GU-379 Pipeline Emergency Repair Manual
Authorised For Issue --/--/----
Signed:........................................................................................
M. Zadjali, UIP CFDH Pipelines
The following following is a brief s!!ar" s!!ar" of #he $ !os# re%en# re%en# re&isions #o #his do%!en#. do%!en#. De#ails De#ails of all re&isions re&isions prior #o #hese are are held on file b" #he issing depar#!en#. depar#!en#.
'ersion (o. +e&. -. +e&. 5./
Da#e (o& /)pril /2 Feb. /2
)#hor U01*2 + Harris 6IP*52 U01*2
S%ope* +e!ars 3+P pipeline se%#ion added. Do%!en# re4for!a##ed. 0le%#roni% %op" of 0!ergen%" Ma#erials 1is# 7)ppendi8 259 added. Designed as CD 3ideline. Minor #e8#al %hanges #o adap# #o 3U4 for!a# and referen%e pda#ed. Te%hni%al Te%hni%al %on#en# no# re&iewed.
+e&. 5.2
+e&. 5
;ne 2<<<
6IP*-
Upda#ed #o refle%# %hanges in responsibili#ies de #o asse# based organisa#ion and refor!a##ed #o new #e!pla#e.
+e&. /
Mar 2<<$
)0F*=52
Page / of >=
GU-379 Pipeline Emergency Repair Manual
Authorised For Issue --/--/----
Signed:........................................................................................
M. Zadjali, UIP CFDH Pipelines
The following following is a brief s!!ar" s!!ar" of #he $ !os# re%en# re%en# re&isions #o #his do%!en#. do%!en#. De#ails De#ails of all re&isions re&isions prior #o #hese are are held on file b" #he issing depar#!en#. depar#!en#.
'ersion (o. +e&. -. +e&. 5./
Da#e (o& /)pril /2 Feb. /2
)#hor U01*2 + Harris 6IP*52 U01*2
S%ope* +e!ars 3+P pipeline se%#ion added. Do%!en# re4for!a##ed. 0le%#roni% %op" of 0!ergen%" Ma#erials 1is# 7)ppendi8 259 added. Designed as CD 3ideline. Minor #e8#al %hanges #o adap# #o 3U4 for!a# and referen%e pda#ed. Te%hni%al Te%hni%al %on#en# no# re&iewed.
+e&. 5.2
+e&. 5
;ne 2<<<
6IP*-
Upda#ed #o refle%# %hanges in responsibili#ies de #o asse# based organisa#ion and refor!a##ed #o new #e!pla#e.
+e&. /
Mar 2<<$
)0F*=52
Page / of >=
GU-379 Pipeline Emergency Repair Manual
Table Of Content Authorised For Issue --------!!!!!!!!!!!!!!!!!!!!!!! --------!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!" !!!!!!!!!!!!!!!!!!!!" #!$ Introd Introducti uction!!! on!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!!! !!!!!! !!! 2.2 6bje%#i&e.. 6bje%#i&e....... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............... ................... ...........$ ..$ 2./ S%ope.... S%ope......... .......... .......... .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............. ................$ ........$ 2.5 )ppli%able )ppli%able S#andards.. S#andards....... .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... .............. .................. ...................= ..........= 2.Defini#ion Defini#ionss and )bbre&ia# )bbre&ia#ions.. ions....... .......... .......... ......... ......... .......... .......... .......... .......... ........... ................ ................... ..................= .........= 2.$ Dis#rib#io Dis#rib#ion*T n*Tar arge# ge# )dien%e.. )dien%e....... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............. ................. ............> ...> 2.= Do%!en# Do%!en# S#r%#re... S#r%#re........ .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... ............ ................ ................... .............> ...> 2.> +e&iew +e&iew ? I!pro&e!e I!pro&e!en#.... n#......... .......... .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... .......... .............. ............@ ...@ "!$ Emergenc Emergency y Repairs Repairs %or &ar'on &ar'on (tee (teell Pipelines! Pipelines!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!!!! !!!!!!!!!!!!!!!! !!!!!!!!!!!!! !!!! !!! /.2 S%ope.... S%ope......... .......... .......... .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............. ................< ........< /./ T"pes T"pes of defe%#s defe%#s and and i#s %ases...... %ases........... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .........< ....< /.5 Cases of 0!ergen%" 0!ergen%" Defe%#s..... Defe%#s.......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............. .........2 .2 /.T"pes T"pes of 1e&el I 0!ergen%" 0!ergen%" Defe%#s..... Defe%#s.......... .......... ......... ......... .......... .......... .......... .......... .......... .............. .................. ..........2 .2 /.$ 1e&el4I 1e&el4I 0!ergen%" 0!ergen%" Defe%#s..... Defe%#s.......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ......... ......... .............. .........22 22 /.= Co!pos Co!posi#e i#e +epair: +epair: )n )l#ern )l#erna#i a#i&e &e +epair Me#hod. Me#hod.... ...... ...... ...... ...... ...... ...... ...... ...... ....... ........ ........ ........ ......./< .../< /.> 1e&el 1e&el II 0!erg 0!ergen%" en%" Defe% Defe%#s4 #s4 Injri Injrios os non non leaing leaing defe%# defe%#s... s...... ...... ...... ...... ...... ...... ...... ...... ....... ......5 ..5 /.@ +epair +epair organisa# organisa#ion... ion........ .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .............. ................... ..................5 ........5 3!$ Emerge Emergency ncy Repair Repairss %or %or G Glas lasss Rein%o Rein%orc rced ed Plast Plastic ic )GRP* )GRP* Pipeli Pipeline nes!!! s!!!!!! !!!!!! !!!!!! !!!!!!! !!!!!!!! !!!!!!!! !!!!!! 5.2 3eneral.... 3eneral......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............ ................. .............52 ...52 5./ S%ope.... S%ope......... .......... .......... .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............... ..............52 ....52 5.5 Cases Cases of defe% defe%#s #s in an oper opera#i a#ing ng 3+P 3+P pipel pipeline ine s"s#e!. s"s#e!.... ...... ...... ...... ...... ...... ...... ....... ........ ........ ........ .....52 .52 5.Defe%#s Defe%#s de #o o&er pressrisa#io pressrisa#ion.... n......... .......... .......... .......... .......... .......... .......... ......... ......... ............... ................... ..............52 .....52 5.$ Defe%# %a#egorisa#io %a#egorisa#ion.... n......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .........52 ....52 5.= +epair +epair of 1e&el4I 0!ergen%" 0!ergen%" Defe%#s.... Defe%#s......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ........... ........5/ ..5/ 5.> 0!ergen%" 0!ergen%" +epair +epair Pro%edre Pro%edre Aalifi%a#io Aalifi%a#ion.... n......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .........5= ....5= 5.@ Aali#" Aali#" Progra!!e Progra!!e dring dring +epair..... +epair.......... .......... .......... .......... .......... .......... .......... .......... ......... ......... ........... ............... ............5= ...5= 5.< 0!ergen%" 0!ergen%" +epair +epair Bi#....... Bi#............ .......... .......... ......... ......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ...............5 ..........5= = +!$ Emerge Emergency ncy Repa Repair ir o% o% (u (u'se 'sea a &ar'on &ar'on (tee (teell Pipeli Pipeline nes!!! s!!!!!! !!!!!! !!!!!! !!!!!! !!!!!!! !!!!!!!! !!!!!!!! !!!!!!!! !!!!!!!! !!!!!!!! !!!!!!!! !!!!!! !!!! -.2 3eneral.... 3eneral......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............ ................. .............5@ ...5@ -./ S%ope.... S%ope......... .......... .......... .......... .......... .......... .......... .......... ......... ......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............... ..............5@ ....5@ -.5 Cases of Defe%#s..... Defe%#s.......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............. .............5< .....5< -.1e&el I 0!ergen%" 0!ergen%" Defe%#s...... Defe%#s........... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .............. .............5< ....5< -.$ +esor%es.. +esor%es....... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ......... ......... ............... ................... ..............-2 .....-2 ,!$ Emergenc Emergency y (toc (toc Materials Materials!!!! !!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!!! !!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!! !!!!!!!! ! $.2 Philosoph" Philosoph"..... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ............. .........-/ .-/ $./ 1oa%#i 1oa%#ion on and Aan#i Aan#i#ies #ies of 0!erg 0!ergen%" en%" S#o% S#o% Ma#eria Ma#erials.. ls..... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ....... ....-/ -/ .!$ (a%ety!! (a%ety!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!! !!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!!!!!! !!!!!!!!! ! =.2 Safe#" Safe#" reir reire!e e!en#s n#s dring dring repai repairr of e!ergen%" e!ergen%" defe%# defe%#s.. s..... ...... ...... ...... ...... ...... ...... ...... ...... ...... ....... ......-5 ..-5 =./ )%%iden#al )%%iden#al releases..... releases.......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... .......... ......... ......... ........... ............-......-7!$
Re%eren Re%erences ces!!!!! !!!!!!!!!! !!!!!!!!! !!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!! !!!!!!!!!!!!!! !!!!!!!!!!!!! !!!! !
Page 5 of >=
GU-379 Pipeline Emergency Repair Manual
)ppendi842 )ppendi84/ )ppendi845 )ppendi84)ppendi8 $ )ppendi8 = )ppendi84> )ppendi84@ )ppendi84< )ppendi842
Page - of >=
Me%hani%al !e#hods #o be sed in ins#alla#ion of slee&es Plid%o Spli# E Slee&e Plid%o S!i#h E Cla!p Plid%o eld E Cap Fi8ing arrange!en#s for Plid%o eld E 0nd Plid%o Flange E +epair +ing Plid%o Flange +epair E Spli# Slee&e 1is# of 0!ergen%" Ma#erial Manfa%#rer Ins#r%#ions User Co!!en# For!
GU-379 Pipeline Emergency Repair Manual
1.0 Introduction #!#
/'0ecti1e
The obje%#i&e of #his !anal is #o pro&ide a s#r%#red approa%h for e!ergen%" repairs #o Carbon s#eel pipelines, 3+P off4plo# pipelines and sbsea pipelines. The !ain prpose of an e!ergen%" repair is #o res#ore #he s#r%#ral in#egri#" of #he pipeline in #he !os# effi%ien# !anner, #o a&oid fr#her da!age #o heal#h, safe#" and #he en&iron!en# and #o res!e #he opera#ion wi#ho# an" fr#her loss in prod%#ion. In #his regard e8pedien%" is a !ore i!por#an# fa%#or #han a%hie&ing #he %heapes# %api#al %os# of #he repair i#self, par#i%larl" as #he #i!e sa&ed de #o fas# repair will lead #o lower losses in prod%#ion #hroghp# of #he pipeline. )n e!ergen%" repair differs fro! a planned repair in #ha# #he #i!e a&ailable for assess!en# of #he bes# %orse of a%#ion, !a#erial sppl" and e8e%#ion #i!e are li!i#ed b" #he need for res!p#ion of prod%#ion. The !ain prpose of #he !anal is #o define #he gidelines and reire!en#s for e!ergen%" repairs in order #o red%e #he e8e%#ion #i!e in #he assess!en# of #he e!ergen%" s%enario and de%iding #he bes# %orse of a%#ion. The !anal gi&es pra%#i%al repair and !ain#enan%e sol#ions #o &arios po#en#ial e!ergen%" si#a#ions. The !anal pro&ides #he ser wi#h infor!a#ion #o sele%# and e8e%#e a si#able repair !e#hod for a gi&en pipeline da!age s%enario. I# is no# possible #o foresee e&er" %ondi#ion #ha# !a" arise in #he e&en# of a pipeline reiring repairs and, #herefore, #he e8a%# %orse of a%#ion #o be #aen !s# be de%ided pon b" #he engineer in %harge of #he repair. In #he e&en# of an e!ergen%" si#a#ion, referen%e shall be !ade #o #he PD6 0!ergen%" Pro%edres. These pro%edres pro&ide infor!a#ion essen#ial #o #he 0!ergen%" Con#roller when !aing de%isions and for!la#ing an a%#ion plan #o %on#rol and re%#if" a wide range of e!ergen%" si#a#ions. #!"
