm dia. 25 mm
14.1 Instalasi Hydrant 1 Indoor hidran box - Hose rack , selang 30 m + Nozzle - Vander hydarnt dia 2 1/2 & 1 1/2 2 Pemadam Api Ringan (PAR) FE 5 KG (Klas ABC) 3 Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm 4 Gate valve dia. 100 mm dia. 65 mm
110 1
ttk bh
60,375 9,334,000
6,641,250 9,334,000
1 1 1
bh bh bh
1,171,250 241,250 931,250
1,171,250 241,250 931,250
2 4
bh bh
4,399,590 308,500
8,799,180 1,234,000
6 25 32 44 36 77 35 504
mtr m m m m m m m
471,360 471,360 343,704 258,240 185,400 139,338 117,030 88,728
2,828,160 11,784,000 11,136,010 11,362,560 6,674,400 10,729,026 4,096,050 44,718,912
2
bh
3,770,410
7,540,820
3
bh
2,700,000
8,100,000
6 14 45 8
mtr m m m
471,360 471,360 343,704 258,240
2,828,160 6,599,040 15,466,680 2,065,920
1 2
bh bh
6,322,160 4,399,590
6,322,160 8,799,180
5
Fitting- fiting
1
lot
18,490,000
18,490,000
6
Material Bantu
1
lot
9,245,000
9,245,000
sub total 14 (lantai lima )
TOTAL PEKERJAAN PEMADAM
217,138,258
2,845,815,864
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS. SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM LISTRIK No
Uraian
I
PEKERJAAN SYSTEM TEGANGAN MENENGAH Pengadaan Panel Tegangan Menengah lengkap dengan komponen busbar, metering, kontrol dan pemasangan (komponen dan accessories) dipasang/ diadakan oleh kontraktor tidak terbatas pada jumlah yang tercantum di bawah ini).
1
MVMDB (20 kV ) Spesifikasi Panel: Free Standing- metal enclosed cubicle, fixed type, Galvanized metal sheet. Rated voltage : 24 kV Serviced voltage : 20 kV Short time wistand current : 26 kA Insulation voltage level : a. 50 Hz- 1 minute : 50 kVrms b. Impulse 1,2/50 mS : 125 kVpeak Elektrodynamic withstand current : 36,5 kA Phase: 3 Arc extinguishing media : SF6 Cubicle thickness : min 2.0 mm In/out cable entry : bottom Busbar rated current : 630 A
Qty
Sat
H.Sat (Rp)
Total (Rp)
Incoming Cubicle Pengadaan dan pemasangan harus sesuai gambar rencana dan spesifikasi teknis sehingga berfungsi dengan baik Incoming cubicle SM 6, Type : IM 630A Rated Voltage 20 kV, 14.5A / 1 sec. LBS 3P 400 A, 16 kA/1s, internal Erthing switch, manual, Arrester 3 Phase Busbar 630 A Voltage Indicator, Earthing Switch, Heater, Shunt Trip
1
Unit
51,600,000
51,600,000
Out Going cubicle SM 6, Type : QM 630A Rated Voltage 20 kV, 16kA / 1 sec. LBS 3P 400A, 16 kA/1s, internal Erthing switch, manual 3 Phase Busbar 630 A Voltage Indicator, Earthing Switch, Heater, Shunt Trip Solfiuse 630A / 1000 kVA
1
Unit
80,606,250
80,606,250
Trafo 1000 kVA,20 kV/400 V, 3 ph, 50 Hz 5,5 % lengkap dengan peralatan kontrol yang dihubungkan ke MVMDP Type : Indoor, Oil Immersed, Total Filled Hermetically Sealed, IEC Std, SPLN Primery Voltage : 20kV Secondary Voltage : 400 V Impedance Voltage : 5.5% Perlengkapan Standar : Wheel, Earth Terminal, Lifting Eye, Oil Filiing Hole, Drain Plug Rating Plate dan Sertifikat Test Pabrik Perlengkapan Tambahan : Elastimold MV Bushing, DCMR
1
Unit
180,000,000
180,000,000
Grounding Cubicle Grounding Body Trafo Grounding Titik Netral Trafo Bak kontrol
1 1 1 3
ttk ttk ttk bh
2,500,000 2,500,000 3,500,000 300,000
2,500,000 2,500,000 3,500,000 900,000
Grounding PUTR/LVMDP
1
ttk
2,500,000
2,500,000
Bak kontrol
1
bh
H.Sat (Rp) 300,000
Material Bantu
1
Ls
3,000,000
3,000,000
Testing & Commissioning
1
Ls
6,000,000
6,000,000
No
Uraian
Qty
Sat
SUB TOTAL I
Total (Rp) 300,000
333,406,250
II
PEKERJAAN PANEL DAYA Pengadaan, pemasangan dan pengetesan Panel Daya lengkap dengan Accesoriesnya, Sehingga dapat berpungsi dengan baik.
1 2
PUTR/LVMDP PANEL KAPASITOR BANK 350 KVAR
1 1
Unit Unit
536,970,000 297,810,000
536,970,000 297,810,000
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
LP BS - A LP BS - B P - AC.BS LP BNK BS PP - LOUNDRY PP - HYDRANT PP - POMPA AB PP - SP (AIR KOTOR/ HUJAN) CP - SP1 (PARKIR BASEMENT) CP - SP2 (PARKIR BASEMENT) CP - SP3 (PARKIR BASEMENT) CP - SP4 (PARKIR SITE) CP - SP5 (PARKIR SITE) CP - GREASE TRAP (KITCHEN) CP - SUMPIT (LOUNDRY) CP - SEAWAGE CP - GREASE TRAP (DAPUR) PP - KITCHEN PP - STP LP - OL LP - G
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
5,530,000 9,850,000 12,510,000 5,260,000 7,800,000 14,420,000 20,750,000 9,600,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000 11,160,000 8,630,000 3,610,000
5,530,000 9,850,000 12,510,000 5,260,000 7,800,000 14,420,000 20,750,000 9,600,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000 11,160,000 8,630,000 3,610,000
24 25 26 27 28 29 30 31 32 33
LP 1A LP 1B PP - AC.1 PP - LAB LP BNK 1 LP FC PP - ATM PP - PRI PP - SCAN PP - RONTGEN
1 1 1 1 1 1 1 1 1 1
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
9,550,000 8,610,000 24,190,000 3,350,000 4,290,000 3,610,000 3,830,000 20,740,000 5,010,000 4,270,000
9,550,000 8,610,000 24,190,000 3,350,000 4,290,000 3,610,000 3,830,000 20,740,000 5,010,000 4,270,000
34 35 36 37 38
PP - OK LP - 2A LP - 2B PP - AC.2 PP - HD
1 1 1 1 1
Unit Unit Unit Unit Unit
6,960,000 7,460,000 8,400,000 14,850,000 6,710,000
6,960,000 7,460,000 8,400,000 14,850,000 6,710,000
39 40 41 42 43 44 45 46
LP - 3A LP - 3B PP - AC.3 PP - PR.3 PP - ICU PP - NICU PP - PN PP - HC
1 1 1 1 1 1 1 1
Unit Unit Unit Unit Unit Unit Unit Unit
10,140,000 13,950,000 14,850,000 20,160,000 8,200,000 6,680,000 5,700,000 6,690,000
10,140,000 13,950,000 14,850,000 20,160,000 8,200,000 6,680,000 5,700,000 6,690,000
1
Unit
9,850,000
9,850,000
47 LP - 4A
48 LP - 4B 49 PP - AC.4
1 1
Unit Unit
H.Sat (Rp) 10,790,000 14,250,000
50 LP - 5A 51 LP - 5B 52 PP - AC.5
1 1 1
Unit Unit Unit
7,550,000 9,680,000 13,520,000