(cope
This do%!en# %o&ers #he e!ergen%" repairs of off4plo# pipelines. The re%o!!enda#ions %o&ered per#ain #o bo#h abo&egrond and ndergrond Carbon s#eel and 3+P pipelines. +epair of sbsea %arbon s#eel pipelines is briefl" %o&ered in #his do%!en#. The repair !e#hods spe%ified in #his !anal %an be sed for repair of all %lasses of pipelines as defined in se%#ion 5./.$ of SP42/22. Howe&er, #he e!ergen%" !a#erial is s#o%ed for %lass4I pipelines onl". This do%!en# %o&ers e!ergen%" s%enarios for #he off4plo# por#ion of a pipeline o#side #he plan# bondar". 6n plo# e!ergen%" repairs in%lding #hose rela#ed #o s%raper #raps, b"pass lines and o#her rela#ed on plo# fa%ili#ies are e8%lded. These la##er repairs shall for! par# of #he plan# repair*sh#down !anal. The do%!en# %o&ers e!ergen%" repairs for in#ernall" and e8#ernall" %oa#ed*lined pipelines b# repairs #o %a#hodi% pro#e%#ion s"s#e!s are e8%lded.
Page $ of >=
GU-379 Pipeline Emergency Repair Manual
6nl" leaage e!ergen%" s%enarios are %o&ered in #his !anal. For non4leaing injrios defe%#s, referen%e is !ade #o reisi#e D0P*PD6 s#andards. The s%ope of #he !anal is #aen fro! #he poin# where #he lea has been iden#ified and lo%a#ed. I# also briefl" %o&ers #he aspe%# of de#e%#ion or iden#ifi%a#ion of #he defe%#s b" referen%e #o #he rele&an# D0P * S#andards. #!3
Applica'le (tandards
The lis# of appli%able s#andards, spe%ifi%a#ions, %odes, gidelines and pro%edres are indi%a#ed in se%#ion =. of #his do%!en#. #!+ #!+!#
2e%initions and A''re1iations General 2e%initions &ontractor 4 The par#" #ha# has a %on#ra%# wi#h #he Co!pan" for pro&iding wor
7in%lding e!ergen%" repairs9, eip!en#, !a#erial, ser&i%es 7in%lding %onsl#ing ser&i%es9 and !anpower. GCon#ra%#or shall be read #o also in%lde Gsb4%on#ra%#or and par#ies pro&iding sppor# #o %on#ra%#ors and sb4%on#ra%#ors. The %o!pan" !a" nder#ae all or par# of #he d#ies of #he %on#ra%#or. &ompany - is Pe#role! De&elop!en# of 6!an 11C. The %o!pan" !a" in%lde an
agen# or %onsl#an# a#horised #o a%# on behalf of #he %o!pan". (hall 4 indi%a#es a reire!en#. (hould - indi%a#es a re%o!!enda#ion.
May - indi%a#es a possible %orse of a%#ion. #!+!"
(peci%ic 2e%initions 2e%ect : 4 a flaw whi%h !a" ha&e a dele#erios effe%# on #he s#r%#ral in#egri#" of #he pipeline. Emergency : 4 a %ri#i%al %ondi#ion #ha# !a" endanger life, en&iron!en# and*or asse#s. In0urious de%ect : 4 a defe%# whi%h reires re!o&al, repair or dera#ing of #he pipeline. Permanent repair: 4 a repair #ha# !aes a pipeline safe for %on#inos ser&i%e for #he re!aining period of i#s design life a# i#s !a8i!! allowable opera#ing pressre or a# a red%ed pressre. emporary repair: 4 a repair #ha# !aes a pipeline safe for ser&i%e for a li!i#ed period of !ini!! 5 !on#hs. 4eaing cracs: 4 S#ress ind%ed separa#ion of #he pipe !a#erial, whi%h, wi#ho# an" o#her inflen%e, is insffi%ien# in e8#en# #o %ase %o!ple#e rp#re. The %ra%s sall" o%%r de #o e8%essi&e s#raining dring #he ini#ial !e%hani%al for!a#ion of #he pipe or as a resl# of !i%ro4s#r%#ral sensi#i&i#" #o %er#ain en&iron!en#s, whi%h are of#en high in h"drogen or slphr %on#en#, in %o!bina#ion wi#h #ensile s#resses. Cra%s !a" be fond in #he gir#h welds, sea! welds or in #he pipe bod".
Page = of >=
GU-379 Pipeline Emergency Repair Manual
Prompt action: Consis#s of dispa#%hing alified personnel wi#ho# dela" for e&ala#ing and, where ne%essar", aba#ing #he e8is#ing or probable haard. #!+!3
#!,
A''re1iations
)PI
)!eri%an Pe#role! Ins#i##e.
)(SI
)!eri%an (a#ional S#andards Ins#i##e
)SM0
)!eri%an So%ie#" of Me%hani%al 0ngineers
D0P
Design and 0ngineering Pra%#i%e 7SH011 do%!en#s9
HIC
H"drogen Ind%ed Cra%ing
MPI
Magne#i% Par#i%le Inspe%#ion
(PS
(o!inal Pipe Sie
SCC
S#ress Corrosion Cra%ing
UT
Ul#rasoni% Tes#ing
2istri'utionarget Audience
The do%!en# is in#ended for se b" PD6 and all o#her par#ies in&ol&ed in #he pipeline !ain#enan%e and e!ergen%" repairs as a basi% gideline for #he e!ergen%" repair of pipelines. T"pi%al par#ies in%lde opera#ors, design %onsl#an#s, %ons#r%#ion %on#ra%#ors, inspe%#ion, repair and !ain#enan%e %on#ra%#ors, %er#if"ing agen%ies and a#hori#ies. #!.
2ocument (tructure
The do%!en# %o!prises of #he following se%#ions: 2.
In#rod%#ion
/.
0!ergen%" repairs for Carbon s#eel pipelines
5.
0!ergen%" repairs for 3+P pipelines
-.
0!ergen%" repairs for Sbsea CS pipelines
$.
Safe#"
=.
+eferen%es
The se%#ions will be fr#her sb4di&ided #o %o&er #he rele&an# #e%hni%al * safe#" %onsidera#ions, pro%edres and planning reired #o !ee# #he obje%#i&es of #he !anal. +eferen%es a# #he ba% of #he !anal will in%lde rele&an# referen%e !a#erial. The do%!en# is in#ended for se b" PD6 and all o#her par#ies in&ol&ed in #he pipeline !ain#enan%e and e!ergen%" repairs as a basi% gideline for #he e!ergen%" repair of pipelines. T"pi%al par#ies in%lde opera#ors, design %onsl#an#s, %ons#r%#ion %on#ra%#ors, inspe%#ion, repair and !ain#enan%e %on#ra%#ors, %er#if"ing agen%ies and a#hori#ies.
Page > of >=
GU-379 Pipeline Emergency Repair Manual
#!7
Re1ie5 6 Impro1ement
These 3idelines will be re&iewed and pda#ed on%e e&er" #hree "ears. The re&iew a#hori#" will be CFDH Pipelines. (o %hanges will be !ade wi#ho# #he appro&al of #he Cs#odian 7CFDH Pipelines9.
Page @ of >=
GU-379 Pipeline Emergency Repair Manual
2.0 Emergenc !e"airs for Carbon #teel $i"elines "!#
(cope
This par# of #he do%!en# defines e!ergen%" repair reire!en#s for %arbon s#eel pipelines. The pipelines %o&ered are for dia!e#ers ranging fro! -J #o -@J, wall #hi%ness ranging fro! -.@!! #o /.=!! and s#eel grades %onfor!ing #o )PI $1 p #o 3rade K4>. I# e8%ldes #he repair de#ails for o#her !e#alli% pipelines e.g. d%#ile iron, dple8 !a#erial e#%. The sbje%#s addressed in #his par# of #he do%!en# %on#ain infor!a#ion regarding assess!en# of an e!ergen%" defe%#, inspe%#ion, repair !e#hods and #he safe#" reire!en#s #o be followed dring repair. "!"
ypes o% de%ects and its causes
The possible repair !e#hods are, #o a large e8#en#, di%#a#ed b" #he #"pe of #he defe%#. The &arios #"pes of defe%#s in a pipeline s"s#e! %an be %lassified on #he basis of a&ailabili#" of #i!e reired for repair, #he resor%es reired #o deal wi#h #he repair and #he %onseen%es. These are %lassified in #he following #wo !ain #"pes: 4 Emergency de%ects :4 a defe%# in #he pipeline #ha# has a dele#erios effe%# on #he heal#h, safe#", en&iron!en# and*or prod%#ion. S%h defe%#s in a pipeline s"s#e! are #hose, whi%h reire i!!edia#e and pro!p# a%#ion and also need spe%ialised pro%edres, eip!en#, !anpower and spplies #o pro#e%# #he pbli% safe#" or proper#" fro! an e8is#ing or po#en#ial haard.
0!ergen%" defe%#s %an be fr#her %a#egorised 1e&el 2 and 1e&el /. Level I emergency defects: 4 )ll leaing defe%#s in Class I pipelines are %lassified as 1e&el I e!ergen%" defe%#s. These 1e&el I e!ergen%" defe%#s pose an i!!edia#e #hrea# #o #he heal#h, safe#", en&iron!en# and prod%#ion and #herefore needs #o be re%#ified on an i!!edia#e basis wi#h Gpro!p# a%#ion. The period be#ween repor#ing of a defe%# and #he repair shall be ep# as shor# as pra%#i%able. Level II emergency defects: 4 )ll non4leaing injrios defe%#s as defined in SP4 2/5$ in Class I pipelines are defined as 1e&el II e!ergen%" defe%#s. These defe%#s do no# pose an i!!edia#e #hrea# #o heal#h, safe#", en&iron!en# and prod%#ion. Howe&er, #he e8#en# of da!age #o #he pipeline s"s#e! is s%h #ha# #hese defe%#s %an a# an" #i!e be%o!e leaing defe%#s. Therefore #he #i!e a&ailable for %arr"ing o# repairs for s%h defe%#s is !ore #han #he #i!e a&ailable in 1e&el I e!ergen%" defe%#s, b# is less #han #he #i!e a&ailable for non4 e!ergen%" defe%#s. on-Emergency de%ects8 - a defe%# whi%h, in i#s presen# s#a#e, does no# ha&e an" i!!edia#e i!pa%# on #he heal#h, safe#", en&iron!en# and*or prod%#ion. Howe&er, s%h defe%#s %an if no# re%#ified, ha&e #he po#en#ial #o be%o!e e!ergen%" defe%#s and #hereof need planned repair. The #i!e a&ailable for %arr"ing o# repairs for s%h defe%#s is !ore #han #he #i!e a&ailable in %ases of e!ergen%" defe%#s. Therefore, no spe%ialised pro%edres and resor%es are reired.
Page < of >=
GU-379 Pipeline Emergency Repair Manual
S%h defe%#s %an be repaired in a planned !anner, b# !s# also be re%#ified in a #i!el" !anner #o ensre #ha# do no# be%o!e e!ergen%" defe%#s. $ i " e l in e ) e f e c t s
E m e r g e n c ) e fe c ts
% in o r & e a'
o n -E m e r g e n c ) e f e c ts
&e*el-I
&e*el-II
& e a ' i n g In ( u r io u s ) e f e c t s
o n & e a ' in g In ( u rio u s ) e fe c t s 0As "er #$-123
% a (o r & e a '
$ i " e % il l ) e f e c t s
+ ir t h , e l d ) e f e c t s
) e n ts
C r a c ' s /A r c u r n s
! u " tu re
# " a l l in g . + o u g e s . + r o o * e s
+ e n e r a l /& o c a l % e t a l & o s s
Fig. 2: S!!ar" of pipeline defe%#s
"!3
&auses o% Emergency 2e%ects
The o%%rren%e of e!ergen%" defe%#s in #he pipeline s"s#e! %an be a##rib#ed #o one or a %o!bina#ion of #he following %ases: 4 2. Third par#" in#erferen%e /. Manfa%#ring*%ons#r%#ion*design*!a#erial defe%#s 5. 08%essi&e opera#ional loads*errors -. 3eo4#e%hni%al for%es $. Corrosion*sensi#i&i#" #o en&iron!en# The !os# %o!!on reasons for pipeline failres are #hird par#" in#erferen%e or %orrosion. "!+
ypes o% 4e1el I Emergency 2e%ects
1e&el I e!ergen%" defe%#s %an be fr#her %a#egorised based on #he #"pe of leas in#o: 4 Minor 1ea
) lea 7also %alled a pinhole lea9, where #he larges# di!ension of #he leaing hole is L 5!!.
Major 1ea
) lea, where #he larges# di!ension of #he lea hole is 5!! b# less #han =N of #he o#er dia!e#er of #he line pipe
+p#re
Page 2 of >=
) rp#re is a defe%# where #he larges# di!ension of #he lea hole is =N of #he o#er dia!e#er of #he line pipe. In #hese %ases, #he pressre in #he pipeline s"s#e! is dras#i%all" red%ed and also, #he leaage ra#e fro! #he defe%# is high.
GU-379 Pipeline Emergency Repair Manual
In addi#ion #o #he abo&e, leas o%%rring fro! flanges* flanged fi##ings, &al&es e#%., shall also be %onsidered as 1e&el I e!ergen%" defe%#s. +epair !e#hods adop#ed for 1e&el I e!ergen%" defe%#s will depend on #he na#re of #he lea and lo%a#ion a# whi%h #he lea o%%rs. 1eas o%%rring in pipeline s"s#e!s in #he &i%ini#" of road and wadi %rossings shall reire differen# repair !e#hods #han #he leas repor#ed fro! o#her areas. "!,
4e1el-I Emergency 2e%ects
The e&en#s*a%#i&i#ies rela#ed #o 1e&el I e!ergen%" defe%#s %an be %a#egorised nder following for !ain headings: 4 2. De#e%#ion of defe%#*lea /. Perfor! da!age*lea assess!en# sr&e" 5. )nal"se da!age assess!en# sr&e" and de%ide pon repair op#ions -. Mobilise e!ergen%" repair eip!en#*%on#ra%#ors and %o!!en%e repair wors as per pro%edres o#lined in #his !anal. (o#e: This !anal pla%es grea#er e!phasis poin#s 5 ? - abo&e. Poin#s 2 ? / ha&e onl" been %o&ered in brief.
"!,!#
2etectionidenti%ication o% lea
Ti!el" de#e%#ion*iden#ifi%a#ion of leas is essen#ial #o pre&en# %a#as#rophi% effe%#s of #he lea. For de#ailed gidelines on #he lea de#e%#ion, referen%e shall be !ade #o D0P 52.-.=.22 and P+42== 7Clase /.5.< and /.5.29. Iden#ifi%a#ion of sspe%#ed leas, nless i# has been sigh#ed and repor#ed b" 5 rd par#"* PD6 sr&eillan%e #ea! or in #he absen%e of a si#able lea de#e%#ion #e%hnie, will in&ol&e pa#rolling 7waling, dri&ing or fl"ing9 #he pipeline #o iden#if" e&iden%e of one or !ore of #he following: 2. 'ege#a#ion dis#rban%es 4 &isal obser&a#ion #o de#e%# abnor!al or nsal indi%a#ions in &ege#a#ion, e.g. an area of dead &ege#a#ion or a bild p of fros# on #he grond /. 'isal iden#ifi%a#ion of flid spillage 5. ) lod whis#ling sond asso%ia#ed wi#h a lea in a high pressre pipeline s"s#e! -. S!ell of #he flid being #ranspor#ed in #he leaing pipeline $. Possible shor#ness of brea#h in #he area of a lea =. Fire near a pipeline fa%ili#" 6#her essen#ial warnings signs of a lea in%lde a red%#ion in #he pressre or dis%harge flow ra#e in #he pipeline s"s#e!, whi%h %anno# be e8plained b" #he anal"sis of #he reglar opera#ing %ondi#ions. ) dras#i% red%#ion in pressre nor!all" indi%a#es #he presen%e of rp#re in #he pipeline and reires an i!!edia#e sh# down of #he s"s#e!. The e8#en# of pressre red%#ion in #he s"s#e! is no!inal in %ases of !ajor leas whereas i# !a" be nno#i%eable for %ases of !inor leas.
Page 22 of >=
GU-379 Pipeline Emergency Repair Manual
6n%e a sspe%#ed lea is %onfir!ed, iden#ifi%a#ion of #he e8a%# lo%a#ion of #he lea in&ol&es !obilisa#ion of %rews wi#h lea de#e%#ion eip!en# s%h as gas de#e%#ors, l#rasoni% lea de#e%#ion #ools e#%. This phase will also in&ol&e e8posing #he pipeline a# probable lo%a#ions of a lea #o as%er#ain #he e8a%# lo%a#ion. )ll ne%essar" safe#" !easres as reired and spe%ified in #he la#er par#s of #his do%!en# shall be adop#ed dring #he opera#ion. For leaage sr&e" pro%edres, leaage pinpoin#ing, eip!en# and #es# !e#hods for gas leaage, referen%e shall be !ade #o appendi84M of )SM0 52.@4/5. "!,!"
2e%ect4ea AssessmentInspection
6n%e #he lea has been de#e%#ed and lo%a#ed i# shold be a%%essed and %a#egorised in a%%ordan%e wi#h Se%#ion /.- of #his !anal. )ssess!en# and %a#egorisa#ion is essen#ial in de%iding on #he repair pro%edre and safe#" !e#hods #o be adop#ed dring #he repair. In #he absen%e of readil" a&ailable inspe%#ion #ools or de #o #he la% of #i!e, lea assess!en#*inspe%#ion for bried pipeline is nor!all" done b" digging a# #he lo%a#ion of #he lea and rea%hing #he lea posi#ion on #he pipeline. The probable lo%a#ions of #he leas are iden#ified in #he pre&ios phase of lea de#e%#ion. Si#able safe#" !easres as de#ailed in Se%#ion $. shall be i!ple!en#ed before s#ar# of digging. 08%a&a#ion for li&e pipelines shall be done as per 0+D 5@422. 08%a&a#ion a# #he da!aged por#ion of pipeline shall be %arried o# wi#h de regard #o #ren%h s#abili#" and safe egress. In %ases where #he lea has been de#e%#ed b" inspe%#ion #ools, no digging !a" be reired a# #his s#age as #he resl#s prod%ed fro! #he inspe%#ion #es#s nor!all" de#ail #he #"pe, sie and assess!en# of #he defe%#*lea. These inspe%#ion resl#s shall be fr#her in#erpre#ed*assessed b" #rained personnel #o %lassif" #he lea in#o !ajor, !inor or rp#re, #he reason for lea and #o propose #he s#ra#eg" #o be followed in #he repair of #hese defe%#s. 6n rea%hing #he lo%a#ion of #he lea, fr#her &isal inspe%#ion shall be done #o assess and %a#egorise #he da!age. )ll loose wrapping shall be re!o&ed and #he da!aged area shall be %leaned of all #ra%es of !d and e8#raneos !a##er. "!,!3
(hut do5n and pressure reduction
Under nor!al %ir%!s#an%es, no sh#down is reired for %ases of !inor leas as #he repair %an be done on a rnning pipeline e8%ep# in %ases of pipelines #ranspor#ing e8%essi&el" sor or haardos flid and passing #hrogh areas of higher lo%a#ion %lasses 7%lass 5 and - as per SP42/229. Sh##ing down or pressre red%#ion dring !inor leas be%o!es essen#ial in #he following %ases: 4 2. +is of grow#h of #he defe%# a# lo%a#ions wi#h s#resses o#her #han #hose de #o in#ernal pressre onl" e.g. a# lo%a#ions of soil !o&e!en# or se##le!en# or inadea#e pipe sppor# %ondi#ions e#%. /. Presen%e of defe%# 7lea9 in %ri#i%al lo%a#ion 5. Use of ho# wor for #he repair 7!a" reire de%o!!issioning of #he pipeline9
Page 2/ of >=
GU-379 Pipeline Emergency Repair Manual
-. The lea, al#hogh !inor, will s#ill resl# in na%%ep#able safe#" si#a#ion or an en&iron!en#al i!pa%#. Howe&er i# is essen#ial #ha# #he opera#ing pressre of #he s"s#e! be red%ed for all %ases of !inor leas #o a !a8i!! of @N of #he opera#ing pressre a# #he #i!e of defe%# repor#ing #o ensre safe repair opera#ions. Spe%ifi% %are shall be e8er%ised for %ases of downhills of a liid line where #he reired pressre red%#ion of !ore #han @N de #o s#a#i% head of #he liid. The %ri#eria and e8#en# of #he pressre red%#ion shall be &erified b" #he engineer4in4%harge. Se##ings of safegarding ins#r!en#s shall be adjs#ed #o !ain#ain #he pressre red%#ion dring repair period. ote: The pressre red%#ion re%o!!ended abo&e is #he red%#ion reired a# #he #i!e of repair. The pressres a# whi%h #he pipeline s"s#e! shall be opera#ed af#er a%%o!plish!en# of repair shall be de%ided b" #he engineer4in4%harge in i#s %lose o# repor#. For down hill se%#ions where #he @N red%#ion %ri#eria %old no# be !e# de #o s#a#i% head, #he engineer in %harge shall de%ide #he opera#ing pressre dring repair period.