7,550,000 9,680,000 13,520,000
53 54 56 57
1 1 1 1
Unit Unit Unit Unit
6,920,000 6,920,000 6,180,000 7,030,000
6,920,000 6,920,000 6,180,000 7,030,000
44 Grounding Panel OK, ICU, NICU, PR-3, PN, HC dan HD. Bak kontrol
1 1
ttk bh
2,500,000 300,000
2,500,000 300,000
45 Material Bantu
1
Ls
3,000,000
3,000,000
46 Testing & Commissioning
1
Ls
5,000,000
5,000,000
No
Uraian
P - LIFT 1 P - LIFT 2 PP - FAN / ATAP LP - ATAP
Qty
Sat
SUB TOTAL II
Total (Rp) 10,790,000 14,250,000
1,291,590,000
III KABEL FEEDER 1
KABEL TEGANGAN MENENGAH Pengadaan, pemasangan dan pengetesan Kabel TM lengkap dengan Ceilling End, Elastimold dan Accesoriesnya, sehingga dapat berpungsi dengan baik. Kabel dari Gardu PLN ke Incomonig Cubicle NXSEFGBY 3 x 120 mm2
110
m
600,000
66,000,000
15
m
500,000
7,500,000
Kabel Feeder Dari Trafo ke PUTR NYY 3 x 4 x (1 x 300 mm2)
16
m
3,750,000
60,000,000
Kabel Feeder Dari PKG ke PUTR NYY 3 x 4 x (1 x 300 mm2) Kabel Sensing Dari PKG ke PUTR NYY 4 x 2.5 mm2 Kabel Kontrol Dari Trafo (DGPT-2) ke PUTR NYY 3 x 2.5 mm2 Kabel Kontrol Dari Trafo (DGPT-2) ke Cubicle (Shunt Trip) NYY 3 x 2,5 mm2
15 15 15 15
m m m m
3,750,000 20,000 15,000 15,000
56,250,000 300,000 225,000 225,000
Lantai Basement LP BS - A. NYY 4 x 16 mm2 + BC 10 mm2 LP BS - B. NYY 4 x 25 mm2 + BC 16 mm2 P - AC.BS. NYY 4 x 25 mm2 + BC 16 mm2 LP BNK BS NYY 4 x 6 mm2 + BC 4 mm2 PP - LOUNDRY. NYY 4 x 16 mm2 + BC 10 mm2 PP - HYDRANT. FRC 4 x 1 x 120 mm2 + BC 50 mm2 PP - POMPA AB. NYY 4 x 35 mm2 + BC 25 mm2 PP - KITCHEN. NYY 4 x 16 mm2 + BC 10 mm2 PP - STP. NYY 4 x 6 mm2 + BC 4 mm2 LP - OL. NYY 4 x 6 mm2 + BC 4 mm2 LP - G. NYY 4 x 6 mm2 + BC 4 mm2
54 54 54 99 96 96 96 78 80 60 60
m m m m m m m m m m m
86,000 106,000 106,000 47,000 86,000 425,000 143,000 86,000 47,000 47,000 47,000
4,644,000 5,724,000 5,724,000 4,653,000 8,256,000 40,800,000 13,728,000 6,708,000 3,760,000 2,820,000 2,820,000
Lantai 1 LP 1A. NYY 4 x 35 mm2 + BC 25 mm2 LP 1B. NYY 4 x 25 mm2 + BC 16 mm2 PP - AC.1. NYY 4 x 120 mm2 + BC 50 mm2 PP - LAB. NYY 4 x 10 mm2 + BC 6 mm2
58 58 58 70
m m m m
143,000 106,000 468,000 74,000
8,294,000 6,148,000 27,144,000 5,180,000
Kabel dari Outgoing Cubicle ke Trafo N2XSY 3 x 1x 95 mm2 2
KABEL TEGANGAN RENDAH Pengadaan, pemasangan dan pengetesan Kabel Feeder lengkap dengan Cable Gland, Suport dan Accesoriesnya, sehingga dapat berpungsi dengan baik.
Kabel Feeder Dari PUTR ke :
No
95 102 113 58
m m m m
H.Sat (Rp) 47,000 47,000 47,000 86,000
18 35
m m
74,000 74,000
1,332,000 2,590,000
110 72 72 72 118
m m m m m
106,000 106,000 106,000 190,000 86,000
11,660,000 7,632,000 7,632,000 13,680,000 10,148,000
66 66 66 16
m m m m
106,000 106,000 190,000 143,000
6,996,000 6,996,000 12,540,000 2,288,000
32 67 61 79
m m m m
74,000 74,000 74,000 74,000
2,368,000 4,958,000 4,514,000 5,846,000
Lantai 4 LP - 4A. NYY 4 x 25 mm2 + BC 16 mm2 PP - AC.3. NYY 4 x 50 mm2 +BC 35 mm2 PP - AC.4. NYY 4 x 50 mm2 + BC 35 mm2
70 70 70
m m m
106,000 190,000 190,000
7,420,000 13,300,000 13,300,000
Lantai 5 LP - 5A. NYY 4 x 25 mm2 + BC 16 mm2 LP - 5B. NYY 4 x 25 mm2 + BC 16 mm2 PP - AC.5. NYY 4 x 50 mm2 + BC 35 mm2
74 74 74
m m m
106,000 106,000 190,000
7,844,000 7,844,000 14,060,000
90 136 106 100 100
m m m m m
150,000 150,000 74,000 86,000 86,000
13,500,000 20,400,000 7,844,000 8,600,000 8,600,000
20
m
17,000
340,000
20
m
13,000
260,000
40
m
13,000
520,000
16 16
m m
30,000 360,000
480,000 5,760,000
7 7 16
m m m
220,000 200,000 50,000
1,540,000 1,400,000 800,000
7
m
30,000
210,000
47 64 110 82
m m m m
35,000 35,000 35,000 35,000
1,645,000 2,240,000 3,850,000 2,870,000
Uraian LP BNK 1. NYY 4 x 6 mm2 + BC 4 mm2 LP FC. NYY 4 x 6 mm2 + BC 4 mm2 PP - ATM. NYY 4 x 6 mm2 + BC 4 mm2 PP - PRI. NYY 4 x 16 mm2 + BC 10 mm2 Kabel Dari PP - PRI Ke : PP - SCAN. NYY 4 x 10 mm2 +BC 6 mm2 PP - RONTGEN. NYY 4 x 10 mm2 + BC 6 mm2 Lantai 2 PP - OK. NYY 4 x 25 mm2 + BC 16 mm2 LP - 2A. NYY 4 x 25 mm2 + BC 16 mm2 LP - 2B. NYY 4 x 25 mm2 + BC 16 mm2 PP - AC.2. NYY 4 x 50 mm2 + BC 35 mm2 PP - HD. NYY 4 x 16 mm2 + BC 10 mm2 Lantai 3 LP - 3A. NYY 4 x 25 mm2 + BC 16 mm2 LP - 3B. NYY4 x 25mm2 + BC 16 mm2 PP - AC.3. NYY 4 x 50 mm2 +BC 35 mm2 PP - PR.3. NYY 4 x 35 mm2 + BC 25 mm2 Kabel Dari PP - PR3 Ke : PP - ICU. NYY 4 x 10 mm2 + BC 6 mm2 PP - NICU. NYY 4 x 10 mm2 + BC 6 mm2 PP - PN. NYY 4 x 10 mm2 + BC 6 mm2 PP - HC. NYY 4 x 10 mm2 + BC 6 mm2
Lantai Atap P - LIFT 1. FRC 4 x 35 mm2 + BC 25 mm2 P - LIFT 2. FRC 4 x 35 mm2 + BC 25 mm2 PP - P. BOOSTER. NYY 4 x 10 mm2 + BC 6 mm2 PP - FAN / ATAP. NYY 4 x 16 mm2 + BC 10 mm2 LP - ATAP. NYY 4 x 16 mm2 + BC 10mm2 Kabel Dari PP - Loundry Ke Water Heater 300 L (Loundry) NYM 4 x 2,5 mm2 Kabel Dari PP - Kitchen Ke Water Heater 100 L (Kitchen) NYM 3 x 2,5 mm2 Kabel Dari PP - Kitchen Ke Water Heater 100 L (Dapur) NYM 3 x 2,5 mm2 Kabel Dari PP - Hydrant Ke : CP - Diesel Pump FRC 5 x 1 x 2,5 mm2 CP - Electric Pump FRC 4 x 1 x 95 mm2 + BC 50 mm2 Kabel Dari CP - Electric Pump Ke Motor Pump FRC 3 x 1 x 50 mm2 + BC 50 FRC 3 x 1 x 50 mm2 CP - Electric Jokey FRC 4 x 1 x 6 mm2 + BC 4 mm2 Kabel Dari CP - Jokey Pump Ke Motor Pump FRC 4 x 1 x 2,5 mm2 Kabel Dari PP - SP (AIR KOTOR/HUJAN) Ke : CP - PS-1 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-2 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-3 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-4 NYY 4 x 4 mm2 + BC 4 mm2
Qty
Sat
Total (Rp) 4,465,000 4,794,000 5,311,000 4,988,000
74 82 104 150 190
m m m m m
H.Sat (Rp) 35,000 35,000 35,000 35,000 35,000