In %ases in&ol&ing haardos !ajor leas, i# is re%o!!ended #o sh#down #he s"s#e! #o a&oid an" disas#ros %onseen%es dring #he repair wors, #o pre&en# an" grow#h in #he defe%# and #o pre&en# an" in%rease in #hrea# #o heal#h, safe#" or #he en&iron!en#. The de%ision for sh##ing down #he pipeline shall be #aen b" #he lo%al e!ergen%" %oordina#or who !s# %arefll" assess #he ris and %onseen%es in&ol&ed and #he loss in prod%#ion on a%%on# of a sh#down. In %ases in&ol&ing rp#re, #he pipeline s"s#e! will in%r a serios pressre drop in #he area of #he rp#re resl#ing in e8%essi&e loss of prod%#. In #hese si#a#ions, sh##ing down #he s"s#e! shold be %arried o# i!!edia#el" #o a&oid fr#her da!age, %on#rol #he ris and a&oid fr#her loss of prod%#. +epairs in #hese %ases nor!all" reire se%#ional repla%e!en#. If #he pipeline has been sh# down, repressrising for #es#ing af#er #he repair shold be done wi#h e8#re!e %a#ion. +epressrising shold be a%%o!plished slowl" and s#eadil" wi#ho# srges #o a&oid &ibra#ion of #he pipeline and fi##ings. (o personnel shold be allowed near #he repair n#il #he #es# has been %o!ple#ed. 6#her safe#" !easres as de#ailed in #he la#er par#s of #his do%!en# shall be adop#ed dring s%h repairs. "!,!+
Repair options
The preferred op#ion for a per!anen# repair is #o %o!ple#el" de%o!!ission #he pipeline, #hen %# o# and repla%e #he se%#ion of pipe %on#aining #he defe%#. Howe&er, #his op#ion is rarel" sed de #o #he #i!e %ons#rain#s. The preferred repair op#ions for 1e&el I e!ergen%" defe%#s %an be %lassified in#o: 4 emporary repair options : 4 These pro&ide #e!porar" relief #o #he defe%#s in #he pipeline s"s#e! b# ha&e #o be re!o&ed and repla%ed wi#h !ore per!anen# al#erna#i&es dring a planned sh#down or as soon as pra%#i%all" possible. S%h !e#hods are e!plo"ed #o red%e #he down #i!e of #he pipeline. ) #e!porar" repair is re%o!!ended onl" when #he loss of prod%#ion %ased b" #he #i!e needed #o e8e%#e a per!anen# repair is s%h #ha# i# js#ifies #he %os# in&ol&ed in bo#h #he #e!porar" repair and #he sbseen# planned per!anen# repair.
Page 25 of >=
GU-379 Pipeline Emergency Repair Manual
Permanent repair options : 4 These pro&ide per!anen# relief #o #he defe%#s, enabling #he nor!al opera#ing pressre of #he s"s#e! #o be !ain#ained for #he re!aining design life. ) #e!porar" repair shold be repla%ed wi#h a per!anen# repair !e#hod wi#hin a period of 5 !on#hs 7as per SP 2/29. )n" fr#her e8#ension be"ond 5 !on#hs shall be sbje%# #o de!ons#ra#ion of perfor!an%e wi#h %onfiden%e and wri##en appro&al fro! %o!pe#en# a#hori#" 7CFDH pipelines9.
6n%e #he defe%# has been %a#egorised and lo%a#ed #he following repair op#ions are re%o!!ended depending pon #he #"pe of defe%#. 7+efer Table 29. a'le - #8 (election o% emergency repair options - &( pipelines ype o% de%ect
emporary repair option
Permanent repair option
Minor lea
Plid%o S!i#hECla!p, Plid%o S!i#hECla!pE Plid%o Spli# E Slee&e or si!ilar Plid%o eldECap Co!posi#e +epairOOOO Plid%o Spli# E Slee&e 7dl" welded9 or si!ilar Se%#ional repla%e!en#O Co!posi#e +epairOOOO Major lea Plid%o Spli# E Slee&e or si!ilar Plid%o Spli# E Slee&e 7dl" Co!posi#e +epairOOOO welded9 or si!ilar Se%#ional repla%e!en# Co!posi#e +epairOOOO 1eaing %ra%s Plid%o Spli#ESlee&eOO or si!ilar Se%#ional repla%e!en# +p#re (I1 Se%#ional repla%e!en# 1eaage #hrogh flange Plid%o Flange E +epair4+ing Se%#ional repla%e!en# Plid%o Flange4+epair E Spli#4 Slee&eOOO or si!ilar 1eaage #hrogh &al&e (il 'al&e repla%e!en#*repair as per !anfa%#rers re%o!!enda#ion 1eas in road %rossings See Se%#ion /.$.=
1eas in wadi %rossings ote: Plid%o brand repair !a#erials are indi%a#ed in #he #able for referen%e prpose onl". )ll Plid%o ei&alen# PD6 appro&ed brand repair !a#erials %an also be sed for e!ergen%" repair.
O
Se%#ional repla%e!en# %an also be a%hie&ed sing Plid%o weldEend %oplings. +efer #o de#ails gi&en below in Se%#ion /
[email protected]. OO The leng#h of spli# slee&e shall be si#able for #he leng#h of %ra%. The welded spli# slee&e %anno# be %onsidered as a per!anen# repair de #o possible propaga#ion of %ra% dring #he ser&i%e. OOO (o# appli%able for &al&e flanges OOOO Co!posi#e repair %an be sed wi#h in #he li!i#s of alifi%a#ion in a%%ordan%e #o )SM0 Code. Please +efer Se%#ion /.=.
Page 2- of >=
GU-379 Pipeline Emergency Repair Manual
"!,!,
Repair o% internal PE lined pipelines
The P0 lined pipelines !a" de&elop leas ei#her de #o 5 rd par#" in#erferen%e #o s%h an e8#en# #ha# #he liner is also da!aged or in4ser&i%e failre of liner and sbseen# %orrosion of #he pipeline. The leas in #hese lines shall be #e!poraril" repaired sing Plid%o spli# slee&es or !e%hani%al %la!p in an e!ergen%" si#a#ion. The #e!poraril" repaired se%#ions of #hese in#ernal P0 lined pipelines shall be repla%ed b" a per!anen# al#erna#i&e !e#hod wi#hin 5 !on#hs period as per se%#ion /.-.$.5 of SP42/2. The flange4#o4flange se%#ional repla%e!en# in%lding repla%e!en# of da!aged liner is #he onl" re%o!!ended per!anen# !e#hod of repair for P0 lined pipelines. "!,!.
Repair options %or leas at areas o% road and 5adi crossings
The repair op#ions spe%ified in Se%#ion /.$.- are appli%able for pipeline leas a# road %rossings sbje%# #o #he %ondi#ion #ha# open %# repair is feasible for s%h roads, e.g. #raffi% di&ersion dring #he repair wors shold no# lead #o an" !ajor disrp#ion. Te!porar" repair op#ions for leas in #hese areas are no# re%o!!ended de #o #he following asso%ia#ed disad&an#ages:4 2. The #e!porar" repair op#ions do no# enable #he %o!ple#e s#r%#ral in#egri#" of #he pipeline #o be res#ored. This is !ore %ri#i%al in areas of road %rossings. /. Te!porar" repairs are shor# #er! and will l#i!a#el" ha&e #o be repla%ed wi#h !ore per!anen# repairs whi%h will reire fr#her %losre of #he road for open %##ing. For roads where open %# is no# possible, e.g. on a !ajor road, #he repair wors shall be done sing boring*drilling #o a&oid disrp#ing #he #raffi% !o&e!en#. In s%h %ases a %asing pipe, along wi#h #he se%#ional spool pie%e, shall be laid sing #hrs#*ager boring. The se%#ional pipe shall be joined #o #he !ain line sing Pild%o eld E 0nd Coplings or welding as shown in Figre4/ .
Page 2$ of >=
GU-379 Pipeline Emergency Repair Manual
Figure "8 (ectional replacement o% de%ecti1e pipeline at road crossings
1eas in pipelines a# wadi %rossings are !ore %ri#i%al as #he leaing oil*gas is liel" #o spread #o a larger area #hrogh #he flood wa#er 7dring rain" seasons9. Dring non4rain" seasons, if #he wadi does no# %on#ain wa#er, nor!al !e#hods as des%ribed in Se%#ion /.$.- %an be sed #o %arr" o# repairs. For wadi #"pes and C, #he %on%re#e %oa#ing o&er #he pipeline shall be re!o&ed and #he ne%essar" repair %arried o#. )f#er %o!ple#ion of #he repair wors, #he %o!ple#e se%#ional spool along wi#h #he asso%ia#ed slee&es shall be re%oa#ed wi#h %on%re#e in4si#. The %on%re#e %oa#ing shall be done in s%h a wa" #ha# #he slee&es do no# ge# da!aged de #o presen%e of gabions o&er #he!. In %ase if #he pipeline lea o%%rs in a li&e wadi 7for e8a!ple dring rain" season9, arrange!en#s shold be !ade #o di&er# #he wadi s#rea! and e&a%a#ion of re!aining wa#er in wadi prior #o s#ar#ing #he repair a%#i&i#". Following di&ersion, e&a%a#ion of wadi, #he repair shall be si!ilar #o #ha# of dr" wadi region e8plained abo&e. Con#inos e&a%a#ion of wa#er sing &a%! #r%s !igh# be reired dring repair a%#i&i#", in %ase if %on#inos ooing of wa#er is no#i%ed. emporary repair options are not recommended %or leas in 5adi crossings .
Page 2= of >=
GU-379 Pipeline Emergency Repair Manual
"!,!7
Repair acti1ity procedures
The a%#i&i#ies de#ailed below shall for! par# of #he o&erall repair wors and shall be applied in %onjn%#ion wi#h #he pro%edre for %arr"ing o# #he spe%ifi% repairs de#ailed in Se%#ion /.$.@. "!,!7!# Procedure %or cleaning o% the de%ect area
The srfa%e of #he defe%#i&e area of #he pipeline shall be %leaned #o enable repair, welding, UT inspe%#ion e#%. The %leaning shall a%hie&e re!o&al of s%ale, rs#, %oa#ings and &ege#a#ion b" #he se of wire brshes, %hipping #ools or gri# blas#ing. The gri# blas#ing shall be per!i##ed onl" when re!aining wall #hi%ness of #he pipe is !ore #han / !!. +eferen%e shall be !ade #o SP42/-= for #his prpose. "!,!7!" &on%irmation o% suita'ility o% li1e pipeline %or permanent repair 5elding
The following %he%s shall be done #o %onfir! #he si#abili#" of #he li&e pipeline for #he prpose of welding:4 2. efore asse!bling #he repair fi##ings #o line pipe an l#rasoni% inspe%#ion shall be %ond%#ed #o %o&er a one e8#ending a !ini!! of 2!! on #he ei#her side of ea%h weld area #o %onfir! a !ini!! wall #hi%ness 7refer poin# no. / below9 and #o %he% for #he la!ina#ions. 1a!inar defe%#s e8%eeding =!! in an" dire%#ion and an" la!ina#ion no# parallel #o #he pipe srfa%e shall be na%%ep#able. Ul#rasoni% #es# #e%hnies shall be in a%%ordan%e wi#h )SM0 ' ar#i%le $ as spple!en#ed b" SP422>=. 1e&els of indi%a#ions reiring in&es#iga#ions are as follows:4 4 all refle%#ors gi&ing an indi%a#ion in e8%ess of /N D)C shall be in&es#iga#ed and e&ala#ed in a%%ordan%e wi#h #he a%%ep#an%e s#andard 7D)C Dis#an%e )!pli#de Corre%#ion9. 4 all refle%#ors gi&ing an indi%a#ion in e8%ess of $N D)C shall be e&ala#ed and repor#ed. 4 all refle%#ors e8%eeding 2N D)C shall be %ase for reje%#ion. /. efore %arr"ing o# an" ind of weld repair on a li&e pipeline, i# shall be ensred #ha# dring #he welding opera#ion #he !a#erial in #he region of #he weld pool has sffi%ien# s#reng#h #o %on#ain safel" #he in#ernal pressre and a&oid a blow o#. The ris of blow o# is dependen# pon a %o!ple8 in#era%#ion of welding %ondi#ions, pipe !a#erial, pipe #hi%ness, pipe #e!pera#re and hoop s#ress. For !a#erial of "ield s#reng#h no# grea#er #han --@ MPa 73rade K4=$ as per )PI $19, opera#ing a# #e!pera#res of no# grea#er #han 5$ deg.C wi#h a hoop s#ress no# grea#er #han >/N of #he spe%ified !ini!! "ield s#ress, blow o# %an be pre&en#ed dring welding pro&ided #he !ini!! #hi%ness is no# less #han -.@!! 7referen%e shall be !ade #o )ppendi84/ and 5 of D0P 52.5@.=.29. The a%#al !ini!! wall #hi%ness shall be de#er!ined b" l#rasoni% #es#ing as spe%ified in poin# no. 2 abo&e. For o#her !a#erials or %ondi#ions, a !ini!! pipe #hi%ness shall be de#er!ined, based on ei#her spe%ifi% pre&ios e8perien%e and*or da#a fro! #rials.
Page 2> of >=
GU-379 Pipeline Emergency Repair Manual
5. elding on li&e pipelines is prohibi#ed for #he following %ases:4 4 Mi8#res of gases or &apors wi#hin #heir fla!!able range or whi%h !a" be%o!e fla!!able as a resl# of hea# inp# in welding opera#ions. 4 68"gen enri%hed a#!ospheres in #he presen%e of h"dro%arbons whi%h !a" be presen# ei#her in #he a#!osphere or in #he deposi#s on #he inside srfa%e of #he pipe. 4 (o welding shall be perfor!ed on lined, %lad or in#ernall" %oa#ed pipes -. )##en#ion shall be paid #o %on#rolling #he pipe wall #e!pera#re dring #he welding #o a&oid de#eriora#ion of #he !i%ros#r%#re of #he pipe !a#erial de #o e8%essi&e hea# inp# resl#ing in e8%essi&e !e#al #e!pera#re. +eferen%e shall be !ade #o Clase 5.5./ of D0P 52.5@.=.2. $. The pressre in #he pipeline s"s#e! shall be &erified #o %onfir! #ha# i# does no# e8%eed #he !a8i!! allowable opera#ing pressre dring welding opera#ions. This shall be based on #he dera#ed pressre %ondi#ions ne%essar" whils# #he !a#erial is a# ele&a#ed #e!pera#re whils# welding. I# is also essen#ial #o pre&en# an" propaga#ion of an" ns#able %ra%s. The !a8i!! allowable opera#ing pressre dring welding shall be de#er!ined as per Clase 5.5.5 of D0P 52.5@.=.2. =. elding on a li&e pipeline nder no4flow or in#er!i##en# flow %ondi#ions shall no# be a##e!p#ed nless i# has been %onfir!ed #ha# no e8plosi&e or fla!!able !i8#re will de&elop dring welding opera#ions. In #his respe%# i# shall be %onfir!ed #ha# no ingress of o8"gen in #he line is possible. In %ases where #his reire!en# %anno# be !e#, ni#rogen prging 7de4%o!!issioning9 shall be done sing a !ini!! prge &elo%i#" of .-!*s. >. ) high liid flow sall" %ases rapid %ooling of #he weld area whi%h resl#s in hard !a#erial ones, whi%h are ss%ep#ible #o %ra%ing. Under #hese %ir%!s#an%es #he !ini!! in#er pass #e!pera#res !a" no# be a##ainable, resl#ing in ndesired !a#erial proper#ies. ) sgges#ed !a8i!! &elo%i#" for liid flow dring welding is 2.>$!*s. There is no res#ri%#ion on !a8i!! &elo%i#" for gas lines, sbje%# #o #he a##ain!en# of a%%ep#able in#er pass #e!pera#res. (o#e:4 For wall #hi%ness be#ween =.-!! and 2/.>!!, flow also in%reases #he weld %ooling ra#e and hen%e #he ris of %ra%ing. Mini!iing #he flow ra#e red%es #he ris of %ra%ing and of brn #hrogh. For !e#al #hi%ness grea#er #han 2/.>!!, #he effe%# of flow on bo#h weld %ooling ra#es and brn #hrogh are less signifi%an#.
"!,!7!3 Procedure %or 5eldinginspection %or emergency de%ect recti%ication
)ll e!ergen%" repair welding and inspe%#ion of welds on pressrised pipeline s"s#e!s, in%lding #he welding of slee&es, %la!ps shall be done as per SP422=> and D0P 52.5@.=.2 and sele%#ed appro&ed welding pro%edre. 6#her pre%a#ions needed dring welding in%lde:4 2. Carefl %on#rol of #he sie and shape of #he %ir%!feren#ial fille# welds. The sie of #he fille# weld shold be a# leas# 2.- #i!es #he wall #hi%ness of #he pipe a# #he weld area.
Page 2@ of >=
GU-379 Pipeline Emergency Repair Manual
/. Main#enan%e of a %on%a&e fa%ed fille# weld wi#h s#rea!lined blending in#o bo#h !e!bers. The s!oo#her and !ore s#rea!lined #he weld profile, #he grea#er #he resis#an%e #o fa#ige failre. 5. )&oiding no#%hes and nder%#s dring welding. -. Use of welding %ons!ables as indi%a#ed in appro&ed PS. $. Use of #e!pera#re %ra"ons or probe #her!o!e#ers, #o !oni#or hea# genera#ed dring welding or prehea#ing opera#ions, par#i%larl" near #he areas of #he sof# seals. If #he hea# genera#ed approa%hes #he #e!pera#re li!i# of #he seal !a#erial, whi%h is indi%a#ed on #he label, welding shold be dis%on#ined #o allow #he affe%#ed area #o %ool. =. 0nsring #ha# welding does no# o&erhea# #he seals. The welding shold be seen%ed so #ha# #he hea# is no# %on%en#ra#ed in one area. I# !a" be ne%essar" #o re4#ore #he s#d bol#s and n#s periodi%all" dring field welding be%ase weld %on#ra%#ion %ases #he! #o loosen. >. )&oiding brn #hrogh dring #he roo# rn. Firs# weld pass for pipelines wi#h a wall #hi%ness less #han =.-!! #hi% shold be a%hie&ed b" sing /.-!! or s!aller dia!e#er welding ele%#rode #o li!i# hea# inp#. @. For pipelines wi#h wall #hi%ness !ore #han 2/.>!!, where brn #hrogh is no# a pri!ar" %on%ern, %are shold be #aen b" a&oiding #he se of e8%essi&e welding %rren#. PD6 pre4alified welding pro%edres and welders 7P+42/>=, SP422>>9 shall be sed for welding on li&e pipelines #o a&oid dela" de #o pre4alifi%a#ion. Howe&er, in so!e s%enarios, in order #o %arr" o# weld repairs wi#ho# #he dela" #he following de&ia#ions are per!i##ed fro! SP422>>:4 2. If no re%ords are a&ailable, #he defe%#i&e line pipe shall be ass!ed #o be )PI $1 3rade , whi%h shall be sed for #he new repla%e!en# pipe if no !a#erial spe%ifi%a#ion re%ords are a&ailable. /. The pipeline engineer shall de%ide #he PS and PA+ #o be followed in %onsl#a#ion wi#h repair %on#ra%#or and welding engineer. elding %ondi#ions and rele&an# para!e#ers shall be no#ed and #es# pie%es shall be prepared on%e #he job is %o!ple#e. 5. 2N radiograph", UT and MPI shall be done on all e!ergen%" repair welds. -. )ll re%ords and #es# pie%e resl#s shall be re&iewed af#er #he repair, #o de#er!ine if #he !e#hod !ee#s #he reire!en#s of #he appli%a#ion. If dee!ed ne%essar", %##ing o# and repla%e!en# of na%%ep#able weld repairs shall be planned and e8e%#ed as per SP422>>. "!,!7!+ Procedure %or recoatingpainting o% the de%ect area
)f#er %o!ple#ion of #he repairs, #he defe%#i&e area shall be re%oa#ed * repain#ed as per SP42/-=.
Page 2< of >=
GU-379 Pipeline Emergency Repair Manual
"!,!7!, Procedure %or sand padding and 'ac%illing o% the trench
2. S%reened sof# sand, free of ro% and foreign !a##er, shall be sed for sand padding. The !ini!! dep#h of padding below #he pipe shall be 5 !!. /. Hand sho&el and wooden hand4ra!!ing de&i%e shall be sed for #he pla%e!en# of sand nder #he pipe. 5. Sand shall be lowered in#o #he #ren%h wi#h a !e%hani%al sho&el and hand spread nifor!l" arond #he pipe. The dep#h of #he sand padding o&er #he #op of #he pipe shall be a# leas# 5 !!. Sand on #op of #he pipe shall be shaped #o #he na#ral angle of repose. -. S%reened e8%a&a#ed !a#erial fro! #he lo%a#ion shall be sed 7af#er #he re!o&al of an" ro% and bolders9 on #op of #he sand. In order no# #o da!age #he sand padding, #he ini#ial la"ers of final fill shall be %arefll" lowered in#o #he #ren%h fro! ea%h side b" !e%hani%al sho&el ensring #ha# #he ba%fill !a#erial is deposi#ed %arefll" #o a&oid dis#rbing #he sand padding. $. The !e%hani%al e8%a&a#or shall !ain#ain #he following minimum safe dis#an%es 7whi%h shall be %learl" !ared b" a line of bn#ing9 fro! #he edge of #he #ren%h: 4
+o%: dis#an%e fro! edge of #ren%h shall be 2. !e#re
4
Co!pa%#ed grond: dis#an%e fro! ba##ered edge of #ren%h shall be 2.$ !e#re
4
Sof# sand wi#h #ren%h sides ba##ered #o a !ini!! slope of /:2: dis#an%e shall be / !e#res.