Kabel Dari PP - A.B Ke : Pompa Transfer 1 dan 2 NYY 4 x 4 mm2 Pompa Transfer 1 dan 2 NYY 3 x 4 mm2 CP - Deep Wheel NYFGBY 4 x 4 mm2 + BC 4mm2 PP - SP (AIR KOTOR/HUJAN) NYY 4 x 16 mm2 + BC 10 mm2
15 15 80 50
m m m m
35,000 23,000 35,000 86,000
525,000 345,000 2,800,000 4,300,000
Kabel dari LP - 2 Ke Auto Cluv NYY 3 x 6 mm2
84
m
32,000
2,688,000
Material Bantu
1
Ls
10,000,000
10,000,000
Testing & Commissioning
1
Ls
5,000,000
5,000,000
No
Uraian CP - PS-5 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-6 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-7 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-8 NYY 4 x 4 mm2 + BC 4 mm2 CP - PS-9 NYY 4 x 4 mm2 + BC 4 mm2
Qty
Sat
SUB TOTAL III
Total (Rp) 2,590,000 2,870,000 3,640,000 5,250,000 6,650,000
648,926,000
IV LIGHTING & SOCKET OUTLET INSTALLATION Instalasi Penerangan dan Stop Kontak menggunakan kabel NYM 3 x 2.5 mm2, Inconduit PVC High Impact 20 mm2 beserta assesorisnya sehingga dapat berfungsi dengan baik. 1
LANTAI BASEMENT & SITE Down Light 1 x 13 W Down Light 1 x 13 W c/w Battery Down Light 2 x 13 W TL 1 x 36 W TKO TL 1 x 36 W TKO + Battery TL 2 x 36 W TKI + Battery TL 2 x 36 W TKI + Battery TL 2 x 18 W TKI TL 1 x 18 W TKI + Battery Exit 2 x 10 W + Battery Stop Kontak 1Phase 10 A 200 Watt
60 5 19 117 9 16 1 66 10 2 118
bh bh bh bh bh bh bh bh bh bh bh
195,750 907,000 260,000 235,550 899,450 515,313 1,159,375 515,313 515,313 949,375 45,625
11,745,000 4,535,000 4,940,000 27,559,350 8,095,050 8,245,000 1,159,375 34,010,625 5,153,125 1,898,750 5,383,750
Instalasi Penerangan, NYM 3x2,5 mm2 (In Conduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (In Conduit PVC dia. 20)
305 118
ttk ttk
211,250 241,250
64,431,250 28,467,500
77 16 4 77
bh bh bh ttk
663,750 5,714,280 1,083,750 350,000
51,108,750 91,428,480 4,335,000 26,950,000
Lampu Taman Mercury 1 x 80 W Lampu Jalan SON 1 x 150 W Lampu Sorot Instalasi Penerangan Luar, NYYGBY 4x4 mm2 2
3
LANTAI SATU Down Light 1 x 13 W Down Light 1 x 13 W c/w Battery TL 1 x 36 W TKI TL 2 x 18 W TKI TL 2 x 18 W TKI + Battery Exit 2 x 10 W + Battery Stop Kontak 1Phase 10 A 200 Watt
175 13 2 131 16 3 185
bh bh bh bh bh bh bh
187,000 875,000 223,050 296,190 947,910 897,750 45,625
32,725,000 11,375,000 446,100 38,800,890 15,166,560 2,693,250 8,440,625
Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)
340 185
ttk ttk
211,250 241,250
71,825,000 44,631,250
LANTAI DUA Down Light 1 x 13 W Down Light 1 x 13 W c/w Battery TL 1 x 36 W TKI TL 4 x 18 W TKI (Acrillic) TL 2 x 18 W TKI
120 8 2 12 64
bh bh bh bh bh
187,000 907,000 223,050 916,000 296,190
22,440,000 7,256,000 446,100 10,992,000 18,956,160
TL 2 x 18 W TKI (Acrillic) TL 2 x 18 W TKI + Battery Wall Lamp 13 Watt Exit 2 x 10 W + Battery Stop Kontak 1Phase 10 A 200 Watt
21 21 4 2 151
bh bh bh bh bh
H.Sat (Rp) 572,000 947,910 150,000 897,750 45,625
Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)
250 151
ttk ttk
211,250 241,250
52,812,500 36,428,750
LANTAI TIGA Down Light 1 x 13 W Down Light 1 x 13 W c/w Battery Down Light 2 x 13 W TL 1 x 36 W TKI TL 2 x 18 W TKI TL 2 x 18 W TKI (Acrillic) TL 2 x 18 W TKI + Battery TL 2 x 18 W TKI Acrillic + Battery. Wall Lamp PL C 1 x 13 w Exit 2 x 10 W + Battery Stop Kontak 1Phase 10 A 200 Watt Receptacle 1Phase 3000 Watt (ICU dan NICU)
112 8 27 3 44 47 11 4 4 2 286 2
bh bh bh bh bh bh bh bh bh bh bh bh
20,944,000 7,256,000 7,020,000 669,150 13,032,360 26,884,000 10,427,010 4,982,000 600,000 1,795,500 13,048,750 280,000
Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20) Instalasi Receptacle 1Phase 3000 Watt
258 286 2
ttk ttk ttk
187,000 907,000 260,000 223,050 296,190 572,000 947,910 1,245,500 150,000 897,750 45,625 140,000 3 211,250 241,250 241,250
LANTAI EMPAT Down Light 1 x 13 W Down Light 1 x 13 W c/w Battery Down Light 2 x 13 W TL 1 x 36 W TKI TL 2 x 18 W TKI TL 2 x 18 W TKI + Battery Exit 2 x 10 W + Battery Stop Kontak 1Phase 10 A 200 Watt
134 7 83 2 28 2 2 220
bh bh bh bh bh bh bh bh
187,000 907,000 260,000 223,050 296,190 947,910 897,750 45,625
25,058,000 6,349,000 21,580,000 446,100 8,293,320 1,895,820 1,795,500 10,037,500
Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)
262 220
ttk ttk
211,250 241,250
55,347,500 53,075,000
Down Light 1 x 13 W Down Light 1 x 13 W c/w Battery Down Light 2 x 13 W TL 1 x 36 W TKI TL 2 x 18 W TKI TL 2 x 18 W TKI + Battery Wall Lamp PL C 1 x 13 w Exit 2 x 10 W + Battery Stop Kontak 1Phase 10 A 200 Watt
158 6 60 1 11 1 38 2 194
bh bh bh bh bh bh bh bh bh
187,000 907,000 260,000 223,050 296,190 947,910 150,000 897,750 45,625
29,546,000 5,442,000 15,600,000 223,050 3,258,090 947,910 5,700,000 1,795,500 8,851,250
Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)
266 194
ttk ttk
211,250 241,250
56,192,500 46,802,500
12 17 27 4 13
bh bh bh bh bh
1,083,750 150,000 235,550 899,450 45,625
13,005,000
ttk bh
211,250 241,250
12,675,000 3,136,250
No
4
5
6
7
Uraian
Qty
Sat
Total (Rp) 12,012,000 19,906,110 600,000 1,795,500 6,889,375
54,502,500 68,997,500 482,500
LANTAI LIMA
LANTAI ATAP Lampu Sorot Wall Lamp 13 Watt TL 1 x 36 W TKO TL 1 x 36 W TKO + Battery Stop Kontak 1Phase 10 A 200 Watt Instalasi Penerangan, NYM 3x2,5 mm2 (In Conduit PVC dia. 20) Instalasi Stop Kontak, NYM 3x2,5 mm2 (In Conduit PVC dia. 20)
60 13
6,359,850 3,597,800 593,125
No
Uraian
Qty
Sat
H.Sat (Rp)
Total (Rp)
Material Bantu
1
lot
12,500,000
12,500,000
Testing & Commissioning
1
lot
7,500,000
7,500,000
SUB TOTAL IV
V UPS Pengadaan, pemasangan dan pengetesan UPS 12000 VA lengkap dengan Battry, Instalasi pengkabelan dan Accesoriesnya, sehingga dapat berpungsi dengan baik.