=. )f#er %o!ple#ion of #he ini#ial ba%fill la"er, #he re!aining ba%fill shall be finished #o a le&el sligh#l" abo&e #he na#ral grade and shall be #horoghl" %o!pa%#ed b" !eans of a %o!pa%#ing &ibra#or. >. indrow shall be reins#a#ed, in%lding #he se%#ion sed for #e!porar" %rossings. here #he e8%a&a#ion %rosses wadis or di#%hes wi#h lined or o#herwise i!pro&ed srfa%es, #hese shall be reins#a#ed #o #heir original %on#or and %ondi#ion. +eferen%e shold also be !ade #o 0+D 5@422 and SP42/@ for de#ails on reins#a#e!en#. "!,!7!. Procedure %or de-commissioning isolation and draining1enting o% the pipeline %or de%ect repair :enting2raining o% the pipeline
Co!ple#e draining and &en#ing of #he pipeline is essen#ial in %ases of se%#ional repla%e!en# of a defe%#i&e por#ion of #he pipeline. For pipelines wi#h blo% &al&e s#a#ions draining %an be li!i#ed #o #he se%#ion be#ween #he blo% &al&es. here #here are no blo% &al&es, #he en#ire leng#h of #he pipeline shall be drained. For pipelines 5ithout 'loc 1al1e stations8 For s%h pipelines !os# of #he flid is drained fro! #he pipeline dring #he depressrisa#ion pro%ess b" sh##ing down #he flow and opening #he &al&es a# #he re%ei&ing end s#a#ion. The re!aining flid %an be drained b" opening #he drain and &en# &al&es a# ea%h end. The drained flid shall be disposed of safel" #o pre&en# an" haard #o life or #he en&iron!en#. For an" residal
Page / of >=
GU-379 Pipeline Emergency Repair Manual
flid #rapped in #he pipeline s%h as in areas of lower ele&a#ions, #he engineer4in4 %harge shall s#d" #he need for fr#her draining*&en#ing. This %an be a%%o!plished as follows:4 2. For liid lines, #he rp#red or leaing por#ion of #he pipeline shall be %o&ered #e!poraril" ei#her b" a slee&e or %o!posi#e reinfor%ing slee&e and pigging wi#h sof# pigs %arried o#, dri&en wi#h %o!pressed ni#rogen or wa#er, #o displa%e #he re!aining liid. )l#erna#i&el", #he #rapped liid %an be re!o&ed sing s%#ion p!ps. The s%#ion hose shall be inser#ed in#o #he pipeline ei#her #hrogh drain &al&es or #hrogh #he leaing por#ion and #he liid #ransferred #o a #aner. The se of s%#ion p!ps is li!i#ed depending pon #he %apa%i#" of #he p!p a&ailable and #he leng#h*#errain of #he pipeline and is onl" re%o!!ended for s!all leng#hs. )no#her !e#hod of draining #he liid line is b" flshing wi#h wa#er 7for general de#ails refer #o P+4 2>-9 /. For gas pipelines, an" re!aining #rapped gas %an be &en#ed b" prging wi#h iner# gas fro! one or bo#h ends of #he pipeline. 'en#ing of an" haardos gases shall onl" be allowed onl" #hrogh #he designa#ed &en#s and shall be si#abl" flared in a%%ordan%e wi#h s#andard safe#" pro%edres. For pipelines 5ith 'loc 1al1e stations8 For #hese pipelines onl" #he por#ion be#ween #he blo% &al&es needs #o be drained and &en#ed. This shall be done as follows:4
2. For liid lines, #he #rapped liid shall be drained o# #hrogh #he drain &al&es a# #he blo% &al&e s#a#ions. )n" re!aining liid %an be re!o&ed sing s%#ion p!ps. The s%#ion hose shall be %onne%#ed #o #he drain lines a# #he blo% &al&e s#a#ions. The %apa%i#" of #he s%#ion p!p shold be sffi%ien# #o drain appro8i!a#el" 5/ ! of pipeline being #he !a8i!! leng#h be#ween #wo blo% &al&e s#a#ions. Flshing wi#h wa#er %an also be nder#aen #o re!o&e #he h"dro%arbon liid as spe%ified abo&e. /. For #he handling non4sor gases, %on#rolled &en#ing %an be done #o a#!osphere #hrogh #he &en#s pro&ided a# #he ' s#a#ions. )n" re!aining #rapped gas %an be &en#ed o# b" iner# gas prging fro! one or bo#h s#a#ions. 'en#ing of an" haardos gases shall onl" be allowed #hrogh designa#ed &en#s and shall be flared in a%%ordan%e wi#h s#andard safe#" pro%edres ei#her #hrogh #e!porar" !obile flare or as dire%#ed b" #he PD6 Safe#" 6ffi%er. (o#e: I# is also feasible #o drain and &en# #he pipeline b" ins#alling a ho# #ap #hrogh whi%h #he pipeline %on#en#s %an be drained, &en#ed or flared.
Isolation o% the pipeline
If dee!ed ne%essar", e&en af#er isola#ing and draining #he defe%#i&e se%#ion a# #he blo% &al&e s#a#ions, fr#her lo%alised isola#ion b" se of spe%ifi% pipeline isola#ion plgs s%h as P0 3rip 1o% Pipe Plgs, air plgs, !d*freee plgs or Hi fri%#ion pigs is re%o!!ended.
Page /2 of >=
GU-379 Pipeline Emergency Repair Manual
For s!aller leng#hs where no blo% &al&e s#a#ions e8is#, #he pipeline shall be firs# de%o!!issioned and #hen #he defe%#i&e seg!en# is isola#ed sing air*!e%hani%al plgs*s#opples. Isola#ion of a defe%#i&e por#ion of a pipeline wi#ho# blo% &al&es is essen#ial #o pre&en# #he possibili#" of #rapped flid draining fro! o#her areas whils# repairs are in progress and also #o pre&en# #ransfer of welding f!es #o o#her seg!en#s of #he pipeline. The reire!en# of isola#ion for #hese pipelines shall be &erified b" 6pera#ions personnel and done in a%%ordan%e wi#h P+42>=. ote8- Ho# #apping #he line #o pro&ide a !eans of inser#ing #he plgs*s#opples #o isola#e #he defe%#i&e line se%#ion !a" affe%# a safe repair. Considera#ions shold be gi&en #o #he fa%#ors s%h as prod%# %hara%#eris#i%s, pipe %ondi#ion, #e!pera#res and reired differen#ial pressres #o ensre #ha# #he proper #"pe of plgs are sed and #ha# #heir holding %apa%i#" %an adea#el" resis# #he pressre #o be en%on#ered. 'arios #"pes of plgs #ha# %an be possibl" sed for isola#ion in%lde !d plgs, freee plgs and !e%hani%al*air plgs.
"!,!7!7 Emergency repair close out report
The prpose of #he %lose o# repor# is #o %ap#re all #he rele&an# a%#ions #aen #o iden#if" #he %ase of da!age, #he repair !e#hods sed and #o ser&e as feedba% #o %orre%# an" defi%ien%" and !ae f#re i!pro&e!en#s. The re%o!!ended #able of %on#en#s shall be as follows:4 2. Pipeline ser&i%e and de#ails 7flid #ranspor#ed, flow, opera#ing pressre, dia!e#er, wall #hi%ness, "ear bil# e#%.9 /. T"pe of defe%#, %ase and assess!en# of da!age 7safe#", en&iron!en# and loss of prod%#ion9 5. +epair !e#hod 7ad&an#ages and disad&an#ages9 -. )s bil# drawings re&isions. $. Con%lsions and la#eral re%o!!enda#ions, in%lding #he reire!en# #o dera#e #he pipeline af#er %o!ple#ion of repair if ne%essar". =. Feedba% #o pipeline e!ergen%" repair !anal. >. )n" o#her addi#ional %he%s or #es#s fond ne%essar" #o &erif" #he in#egri#" of #he pipeline. This repor# shall be in addi#ion #o an" o#her reire!en#s spe%ified in #he PD6 e!ergen%" pro%edres and HS0 <>42*P+42=.
Page // of >=
GU-379 Pipeline Emergency Repair Manual
"!,!;
Emergency repair methods < &( pipelines
The following se%#ions %o&er #he &arios e!ergen%" repair !e#hods for CS pipelines. For ease of referen%e #he Plid%o S!i#h brand of repair !a#erials ha&e been o#ed in #his !anal. Howe&er, ei&alen# prod%#s a&ailable fro! o#her !anfa%#rers %an also be sed pro&ided #he" are an appro&ed &endor lis#ed in #he )'M0. "!,!;!# Plidco (mith = &lamp = >eld = &ap
Plid%o S!i#h E Cla!p is a #e!porar" repair sol#ion for !inor leas. The poin# of #he %one is %en#red e8a%#l" on #he hole, and for%e applied sing #he for%e s%rew #o sh# off #he lea. The draw bol#s a# #he bo##o! of #he fi##ing are sed #o hold #he %la!p in pla%e. The se of a welded Plid%o eld E Cap when sed in %onjn%#ion wi#h #he Plid%o S!i#h E Cla!p !aes #he repair per!anen#. +eferen%e shall be !ade #o )ppendi8 5 and - for de#ails.
Applications : 4
2. Plid%o S!i#h E Cla!ps are a&ailable in s#andard sies fro! 2.$J #o -@J /. The s#andard pressre ra#ing for Plid%o S!i#h E Cla!p and Plid%o eld E Cap is / psig 7Q25@ barg9. 5. Plid%o eld E Cap are a&ailable in s#andard sies fro! -J #o -@J -. elding of #he eld E Cap is reired for per!anen# repair $. Can #olera#e onl" !inor srfa%e irreglari#ies p #o E 2*5/J Procedure %or installation on li1e pipelines : 4
For #e!porar" repair: 2. /. 5. -. $.
'erif" #he pipeline as per Se%#ion /.$.5 0nsre all safe#" pre%a#ions as per Se%#ion $. Clean #he defe%# area as per Se%#ion /.$.>.2 Ins#all Plid%o S!i#h E Cla!p as per !anfa%#rers pro%edre Prepare de#ailed repor# as per Se%#ion /.$.>.>
For per!anen# repair %on#ine as follows: =. 'erif" and %onfir! #he si#abili#" of #he pipeline for welding as per Se%#ion /.$.>./ >. Ins#all Plid%o eld E Cap as per !anfa%#rers pro%edre @. eld #he Cap and inspe%# #he weld as per Se%#ion /.$.>.5. <. +e%oa#*pain# #he s"s#e! as per Se%#ion /.$.>.2. Sand padding and ba%filling as per Se%#ion /.$.>.$ 22. Prepare de#ailed repor# as per Se%#ion /.$.>.> "!,!;!" Plidco (plit = (lee1e
These %an be sed for #e!porar" and per!anen# repairs. The seal welded Plid%o Spli# E Slee&e is %onsidered as per!anen# repair sol#ion.
Page /5 of >=
GU-379 Pipeline Emergency Repair Manual
ote: I# is preferable onl" #o se #his s"s#e! as a #e!porar" repair !e#hod be%ase of #he high %os#. I#
is re%o!!ended no# #o weld #he %la!p #o #he pipeline and #o repla%e i# as soon as pra%#i%able wi#h a per!anen# repair s%h as se%#ional repla%e!en# of #he defe%#i&e se%#ion.
The sie of #he slee&e #o be sed shall be sele%#ed based on #he dia!e#er of #he line pipe and #he leng#h of #he defe%#. The leng#h shall be s%h #ha# #he slee&e e8#ends a !ini!! of .2! be"ond #he defe%#. )dja%en# slee&es shall no# be pla%ed %loser #han one4half pipe dia!e#er fro! ea%h o#her. 6&er slee&es %an be sed #o %o&er defe%#s in areaRs adja%en# #o or be#ween #he slee&es. These shall be welded #o #he original slee&e sing alified welding pro%edres. The !ini!! reired wall #hi%ness and s#eel grade of #he slee&e shall be based on #he wall #hi%ness and design fa%#or applied #o #he pipeline. The slee&e #hi%ness shall be adea#el" in%reased #o %o!pensa#e for #he groo&e of #he ba%ing s#rips or sea!s of #he pipeline. The leng#h of slee&e shall no# be less #han .2!. +eferen%e shall be !ade #o )ppendi84/ for de#ails. Applications8
2. S#andard Plid%o spli# E slee&es are a&ailable for a woring pressre p #o 2 psig 7Q =< barg9. /. )&ailable in )PI pipe sies fro! 2.$J #o -@J 5. Higher woring pressre or longer leng#h slee&es %an be !ade #o order -. The slee&e shall no# be sed #o %ople pipes wi#ho# sffi%ien# end res#rain# be%ase i# does no# pro&ide an" longi#dinal res#rain# in an nwelded %ondi#ion. $. S#andard bod" !a#erials are ) 2= sea!less pipe, ) /2= CC %as# s#eel, ) $2= or ei&alen#. 6#her !a#erials are a&ailable on rees#. =. The seal %an #olera#e onl" !inor srfa%e irreglari#ies p #o E2*5/J >. The seals and girder rings on #he slee&e %an be da!aged b" %areless handling wi#h lif#ing de&i%es s%h as %hains, %ables or lif# #r% fors whi%h %an resl# in #he seals being dislo%a#ed fro! #he groo&e. @. The slee&es %an be field #es#ed p #o 2.$ #i!es #he design woring pressre. <. The slee&e shold be s#ored in a dr" en&iron!en# #o pre&en# #he npain#ed srfa%es fro! rs#ing. S#orage #e!pera#res shold no# e8%eed 2/ deg.F 7-< deg C9. The" shall be %o&ered wi#h dar pol"e#h"lene #o pro#e%# #he !a#erial fro! dire%# snligh#. I!properl" s#ored ni#s %an %ase #he seal !a#erial #o be%o!e bri##le and %ra%ed and #hs lose #he sealing proper#ies. Procedure %or installation on li1e line : 4
For #e!porar" repair: 2. /. 5. -. $.
'erif" #he pipeline as per Se%#ion /.$.5 0nsre all safe#" pre%a#ions as per Se%#ion $. Clean #he defe%# area as per Se%#ion /.$.>.2 Ins#all Plid%o Spli# E Slee&e as per !anfa%#rers pro%edre Prepare de#ailed repor# as per Se%#ion /.$.>.>
For per!anen# repair %on#ine as follows: =. 'erif" and %onfir! #he si#abili#" of #he pipeline for welding as per Se%#ion /.$.>./
Page /- of >=
GU-379 Pipeline Emergency Repair Manual
>. Seal weld #he ends, sides and bo##o! of n#s as per Se%#ion /.$.>.5 @. Inspe%# #he weld as per Se%#ion /.$.>.5. <. +e%oa#*pain# #he s"s#e! as per Se%#ion /.$.>.2. Sand padding and ba%filling as per Se%#ion /.$.>.$ 22. Prepare de#ailed repor# as per Se%#ion /.$.>.> "!,!;!3 (pool Piece 5ith Plidco >eld = End couplings
The ins#alla#ion of a spool pie%e sing Plid%o eld E 0nd %oplings reires sh#down and depressrisa#ion of #he pipeline. The #hi%ness and !a#erial grade of #he spool pie%e shall be #he sa!e as #ha# of #he line pipe and shall be de#er!ined sing #he ea#ions and safe#" fa%#ors as gi&en in SP42/22. The !a#erial shall %onfor! #o )PI $1 spe%ifi%a#ion. elding in %ases of neal wall #hi%nesses shall be done as per )SM0 52.- or 52.@ as appropria#e. +eferen%e shall be !ade #o )ppendi8 $ for de#ails. Plid%o weldEend %oplings %anno# ss#ain e8#ernal for%es s%h as #e!pera#re e8pansion and %on#ra%#ion, grond !o&e!en# e#%. Application: 4
2. This !e#hod of repair reires sh#down and depressrisa#ion of #he pipeline #o re!o&e #he defe%#i&e se%#ion wi#h %o!ple#e draining and isola#ion of #he prod%# fro! #he affe%#ed area. /. I# is a #i!e %ons!ing per!anen# pro%ess as %o!pared #o o#her !e#hods of repair as i# reires dis!an#ling and repla%e!en# of #he affe%#ed pie%e of #he line pipe. 5. Te!porar" repair for a period of no# !ore #han = !on#hs %an be a%hie&ed b" %la!ping and #igh#ening #he #hrs# s%rews wi#ho# welding #he %opling. -. Per!anen# repair is a%hie&ed b" welding #he %opling #o #he line pipe. This !a" reire addi#ional #i!e be%ase liid flow #hrogh #he pipeline will ha&e #o be re4 %o!!en%ed and safe %ondi#ions rea%hed #o per!i# welding. elding on a line nder no4flow or in#er!i##en# flow %ondi#ions shall no# be a##e!p#ed nless i# %an be posi#i&el" es#ablished #ha# no e8plosi&e or fla!!able !i8#re will de&elop dring #he welding opera#ion. $. here signifi%an# longi#dinal loads are presen# and i# is no# feasible #o weld #he %opling, addi#ional rows of %la!ping s%rews %an be pro&ided or #he Pild%o %la!p E +ing !a" be sed. =. S#andard sies are a&ailable fro! 2.$J #o -@J >. S#andard !a#erials are )42=, )42$, )4/@$, )4$2=. @. Coplings are si#able for an%hored pipeline join#s onl". <. The !odel of #he %opling !s# be sele%#ed #o #he sa!e pressre* #e!pera#re ra#ing as #he line pipe. 2. Coplings are si#able for #he !ini!! pipe wall #hi%nesses as spe%ified in Table /. Pipelines wi#h wall #hi%nesses less #han #hose spe%ified in #he #able will no# wi#hs#and #he for%e of #he %la!p s%rews and hen%e #his appli%a#ion will be nsi#able. )s a sol#ion, Plid%o Cla!p E +ing s hold be %onsidered. 22. The se of #hese %opling on elbows and bends is li!i#ed de #o #he possibili#" of pllo#s %ased b" e8#ernal and in#ernal for%es. 2/. For badl" !isaligned or o# of rond pipe, i# is helpfl #o grind a pilo# be&el wi#h a generos #aper on #he pipe. This shold eli!ina#e #he ris of da!age #o #he seals
Page /$ of >=
GU-379 Pipeline Emergency Repair Manual
while ins#alling #he %opling o&er #he end of #he pipe. +efer #o )ppendi8 $ for de#ails. ominal pipe si?e )inch*
Min! 5all thicness ) mm*
-
=.
=
>.2
@
@./
2
<.5
2/
2.-
2-
22.2
2= ? larger
2/.>
a'le ": Mini!! pipe wall #hi%nesses for Plid%o eld E 0nd %oplings
Procedure %or installation : 4
For #e!porar" repair: 2. Sh#down #he pipeline s"s#e! /. 0nsre all safe#" pre%a#ions are in pla%e as per Se%#ion $. 5. Depressrise #he %o!ple#e pipeline s"s#e! #o a#!ospheri% pressre b" opening #he ne%essar" drain*&en# &al&es as per Se%#ion /.$.>.= -. 0nsre #ha# #he isola#ed se%#ion has been adea#el" drained and is free fro! an" #rapped flid as per Se%#ion /.$.>.= $. If reired, isola#e #he defe%#i&e se%#ion as per Se%#ion /.$.>.= =. Sele%# #he spool pie%e of wall #hi%ness and grade as spe%ified abo&e. >. H"dro4#es# #he spool pie%e separa#el" as per SP42/22 @. Clean #he defe%# area as per Se%#ion /.$.>.2 <. Cold %# #he defe%#i&e por#ion of #he pipeline as per general gidelines gi&en in P+422-= 2. Ins#all Plid%o eld E 0nd %opling as per !anfa%#rers re%o!!enda#ion 22. Slide #he spool pie%e in #he %opling and #igh#en #he s%rews 2/. Prepare de#ailed repor# as per Se%#ion /.$.>.> For per!anen# repair, %on#ine as follows: 25. +e4%o!!ission #he s"s#e!, &erif" and %onfir! #he si#abili#" of #he pipeline for welding as per Se%#ion /.$.>./ 2-. Seal weld #he %opling as per Se%#ion /.$.>.5 2$. Inspe%# #he weld as per Se%#ion /.$.>.5 2=. +e%oa#*pain# #he s"s#e! as per Se%#ion /.$.>.2>. Sand padding and ba%filling as per Se%#ion /.$.>.$ 2@. Prepare de#ailed repor# as per Se%#ion /.$.>.>
ote : Pild%o eld E 0nd %oplings onl" #aes in#o a%%on# #he for%es on a join# de #o #he in#ernal pressre and does no# %onsider addi#ional e8#ernal for%es lie #her!al e8pansion and %on#ra%#ion, nderwa#er %rren#s, grond !o&e!en# or %o!bina#ion #hereof. If an" of #hese addi#ional for%es are e8pe%#ed #o o%%r, i# is re%o!!ended #ha# ei#her #he %opling be welded or se of Plid%o Cla!p E +ing along wi#h Plid%o eld E 0nd is re%o!!ended
Page /= of >=
GU-379 Pipeline Emergency Repair Manual
"!,!;!+ Plidco Flange = Repair-Ring
These are sefl for s#opping leas #hrogh #he gase#s of #he flanges. Plid%o Flange E +epair +ings are ins#alled b" pla%ing #he #wo hal&es arond #he flange and sing s#ds and n#s #o draw #he! #oge#her. ol# leaage is s#opped b" inje%#ing a re%o!!ended sealan# wi#h a pressre gn. +eferen%e shall be !ade #o )ppendi84= for de#ails. Application4imitations: 4
2. /. 5. -. $. =.