1,444,609,010
3
Unit
80,700,000
242,100,000
Material Bantu
1
lot
500,000
500,000
Testing & Commissioning
1
lot
500,000
500,000
SUB TOTAL V VI KABEL TRAY Pengadaan dan pemasangan Rak Kabel lengkap dengan jointing Suport, Hanger rood, dan Accesoriesnya sehingga dapat berpungsi dengan baik. 1 LANTAI BASEMENT & SITE a. Straight W = 600 W = 500 W = 300 W = 200 b. Elbow 200 x 300 300 x 300 c Tee 600 x 600 x 300 300 x 600 x 300 300 x 200 x 200 300 x 300 x 200 2 LANTAI 1 a. Straight W = 400 W = 300 W = 200 b. Elbow 300 x 300 300 x 200 200 x 200 c Tee 300 x 400 x 300 300 x 300 x 200 300 x 200 x 200 3 LANTAI 2 a. Straight W = 400 W = 300 W = 200 b. Elbow 400 x 400 c Tee 300 x 400 x 200 4 LANTAI 3 a. Straight W = 300
243,100,000
3
Unit
80,700,000
242,100,000
20 30 200 65
m m m m
578,125 495,625 330,625 247,500
11,562,500 14,868,750 66,125,000 16,087,500
1 1
bh bh
431,250 431,250
431,250 431,250
2 1 1 1
bh bh bh bh
1,111,875 1,111,875 583,125 583,125
2,223,750 1,111,875 583,125 583,125
4 67 75
m m m
413,125 330,625 247,500
1,652,500 22,151,875 18,562,500
2 1 4
bh bh bh
431,250 431,250 303,750
862,500 431,250 1,215,000
1 1 1
bh bh bh
731,250 583,125 583,125
731,250 583,125 583,125
14 40 35
m m m
413,125 330,625 247,500
5,783,750 13,225,000 8,662,500
1
bh
555,000
555,000
1
bh
731,250
731,250
46
m
330,625
15,208,750
No W = 200 b. Elbow 400 x 400 300 x 300 300 x 200 200 x 200 c Tee
Uraian
45
m
H.Sat (Rp) 247,500
2 1 1 1
bh bh bh bh
555,000 431,250 431,250 303,750
Qty
Sat
Total (Rp) 11,137,500 1,110,000 431,250 431,250 303,750
No
Uraian 300 x 400 x 300 300 x 200 x 200
5 LANTAI 4 a. Straight W = 400 W = 300 b. Elbow 400 x 400 c Tee 300 x 400 x 300 6 LANTAI 5 a. Straight W = 400 W = 300 b. Elbow 400 x 400 c Tee 300 x 400 x 300 d
e
Cable Tray Vertikal Straight w = 600 Material Bantu
1 1
bh bh
H.Sat (Rp) 731,250 583,125
15 75
m m
449,721 283,461
6,745,819 21,259,594
1
bh
555,000
555,000
1
bh
731,250
731,250
15 75
m m
413,125 330,625
6,196,875 24,796,875
1
bh
555,000
555,000
1
bh
731,250
731,250
30
m
578,125
17,343,750
1
lot
10,000,000
10,000,000
Qty
Sat
Total (Rp) 731,250 583,125
SUB TOTAL VI
550,691,038
TOTAL I s.d VI
4,512,322,298
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM GENSET No
Uraian
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
A
PERALATAN UTAMA
1
Pengadaan Generator-set dengan kapasitas 1050 KVA dengan putaran 1500 rpm, 220 volt / 380 volt - 400 volt 3 phase, lengkap dengan panel control, vibration mounting dan industrial silincer
1
Unit
1,475,000,000
1,475,000,000
Pengadaan dan pemasangan panel genset lengkap dengan AMF
1
Unit
115,000,000
115,000,000
Instalasi Genset - Pekerjaan persiapan - Mobilisasi matrial dan alat-alat kerja - Dokumentasi shop drawing - Kebersihan tempat kerja
1
Lot
15,000,000
15,000,000
Setting dan Levelling Genset dan PKG diatas pondasi
1
Lot
18,000,000
18,000,000
rator ke PKG, NYY 4 x 3 x 1 x 300mm2 4 Kabel Ladder 400 x 100
15 15
Meter Meter
4,275,000 325,000
64,125,000 4,875,000
5 Pengadaan dan pemasangan sound attenuator dan louvre grill - Intake attenuator ukuran 2500 x 2000 x 1500 mm - Exhaust attenuator ukuran 3500 x 1500 x 1500 mm - Intake grill ukuran 2500 x 2000 mm - Exhaust grill ukuran 2500 x 1500 mm
1 1 1 1
Unit Unit Unit Unit
21,562,500 19,406,250 7,500,000 6,750,000
21,562,500 19,406,250 7,500,000 6,750,000
6 Pengadaan dan pemasangan ducting radiator lengkap dengan seng dengan ketebalan BJLS 100
1
Unit
4,500,000
4,500,000
7 Pompa bahan bakar dengan kapasitas 30 Lpm Ebara
1
Unit
18,250,000
18,250,000
8 Pengdaan dan pemasangan instalasi bahan bakar lengkap dengan pipa black steel valve dan stainer
1
Lot
18,875,000
18,875,000
9 Pengdaan dan pemasangan piompa tangan (hand pump)
1
Unit
1,500,000
1,500,000
10 Pengdaan dan pemasangan tangki harian 1000 liter
1
Unit
9,500,000
9,500,000
11 Pengdaan dan pemasangan tangki bulanan 10000 liter
1
Unit
45,000,000
45,000,000
188
Meter
195,000
36,660,000
13 Grounding sytem dengan BC 50mm2
1
Lot
10,000,000
10,000,000
14 Pengdaan dan pemasangan kabel kontrol
1
Lot
4,500,000
4,500,000
15 Testing dan Commisioning
1
Lot
15,000,000
15,000,000
16 Izin Depnaker
1
Unit
3,500,000
3,500,000
2
B 1
2
3 Pengadaan dan pemasangan kabel power dari Gene -
12 Pengdaan dan pemasangan Rock wool density 80 kg/cm tebal 2" lengkap dengan waremesh
TOTAL
1,914,503,750
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM ELEKTRIKAL H.Sat (Rp)
Total (Rp)
No
Uraian
Qty
Sat
1
Pengadaan dan pemasangan batang penangkal petir menggunakan pipa galvanis diameter 2" dan 3 " dilengkapi Head protector merk EF dengan radius pengamanan 100 m 2.
1
set
18,000,000
18,000,000
Pengadaan dan pemasangan batang pentanahan meng gunakan elektroda tembaga dengan diameter 3/4", pipa galvanis dengan BC 50 mm2 dengan minimal keda laman 12 meter
1
unit
3,000,000
3,000,000
Pembuatan bak kontrol 40 x 40 x 40 cm komplit dengan cover
1
unit
400,000
400,000
Pengadaan dan pemasangan kabel Coaxial Diameter 2x 35 mm2 didalampipa PVC diameter 1 " pada kolom terpasang rapi.
40
meter
450,000
18,000,000
Testing & Commisioning
1
lot
2,000,000
2,000,000
2
3
4
5
Total
41,400,000
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM TELEPON DAN DATA No A
Uraian
Qty
Sat
H.Sat (Rp)
Total (Rp)
PERALATAN UTAMA Pengadaan dan Pemasangan peralatan, sehingga dapat berfungsi dengan baik, termasuk pengadaan support suport yang dibutuhkan
1
Pengurusan Perizinan pemasangan line telepon
16
2
Pengadaan dan Pemasangan MDF150 Pair, Attenden Console. PABX Kapasitas 24/120 Extention, Billing System Battery + Charger Komputer Pentium 4, Hard disc 20 GB, Ram 128.
1
Material Bantu
3
4
600,000
9,600,000
set
135,000,000
135,000,000
1
Ls
3,000,000
3,000,000
Testing & Comissioning
1
lot
2,000,000
2,000,000
PANEL DISTRIBUSI ( TB - TP ) Lantai Basement ( B) 10 pair Lantai Satu ( 1 ) 40 pair Lantai Dua ( 2 ) 30 pair Lantai Tiga ( 3 ) 20 pair Lantai Empat ( 4 ) 20 pair Lantai Lima ( 5 ) 30 pair
1 1 1 1 1 1
unit unit unit unit unit unit
1,400,000 3,800,000 2,600,000 2,600,000 2,600,000 2,600,000
1,400,000 3,800,000 2,600,000 2,600,000 2,600,000 2,600,000
57 67 77 87 97 107
mtr mtr mtr mtr mtr mtr
25,000 100,000 75,000 50,000 50,000 75,000
1,425,000 6,700,000 5,775,000 4,350,000 4,850,000 8,025,000
Kabel distribusi ITC 3 x 0.8 mm dari MDF menuju lantai Lantai Basement ( B ) 10 pair Lantai Satu ( 1 ) 40 pair Lantai Dua ( 2 ), 30 pair Lantai Tiga ( 3 ), 20 pair Lantai Empat ( 4 ), 20 pair Lantai Lima ( 5 ), 30 pair Sub Total I
B
196,325,000
PEKERJAAN INSTALASI TELEPON Pemasangan isntalasi kabel telepon menggunakan kabel ITC 3 x 0.6 mm didalam conduit PVC high impact diameter 20 mm komplit dengan sok, clamp, T- Dos dan Outlet Telepon, merk Clipsal, MK, Legrand,
5.1. Lantai Basement 1 Pengadaan dan pemasangan instalasi Extention telephone
6
buah
290,000
1,740,000
5.2. Lantai Satu 1 Pengadaan dan pemasangan instalasi line telephone 2 Pengadaan dan pemasangan instalasi Extention telephone
6 31
buah buah
290,000 290,000
1,740,000 8,990,000
5.3 1 2 3 4
Lantai Dua Pengadaan dan pemasangan instalasi line telephone Pengadaan dan pemasangan instalasi Extention telephone Pengadaan dan pemasangan instalasi Public telepon Card Pengadaan dan pemasangan instalasi Faximile
1 19 1 2
buah buah buah buah
290,000 290,000 290,000 290,000
290,000 5,510,000 290,000 580,000
5.4 1 2
Lantai Tiga Pengadaan dan pemasangan instalasi Public telephone coin Pengadaan dan pemasangan instalasi Extention telephone
1 11
buah buah
290,000 290,000
290,000 3,190,000
buah
H.Sat (Rp) 290,000
Total (Rp) 290,000
1 4 1
buah buah buah
290,000 290,000 290,000
290,000 1,160,000 290,000
Lantai Lima Pengadaan dan pemasangan instalasi Public telephone coin Pengadaan dan pemasangan instalasi Extention telephone Pengadaan dan pemasangan instalasi Public telepon Card
1 21 1
buah buah buah
290,000 290,000 290,000
290,000 6,090,000 290,000
5.7 1
Lantai Atap ( R. Mesin Lift ) Pengadaan dan pemasangan instalasi Extention telephone
1
buah
290,000
290,000
5.8 1 2
HANDSET Hand set telepon digital Hand set telepon digital dan display
90 1
unit unit
250,000 1,440,000
22,500,000 1,440,000
5.9
Testing & Comissioning
1
lot
6,000,000
6,000,000
No
Qty
Sat
Pengadaan dan pemasangan instalasi Public telepon Card
1
5.5 1 2 3
Lantai Empat Pengadaan dan pemasangan instalasi Public telephone coin Pengadaan dan pemasangan instalasi Extention telephone Pengadaan dan pemasangan instalasi Public telepon Card
5.6 1 2 3
3
Uraian
Sub Total II
61,550,000
Total I-II
A
257,875,000
PEKERJAAN SISTEM DATA PERALATAN UTAMA
1
Pengadaan dan Pemasangan peralatan, Utama sehingga dapat berfungsi dengan baik, termasuk pengadaan support suport yang dibutuhkan
2
Pengadaan dan Pemasangan SERVER lengkap dengan software dan Accesoriesnya sehingga dapat ber pungsi dengan baik
1
set
125,000,000
125,000,000
3
Hub Switch 60 port
1
unit
23,000,000
23,000,000
B
PEKERJAAN INSTALASI
5.1. Lantai Basement 1 Pengadaan dan pemasangan instalasi Data
2
Titik
430,000
860,000
5.2. Lantai Satu 1 Pengadaan dan pemasangan instalasi Data
22
Titik
430,000
9,460,000
5.3 1
Lantai Dua Pengadaan dan pemasangan instalasi Data
20
Titik
430,000
8,600,000
5.4 1
Lantai Tiga Pengadaan dan pemasangan instalasi Data
4
Titik
430,000
1,720,000
5.5 1
Lantai Empat Pengadaan dan pemasangan instalasi Data
4
Titik
430,000
1,720,000
5.6 1
Lantai Lima Pengadaan dan pemasangan instalasi Data
5
Titik
430,000
2,150,000
Pemasangan instalasi kabel telepon menggunakan kabel Data CAT 5 didalam conduit PVC high impact diameter 20 mm komplit dengan sok, clamp, T- Dos dan Outlet Telepon, merk Clipsal, MK, Legrand,
1 1
ttk bh
2,500,000 300,000
Total (Rp) 2,500,000 300,000
BC 1 x 25mm2
35
mtr
15,000
525,000
Material Bantu
1
Ls
3,000,000
3,000,000
lot
6,000,000
6,000,000
No 5.6
Uraian
Qty
Grounding Arus Lemah (semua panel arus lemah) Bak kontrol
Testing & Comissioning Sub Total I
1
Sat
H.Sat (Rp)
36,835,000
294,710,000
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM TATA SUARA No
A.
1 2 3 4 5 6 7 8 9 10 11 12
Uraian
PERALATAN UTAMA Pengadaan dan Pemasangan peralatan utama pada ruang control sehingga berfungsi dengan baik, sbb: Tape cassette player CD Player Paging Mikrophone Mixer Power Amplifier 240 Watt Cabinet Rack Pengadaan dan pemasangan terminal box TB-B Pengadaan dan pemasangan terminal box TB-1 Pengadaan dan pemasangan terminal box TB-2 Pengadaan dan pemasangan terminal box TB-3 Pengadaan dan pemasangan terminal box TB-4 Pengadaan dan pemasangan terminal box TB-5
Qty
1 1 1 1 2 1 1 1 1 1 1 1
Sat
buah buah buah buah buah set unit unit unit unit unit unit
H.Sat
Total
(Rp)
(Rp)
5,400,000 4,560,000 1,800,000 14,400,000 9,600,000 7,800,000 960,000 960,000 960,000 960,000 960,000 960,000
Sub Total I B.
1 2 3 4 5 6
7
8
58,920,000
PERALATAN CAR CALL Pengadaan dan Pemasangan peralatan Car Call pada ruang reception sehingga berfungsi dengan baik, sbb: Paging Mikrophone Premixer Power Amplifier 240 Watt Cabinet Rack Pengadaan dan pemasangan terminal box TB-B Pengadaan dan pemasangan Horn speaker 30 Watt lengkap dengan tiang dan fondasi serta pengkabelan nya dan berfungsi dengan baik. ( Site ) Pengadaan dan pemasangan Coloumn speaker leng kap dengan pengkabelannya dan berfungsi dengan baik.( Lantai Basement ). Instalasi Horn speaker dan Coloumn speaker
1 1 1 1 1
unit unit unit unit unit
1,800,000 6,000,000 9,600,000 12,000,000 960,000
1,800,000 6,000,000 9,600,000 12,000,000 960,000
4
set
240,000
960,000
3 7
buah titik
240,000 192,000
720,000 1,344,000
Sub Total II C.
5,400,000 4,560,000 1,800,000 14,400,000 19,200,000 7,800,000 960,000 960,000 960,000 960,000 960,000 960,000
33,384,000
PEKERJAAN INSTALASI Pemasangan Instalasi Sound System dengan meng gunakan kabel NYMHY 2x1,5 mm2 di dalam conduit PVC high impact diameter 20 mm2 komplit dengan sok, clamp, Tee dos, dan matrial bantu lainnya, se sehingga dapat berfungsi dengan baik.
C.1 1 2
Lantai Basement ( B ) Pengadaan dan pemasangan ceilling speaker Instalasi ceilling speaker
C.2 1 2
Lantai Satu ( 1 ) Pengadaan dan pemasangan ceilling speaker Pengadaan dan pemasangan wall speaker pada tangga kebakaran Instalasi ceilling speaker
3
15 15
buah buah
180,000 192,000
2,700,000 2,880,000
31
buah
180,000
5,580,000
2 31
buah titik
240,000 192,000
480,000 5,952,000
No 4 C.3 1 2 3 4 C.4 1 2 3 4 C.5 1 2 3 4 C.6 1 2 3 4 C.7 1 2 3 4 C.8
Uraian Instalasi wall speaker pada tangga kebakaran Lantai dua ( 2 ) Pengadaan dan pemasangan ceilling speaker Pengadaan dan pemasangan wall speaker pada tangga kebakaran Instalasi ceilling speaker Instalasi wall speaker pada tangga kebakaran Lantai Tiga ( 3 ) Pengadaan dan pemasangan ceilling speaker Pengadaan dan pemasangan wall speaker pada tangga kebakaran Instalasi ceilling speaker Instalasi wall speaker pada tangga kebakaran Lantai Empat ( 4 ) Pengadaan dan pemasangan ceilling speaker Pengadaan dan pemasangan wall speaker pada tangga kebakaran Instalasi ceilling speaker Instalasi wall speaker pada tangga kebakaran Lantai Lima ( 5 ) Pengadaan dan pemasangan ceilling speaker Pengadaan dan pemasangan wall speaker pada tangga kebakaran Instalasi ceilling speaker Instalasi wall speaker pada tangga kebakaran Lantai Atap ( A ) Pengadaan dan pemasangan wall speaker pada Ruang mesin lift Pengadaan dan pemasangan wall speaker pada tangga kebakaran Instalasi wall speaker pada Ruang mesin Lift Instalasi wall speaker pada tangga kebakaran Testing & Comissioning Sub Total III Total I-III
Qty
Sat
H.Sat
Total (Rp) 384,000
2
titik
(Rp) 192,000
14
buah
180,000
2,520,000
2 14 2
buah titik titik
240,000 192,000 192,000
480,000 2,688,000 384,000
16
buah
180,000
2,880,000
2 16 2
buah titik titik
240,000 192,000 192,000
480,000 3,072,000 384,000
12
buah
180,000
2,160,000
2 12 2
buah titik titik
240,000 192,000 192,000
480,000 2,304,000 384,000
12
buah
180,000
2,160,000
2 12 2
buah titik titik
240,000 192,000 192,000
480,000 2,304,000 384,000
2
buah
240,000
480,000
1 2 1
buah titik titik
240,000 192,000 192,000
240,000 384,000 192,000
1
lot
6,000,000
6,000,000 48,816,000 141,120,000
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM CCTV No
V
Uraian
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
PERALATAN UTAMA
V.1 PERALATAN UTAMA DAN KABEL UTAMA Peralatan Utama Ruang Kontrol Basement 1 Digital Multiplexer Recorder hard disk 320 Gb, 16 Canel lengkap dengan controler eternet. 2 LCD monitor 21" 4 UPS 1KVA lengkap dengan back up battery, rectifier dan line arester V.2 KABEL UTAMA Ruang Kontrol Lt 2 1 Pengkabelan untuk peralatan utama CCTV 2 Pekerjaan grounding sistem untuk peralatan utama CCTV V.3 PERALATAN 1 LT. BASEMENT Camera Fix Dome 2 LT.SATU Camera Fix Dome 3 SITE PLAN Camera Fix Dome Night Day + Housing Camera Fix Dome Night Day 4 LT.DUA Camera Fix Dome 5 LT.TIGA Camera Fix Dome 6 LT.EMPAT Camera Fix Dome 7 LT.LIMA Camera Fix Dome V.4 INSTALASI 1 LT. BASEMENT Kabel Power NYM 3x1.5mm + conduit untuk camera Coaxial Cable RG - 6 7 Ohm + conduit untuk camera 2 LT. SATU Kabel Power NYM 3x1.5mm + conduit untuk camera Coaxial Cable RG - 6 7 Ohm + conduit untuk camera 3 LT. SITE PLAN Kabel Power NYM 3x1.5mm + conduit untuk camera Coaxial Cable RG - 6 7 Ohm + conduit untuk camera 4 LT. DUA Kabel Power NYM 3x1.5mm + conduit untuk camera
1 1
unit unit
87,550,000 14,875,000
87,550,000 14,875,000
1
unit
6,375,000.00
6,375,000
1 1
lot lot
1,487,500 3,612,375
1,487,500 3,612,375
5
Unit
4,462,500
22,312,500
5
Unit
4,462,500
22,312,500
3 3
Unit Unit
7,225,000 4,462,500
21,675,000 13,387,500
3
Unit
4,462,500
13,387,500
5
Unit
4,462,500
22,312,500
3
Unit
4,462,500
13,387,500
3
Unit
4,462,500
13,387,500
100 91
m m
21,038 17,531
2,103,800 1,595,321
100 127
m m
21,038 17,531
2,103,800 2,229,943
100 225
m m
21,038 17,531
2,103,800 3,944,475
100
m
21,038
2,103,800
No
5
6
7
Uraian Coaxial Cable RG - 6 7 Ohm + conduit untuk camera LT. TIGA Kabel Power NYM 3x1.5mm + conduit untuk camera Coaxial Cable RG - 6 7 Ohm + conduit untuk camera LT. EMPAT Kabel Power NYM 3x1.5mm + conduit untuk camera Coaxial Cable RG - 6 7 Ohm + conduit untuk camera LT. LIMA Kabel Power NYM 3x1.5mm + conduit untuk camera Coaxial Cable RG - 6 7 Ohm + conduit untuk camera
TOTAL
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
95
m
17,531
1,665,445
105 167
m m
21,038 17,531
2,208,990 2,927,677
119 119
m m
21,038 17,531
2,503,522 2,086,189
120 133
m m
21,038 17,531
2,524,560 2,331,623
288,495,320
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM MATV No
Uraian
A.
PERALATAN UTAMA
1 2
Pengadaan dan pemasangan head end amplifier Pengadaan dan pemasangan antene YAGI -UHF untuk program lokal Pengadaan dan pemasangan antene YAGI -VHF untuk program lokal Instalasi peralatan utama Pengadaan dan pemasangan line amplifier Pengadaan dan pemasangan Box panel TB - TV Pengadaan dan pemasangan TV Monitor 14", digital merk Toshiba, Sony Kabel dari antena UHF dan VHF ke ruang kontrol lt 2
3 4 5 6 7 8
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
1
unit
4,560,000
4,560,000
21
unit
600,000
12,600,000
1 1 2 6
unit lot unit buah
480,000 5,400,000 7,200,000 960,000
480,000 5,400,000 14,400,000 5,760,000
1 40
unit meter
1,500,000 30,000
1,500,000 1,200,000
Sub Total I B.
45,900,000
PEKERJAAN INSTALASI Pekerjaan ini termasuk pemasangan kabel coaxial didalam pipa conduit dengan diameter 20 mm, high impact lengkap dengan accesoriesnya.
B.1. Lantai Basement 1 Pengadaan dan pemasangan kabel coaxial type 7-C atau RG -11, merk Juri, Belden, Hansen 2 Pengadaan dan pemasangan kabel coaxial type 5-C atau RG -9, merk Juri, Belden, Hansen 3 Pengadaan dan pemasangan outlet TV, termasuk T-Dos merk MK, Clipsal B.2. Lantai Satu 1 Pengadaan dan pemasangan kabel coaxial type 7-C atau RG -11, merk Juri, Belden, Hansen 2 Pengadaan dan pemasangan kabel coaxial type 5-C atau RG -9, merk Juri, Belden, Hansen 3 Pengadaan dan pemasangan splitter 4 way 4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos merk MK, Clipsal 5 Pengadaan dan pemasangan kabel RCA merk Juri, Belden, Hansen 6 Pengadaan dan pemasangan outlet RCA, termasuk T-Dos merk MK, Clipsal B.3. Lantai Dua 1 Pengadaan dan pemasangan kabel coaxial type 7-C atau RG -11, merk Juri, Belden, Hansen 2 Pengadaan dan pemasangan kabel coaxial type 5-C atau RG -9, merk Juri, Belden, Hansen 3 Pengadaan dan pemasangan splitter 4 way 4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos merk MK, Clipsal B.4. Lantai Tiga 1 Pengadaan dan pemasangan kabel coaxial type 7-C atau RG -11, merk Juri, Belden, Hansen 2 Pengadaan dan pemasangan kabel coaxial type 5-C
55
meter
30,000
1,650,000
63
meter
18,000
1,134,000
1
buah
126,000
126,000
65
meter
30,000
1,950,000
240 5
meter buah
18,000 228,000
4,320,000 1,140,000
14 16
buah meter
126,000 30,000
1,764,000 480,000
2
buah
126,000
252,000
75
meter
30,000
2,250,000
160 6
meter buah
18,000 228,000
2,880,000 1,368,000
13
buah
126,000
1,638,000
95
meter
30,000
2,850,000
No
3 4
Uraian atau RG -9, merk Juri, Belden, Hansen Pengadaan dan pemasangan splitter 4 way Pengadaan dan pemasangan outlet TV, termasuk T-Dos merk MK, Clipsal
B.5. Lantai Empat 1 Pengadaan dan pemasangan kabel coaxial type 7-C atau RG -11, merk Juri, Belden, Hansen 2 Pengadaan dan pemasangan kabel coaxial type 5-C atau RG -9, merk Juri, Belden, Hansen 3 Pengadaan dan pemasangan splitter 4 way 4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos merk MK, Clipsal B.6. Lantai Lima 1 Pengadaan dan pemasangan kabel coaxial type 7-C atau RG -11, merk Juri, Belden, Hansen 2 Pengadaan dan pemasangan kabel coaxial type 5-C atau RG -9, merk Juri, Belden, Hansen 3 Pengadaan dan pemasangan splitter 4 way 4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos merk MK, Clipsal B.7 Testing & Comissioning Sub Total II Total I-II
Qty
Sat
H.Sat
Total
102 2
meter buah
(Rp) 18,000 1,428,000
(Rp) 1,836,000 2,856,000
6
buah
126,000
756,000
95
meter
30,000
2,850,000
368 7
meter buah
18,000 228,000
6,624,000 1,596,000
26
buah
126,000
3,276,000
105
meter
30,000
3,150,000
437 11
meter buah
18,000 228,000
7,866,000 2,508,000
31
buah
126,000
3,906,000
1
lot
6,000,000
6,000,000 67,026,000 112,926,000
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM FIRE ALARM No
Uraian
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
A.
PERALATAN UTAMA
1.
Pengadaan dan Pemasangan Master Control fire alarm (MCFA) type conventional dengan kapasitas 16 zone komplit dengan batteray ditem patkan pada ruang Kontrol
1
unit
#########
81,000,000
2
Pengadaan dan Pemasangan MDF
1
unit
2,160,000
2,160,000
3
Pengadaan dan pemasangan kabel distribusi dari MDF ke MCFA, Annunciator dan TB - FA perlantai terpasang pada kabel tray dengan lebar 40 cm
1
lot
#########
15,552,000
4
Pengadaan panel Terminal box (TB - FA)
6
unit
1,620,000
9,720,000
5.
Pengadaan dan pemasangan Annunciator yang ditempatkan pada ruang keamanan
1
unit
#########
43,200,000
Sub Total I B.
##########
PEKERJAAN INSTALASI Pemasangan isntalasi detektor, menggunakan ka bel NYA diameter 1 x 1,5mm2 didalam conduit high impact diameter 20 mm2 lengkap dengan acceso riesnya.
B.1
1
B.2
1 2 3 4 5 B.3
1 2 3 4 5 6 B.4.
1 2
Interface Pengadaan dan Pemasangan Instalasi Interface ke : Sound System, Dial DPK, Flow Switch, Tampre Switch, Panel AC, Panel Penerangan, Panel Lift, Presh Air fan, MATV, Hydrant/ Sprinkler dll. Lantai Basement ( B ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan heat detektor Instalasi detektor Pengadaan dan Pemasangan alarm bell, lampu indicator, break glass, jack telepon dan instalasinya Pengadaan dan pemasangan instalasi flow switch Lantai Satu ( 1 ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan Smoke detektor Pengadaan dan Pemasangan heat detektor Instalasi detektor Pengadaan dan Pemasangan alarm bell, lampu indicator, break glass, jack telepon dan instalasinya Pengadaan dan pemasangan instalasi flow switch Lantai Dua ( 2 ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan Smoke detektor
1
lot
5,175,000
5,175,000
87 10 97
buah buah titik
174,960 216,000 270,000
15,221,520 2,160,000 26,190,000
2 1
set titik
432,000 270,000
864,000 270,000
102 1 1 104
buah buah buah titik
216,000 378,000 216,000 270,000
22,032,000 378,000 216,000 28,080,000
2 1
set titik
480,000 270,000
960,000 270,000
61 4
buah buah
216,000 278,000
13,176,000 1,112,000
No
3 4 5 6 B.5.
1 2 3 4 5 6 B.6.
1 2 3 4 5 B.7.
1 2 3 4 5 6 B.8
1 2 3 4 B.9.
Uraian Pengadaan dan Pemasangan heat detektor Instalasi detektor Pengadaan dan Pemasangan alarm bell, lampu indicator, break glass, jack telepon dan instalasinya Pengadaan dan pemasangan instalasi flow switch
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
4 69
buah titik
216,000 270,000
864,000 18,630,000
2 1
set titik
432,000 270,000
864,000 270,000
69 3 2 74
buah buah buah titik
216,000 378,000 216,000 27,000
14,904,000 1,134,000 432,000 1,998,000
2 1
set titik
432,000 270,000
864,000 270,000
52 5 57
buah buah titik
216,000 240,000 270,000
11,232,000 1,200,000 15,390,000
2 1
set titik
432,000 270,000
864,000 270,000
50 1 3 54
buah buah buah titik
216,000 378,000 216,000 270,000
10,800,000 378,000 648,000 14,580,000
2 1
set titik
432,000 270,000
864,000 270,000
Lantai Atap ( A ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan Smoke detektor Pengadaan dan Pemasangan heat detektor Instalasi detektor
3 1 1 5
buah buah buah titik
216,000 378,000 216,000 270,000
648,000 378,000 216,000 1,350,000
Testing & Commissioning
1
lot
5,400,000
5,400,000
Lantai Tiga ( 3 ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan Smoke detektor Pengadaan dan Pemasangan heat detektor Instalasi detektor Pengadaan dan Pemasangan alarm bell, lampu indicator, break glass, jack telepon dan instalasinya Pengadaan dan pemasangan instalasi flow switch Lantai Empat ( 4 ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan heat detektor Instalasi detektor Pengadaan dan Pemasangan alarm bell, lampu indicator, break glass, jack telepon dan instalasinya Pengadaan dan pemasangan instalasi flow switch Lantai Lima ( 5 ) Pengadaan dan Pemasangan Rate OF Rise (ROR) Pengadaan dan Pemasangan Smoke detektor Pengadaan dan Pemasangan heat detektor Instalasi detektor Pengadaan dan Pemasangan alarm bell, lampu indicator, break glass, jack telepon dan instalasinya Pengadaan dan pemasangan instalasi flow switch
Sub Total II
##########
Total I-II
##########
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM NURSE CALL No
A.
Uraian
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
PERALATAN UTAMA CENTRAL PROCESSOR UNIT Pengadaan dan Pemasangan peralatan utama nurse call dan Accesoriesnya sehingga dapat berpungsi dengan baik.
1
2
3.
B.
AE4000 System Suport Hardware with interface to Dim; stor up 250 vigil rooms AE402
157/1
1
unit
40,837,600
40,837,600
Batery Back up for IP8000 to operate file boat Mode when mains power is off ( typical 4 hour )
1
buah
7,150,000
7,150,000
Pengadaan dan pemasangan 1 gang (94x54x43mm) Australian Std Range, flush mounting box (inbow)
1
lot
3,600,000
3,600,000
13
buah
1,210,000
15,730,000
13 3
buah buah
715,000 935,000
9,295,000 2,805,000
3
buah
1,430,000
4,290,000
3
buah
121,000
363,000
3
buah
4,537,600
13,612,800
1
Unit
12,375,000
12,375,000
PEKERJAAN INSTALASI Pengadaan dan pemasangan Nurse call push button, lampu indicator, Pull cord, Reset push button.Mikropho ne, dan instalasi pengkabelannya di dalam conduit PVC high impact diameter 20 mm2 lengkap dengan acceso riesnya sehingga dapat berfungsi dengan baik.
B.1 Lantai Basement ( B ) 1 Ruang Kebidanan @ 3 Tempat tidur 1 kamar mandi 1 Ruang Anak @ 3 Tempat tidur 1 kamar mandi 1 Ruang Dewasa @ 7 Tempat tidur 1 kamar mandi 1 ACQ 121 Call cancel station with Assurance LED (with pendan socket) Vertical Mounting 2 AP3301 3 Metre Single button PendanT Cord for ACQ Series Call Station 3 ALL402 Over door light with green and yelow globe 4 ASQ01P Ceilling pull switch slave wet area station with LED assurance light (with 3 metre heavy duty detachable pull cord and anchors) 5 ACQ023 Presence/Cancel station with assurance LED (No Pendant Socket/Splashproof) vertical mounting 6 ANQ401 Data interface Moduler - 16 inputs RJ Connected (Configurable) 7 ADIC13 12 Character 50 mm single sided 3 Colour Full Alpha Annunciator with ding sound Central and Multiple Address Capability Total I B.2 Lantai 3 ( Tiga ) 2 Ruang VIP @ 1 Tempat tidur 1 kamar mandi 2 Ruang Kls I @ 2 Tempat tidur 1 kamar mandi 4 Ruang Kls II @ 3 Tempat tidur 1 kamar mandi 1 Ruang Kls III @ 7 Tempat tidur 1 kamar mandi 1 Ruang ICU, @ 5 Tempat Tidur. 1 Ruang High Care, @ 4 Tempat Tidur 1 Ruang VK, @ 4 Tempat Tidur 2 Kamar Mandi 1 Ruang VK, @ 1 Tempat Tidur 1 Kamar Mandi 1 ACQ 121 Call cancel station with Assurance LED (with pendan socket) Vertical Mounting
58,470,800
39
buah
1,210,000
47,190,000
No 2
Uraian AP3301 3 Metre Single button PendanT Cord for ACQ
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
No
3 4
5
6 7
Uraian Series Call Station ALL402 Over door light with green and yelow globe ASQ01P Ceilling pull switch slave wet area station with LED assurance light (with 3 metre heavy duty detachable pull cord and anchors) ACQ023 Presence/Cancel station with assurance LED (No Pendant Socket/Splashproof) vertical mounting ANQ401 Data interface Moduler - 16 inputs RJ Connected (Configurable) ADIC13 12 Character 50 mm single sided 3 Colour Full Alpha Annunciator with ding sound Central and Multiple Address Capability
B.3 Lantai 4 ( Empat ) 3 Ruang Kls III @ 13 Tempat tidur 2 kamar mandi 21 Ruang Kls I I @ 6 Tempat tidur 2 kamar mandi 2 Ruang observasi @ 4 Tempat tidur @ 2 kamar mandi 1 ACQ 121 Call cancel station with Assurance LED (with pendan socket)Vertical Mounting 2 AP3301 3 Metre Single button PendanT Cord for ACQ Series Call Station 3 ALL402 Over door light with green and yelow globe 4 ASQ01P Ceilling pull switch slave wet area station with LED assurance light (with 3 metre heavy duty detachable pull cord and anchors) 5 ACQ023 Presence/Cancel station with assurance LED (No Pendant Socket/Splashproof) vertical mounting 6 ANQ401 Data interface Moduler - 16 inputs RJ Connected (Configurable) 7 ADIC13 12 Character 50 mm single sided 3 Colour Full Alpha Annunciator with ding sound Central and Multiple Address Capability B.4 Lantai 5 ( Lima ) 19 Ruang VIP @ 1 Tempat tidur @ 1 kamar mandi 11 Ruang Kls I @ 2 Tempat tidur @ 1 kamar mandi 1 ACQ 121 Call cancel station with Assurance LED (withpendan socket) Vertical Mounting 2 AP3301 3 Metre Single button PendanT Cord for ACQ Series Call Station 3 ALL402 Over door light with green and yelow globe 4 ASQ01P Ceilling pull switch slave wet area station with LED assurance light (with 3 metre heavy duty detachable pull cord and anchors) 5 ACQ023 Presence/Cancel station with assurance LED (No Pendant Socket/Splashproof) vertical mounting 6 ANQ401 Data interface Moduler - 16 inputs RJ Connected (Configurable) 7 ADIC13 12 Character 50 mm single sided 3 Colour Full Alpha Annunciator with ding sound Central and Multiple Address Capability
Qty
Sat
H.Sat
Total
39 17
buah buah
(Rp) 715,000 935,000
(Rp) 27,885,000 15,895,000
17
buah
1,430,000
24,310,000
17
buah
121,000
2,057,000
2
buah
4,537,600
9,075,200
1
Unit
12,375,000
12,375,000
88
buah
1,210,000
106,480,000
88 26
buah buah
715,000 935,000
62,920,000 24,310,000
26
buah
1,430,000
37,180,000
26
buah
121,000
3,146,000
8
buah
4,537,600
36,300,800
1
Unit
12,375,000
12,375,000
41
buah
1,210,000
49,610,000
41 30
buah buah
715,000 935,000
29,315,000 28,050,000
30
buah
1,430,000
42,900,000
30
buah
121,000
3,630,000
6
buah
4,537,600
27,225,600
1
Unit
12,375,000
12,375,000
No
Uraian
Qty
Sat
H.Sat
Total
(Rp)
(Rp)
B5 Instalasi Nurse Call
1
lot
103,175,000
103,175,000
B.6 Testing & Commissioning
1
lot
10,000,000
10,000,000
C
1 a.
b. c
2 a.
b.
c
3 a.
b. c
4 a.
b.
c
5 a.
Total II
727,779,600
Total I-II
786,250,400
KABEL TRAY ARUS LEMAH Pengadaan dan pemasangan Rak Kabel lengkap dengan Jointing, Suport, Hanger rood, dan Accesoriesnya sehingga dapat berpungsi dengan baik. LANTAI BASEMENT Straight W = 300 W = 200 Elbow 300 x 300 Tee 300 x 300 x 300 300 x 200 x 200 LANTAI 1 Straight W = 400 W = 300 W = 200 Elbow 300 x 300 200 x 200 Tee 400 x 300 x 200 300 x 200 x 200 LANTAI 2 Straight W = 400 W = 300 W = 200 Elbow 400 x 400 Tee 400 x 400 x 300 300 x 400 x 200 300 x 200 x 200 LANTAI 3 Straight W = 300 W = 200 Elbow 300 x 300 200 x 200 Tee 300 x 200 x 200
LANTAI 4 Straight
3 Unit
80,700,000
242,100,000
72 48
m m
330,625 247,500
23,805,000 11,880,000
1
bh
431,250
431,250
1 1
bh bh
583,125 583,125
583,125 583,125
4 16 96
m m m
413,125 330,625 247,500
1,652,500 5,290,000 23,760,000
1 2
bh bh
431,250 303,750
431,250 607,500
1 1
bh bh
731,250 583,125
731,250 583,125
20 2 72
m m m
413,125 330,625 247,500
8,262,500 661,250 17,820,000
1
bh
555,000
555,000
1 1 1
bh bh bh
731,250 731,250 583,125
731,250 731,250 583,125
16 75
m m
330,625 247,500
5,290,000 18,562,500
1 2
bh bh
431,250 303,750
431,250 607,500
1
bh
583,125
583,125
No
b. c
6 a.
b. c
d
e
Uraian W = 300 W = 200 Elbow 300 x 300 Tee 300 x 200 x 200 LANTAI 5 Straight W = 300 W = 200 Elbow 300 x 300 Tee 300 x 200 x 200 Cable Tray Vertikal Straight w = 600 Material Bantu
Qty
Sat
H.Sat
Total
22 72
m m
(Rp) 330,625 247,500
(Rp) 7,273,750 17,820,000
1
bh
431,250
431,250
1
bh
583,125
583,125
22 72
m m
330,625 247,500
7,273,750 17,820,000
1
bh
431,250
431,250
1
bh
583,125
583,125
30
m
578,125
17,343,750
1
lot
10,000,000
10,000,000
SUB TOTAL VI
446,816,875
TOTAL I s.d VI
1,651,986,275
No
Uraian
Qty
Sat
H.Sat
Total
(Rp)
(Rp)