Can be sed #o s#op #he leaage #hrogh #he gase# por#ion of #he flanges onl". )&ailable for s#andard flange sies J #o 2/J 2$ lb #o = lb Sealan# inje%#ion reired #o s#op leaage #hrogh #he bol#s. Pressre gn reired #o inje%# sealan# Canno# be sed #o %ople #he flanges and pro&ides no longi#dinal res#rain#. I# is onl" a #e!porar" !e#hod of repair.
Procedure: 4
2. /. 5. -. $. =. >. @. <. "!,!;!,
'erif" #he pipeline as per Se%#ion /.$.5 0nsre all safe#" pre%a#ions are in pla%e as per Se%#ion $. Clean #he defe%# area of #he leaing flange as per Se%#ion /.$.>.2 Ins#all Plid%o Flange E +epair +ing as per !anfa%#rers pro%edre Seal #he bol#s sing sealan# and pressre gn as per !anfa%#rers pro%edre Inspe%# #he s"s#e! &isall" +e%oa#*repain# #he area as per Se%#ion /.$.>.Pla%e sand padding and ba%fill as per Se%#ion /.$.>.$ Prepare de#ailed repor# as per Se%#ion /.$.>.> Plidco Flange-Repair = (plit-(lee1e
The Plid%o Flange +epair ESpli# Slee&e fll" en%apsla#es #he !a#ed flanges and seals #o #he pipe be"ond #he weld of #he flanges. The" are sefl for s#opping leas #hrogh an" por#ion of #he flanges. +eferen%e shall be !ade #o )ppendi8 > for de#ails. 4imitations: 4
2. I# is a #e!porar" !e#hod of repair. /. High %os#. Procedure: 4
2. /. 5. -. $. =. >. @.
'erif" #he pipeline as per Se%#ion /.$.5 0nsre all safe#" pre%a#ions are in pla%e as per Se%#ion $. Clean #he defe%# area of #he leaing flange as per Se%#ion /.$.>.2 Ins#all Plid%o Flange +epair E Spli# Slee&e as per !anfa%#rers pro%edre Inspe%# #he s"s#e! &isall" +e%oa#*repain# #he area as per Se%#ion /.$.>.Pla%e sand padding and ba%fill as per Se%#ion /.$.>.$ Prepare de#ailed repor# as per Se%#ion /.$.>.>
Page /> of >=
GU-379 Pipeline Emergency Repair Manual
"!,!;!. @ot apping
This !e#hod is sed #o re%#if" a defe%# in a pipeline in ser&i%e. ) ho# #ap fi##ing is ins#alled arond #he defe%#i&e seg!en# and #he defe%#i&e seg!en# is re!o&ed in #he sa!e wa" as re!o&ing a seg!en# fro! #he pipe wall for bran%h %onne%#ions sing #he ho# #ap !e#hod. I# %an also be sed for ins#alling a #e!porar" b"pass #o #he !ain line #o %arr" o# a se%#ional repla%e!en#. )ll reire!en#s as spe%ified in D0P 52.5@.=.2 shall appl" whils# %arr"ing o# #he ho# #apping. "!,!;!7 (ectional Replacement )5ithout couplings*
Se%#ional repla%e!en# is a per!anen# !e#hod of repair. Howe&er, #his reires depressrisa#ion of #he pipeline and sh#down of #he s"s#e!. The repla%e!en# pipe se%#ion shall ha&e s#reng#h of a# leas# #ha# of #he pipeline and shall !ee# #he reire!en#s of )PI $1 . The se%#ion shall be designed as per SP42/22 wi#h sa!e fa%#or of safe#" as sed for #he original pipeline and shall be h"dro #es#ed as per SP4 2/22 and D0P 52.-.-.5@4PD6 prior #o ins#alla#ion. The leng#h of #he repla%e!en# se%#ion shall no# be less #han half #he dia!e#er of #he pipeline or 5!!, whi%he&er is grea#er. (o se%#ion shall be ins#alled %loser #han 2$!! #o an e8is#ing weld. Application: 4
2.
This !e#hod is a #i!e %ons!ing pro%ess of repair de #o reiring sh#down and de4%o!!issioning of #he pipeline. /. The proper#ies of #he original pipeline need #o be nown #o de#er!ine #he proper#ies of #he repla%e!en# pipe !a#erial #o be sed. 5. The !e#hod reires end prepara#ion of #he e8is#ing pipeline for welding. The leng#h of #he pipe #o be %# o# shall be s%h #ha# in addi#ion #o repla%ing #he defe%#i&e se%#ion, #he wall #hi%ness where #he pipe is #o be joined is si#able for end prepara#ion and welding. Procedure: 4
2. Sh#down #he pipeline s"s#e! and #ransfer #he prod%# a# #he blo% &al&e or end s#a#ions /. 0nsre all safe#" pre%a#ions are in pla%e as per Se%#ion $. 5. Isola#e and de4%o!!ission #he se%#ion #o be repla%ed #o !ae #he se%#ion free fro! h"dro%arbons as per Se%#ion /.$.>.= -. Sele%# a spool pie%e of #he reired wall #hi%ness and grade as spe%ified abo&e. $. H"dro4#es# #he spool pie%e separa#el" as per SP42/22. =. Clean #he defe%# area as per Se%#ion /.$.>.2 >. Cold %# #he defe%#i&e se%#ion #o be repla%ed. @. Clean #he %# ends of #he pipeline #o be welded and prepare*be&el #he ends <. eld #he repla%e!en# se%#ion wi#h #he e8is#ing pipeline as per SP422>> 2. Inspe%# #he weld as per SP422>> 22. +e%oa#*repain# #he s"s#e! as per Se%#ion /.$.>.2/. Pla%e sand padding and ba%fill as per SP42/@ 25. +e4%o!!ission #he pipeline as per reire!en#s of SP42/22, &erif" and %onfir! if de4ra#ing of #he pipeline is reired.
Page /@ of >=
GU-379 Pipeline Emergency Repair Manual
2-. Prepare de#ailed repor# as per Se%#ion /.$.>.> "!,!9
Minimum recommended tools and euipment
The repair %rews shall be eipped wi#h all si#able eip!en# as reired for #he spe%ifi% #"pe * !anfa%#re of #he pipeline being repaired and shall %arr" an adea#e range of fll" %o!pa#ible spare pipe and fi##ings. In addi#ion #he following #ools and %ons!ables shall be %arried: 2. /. 5. -. $. =. >.
Te!pera#re and rela#i&e h!idi#" !easring eip!en#s Measring #ape, sliding gage, pipe !arer 7pen9 e&elling Ma%hine in%hes 3rinders Sol&en# %leaner, %leaning rags PP0 7glo&es, e"e pro#e%#ion, ds# !as9
)n" addi#ional #ools* eip!en# reired shall be ad&ised b" #he engineer4in4%harge. "!.
&omposite Repair8 An Alternati1e Repair Method
Co!posi#e repair !e#hod is an p%o!ing #e%hnolog" for repair of %orrosion and #hrogh wall defe%#s in a pipeline. The %o!posi#e !a#erial %onsidered wi#hin #he do%!en#, are #hose wi#h glass 73+P9 or %arbon 7CF+P9 reinfor%e!en# in a pol"es#er, &in"l es#er or epo8" !a#ri8. These repairs %an be sed as an al#erna#i&e #o #he se of Me%hani%al Cla!p or Plid%o Spli# Slee&e for a leaing defe%# 7#hrogh wall defe%#s9, if designed, alified and applied in a%%ordan%e wi#h #he )SM0 %ode (on Me#alli% Co!posi#e +epair S"s#e!s for Pipelines and Pipe wor: High +is )ppli%a#ions J wi#h in #he li!i#s of #he alifi%a#ion. The )SM0 ar#i%le is %rren#l" in re&iew. The )SM0 draf# reires a repair life#i!e #o be spe%ified, whi%h %an range fro! less #han / "ears p #o an#i%ipa#ed ser&i%e life of #he s"s#e!. The %o!posi#e repair shall be designed in s%h a !anner #ha# i# #aes in#o a%%on# #he f#re grow#h of #he defe%# for #he re!aining design life of #he pipeline. ) !ajor ad&an#age of #he !e#hod is #he rela#i&e ease of appli%a#ion, sing si!ple hand #ools wi#ho# an" welding. The %o!posi#e repair is !os# si#able where %la!p*slee&es %anno# be ins#alled de #o geo!e#ri% %ons#rain# e.g. bends, red%ers, T4pie%es e#%. For s#raigh# pipe se%#ions #his !e#hod %an be sed, in %ase si#able %la!p* slee&es are no# a&ailable a# #he #i!e of lea. For ea%h repair si#a#ion a ris assess!en# shall be %arried o#. The ris assess!en# shall in%lde %onsidera#ion of #he haards asso%ia#ed wi#h #he s"s#e! ser&i%e, #he a&ailabili#" of #he personnel wi#h #he ne%essar" sills, #he ease wi#h whi%h i# is pra%#i%able #o e8e%#e srfa%e prepara#ion opera#ions, #he a&ailabili#" of design da#a. 1ea before brea, inspe%#abili#", and perfor!an%e nder pse# and !ajor in%iden# si#a#ions in%lding fire, e8plosion, %ollision and en&iron!en#al loading.
Page /< of >=
GU-379 Pipeline Emergency Repair Manual
Manfa%#rer of %o!posi#e repair !a#erial shold pro&ide fll ins#alla#ion ins#r%#ions in%lding srfa%e prepara#ion, gri# blas#ing, ins#aller alifi%a#ions, la!ina#e la" p e#%. +epair shall be %arried o# in a%%ordan%e wi#h #he !anfa%#rers pro%edres and b" !anfa%#rer appro&ed and #rained personnel. The e" poin# #ha# !s# be %onsidered in design and appli%a#ion of bonded repair is #ha# #he %o!bina#ion of pipe !a#erial* srfa%e prepara#ion #e%hnie* %o!posi#e is #he basi% design ni#. Da#a deri&ed sing one se# of !a#erial %anno# be sed #o assis# in #he design of ano#her e&en if i# is onl" one of #he %o!ponen#s %o!prising #he arrange!en# #ha# has %hanged. The li!i#a#ions of #his !e#hod are #ha# i# needs a dr" and !e%hani%all" %lean srfa%e for a%hie&ing a drable bonded %onne%#ion be#ween pipe and la!ina#e. To a%hie&e #he reired dr" srfa%e, i# is ne%essar" #o plg #he lea on4line or depressrie #he line. The se%ond i!por#an# aspe%# of repair is srfa%e prepara#ion. Srfa%e prepara#ion a%#i&i#" in&ol&es re!o&al of loose debris and %orrosion prod%#s followed b" !e%hani%al abrasion. (or!all", ali#" of srfa%e prepara#ion shold be in %onfor!i#" wi#h S) / . For srfa%e prepara#ion sing gri#4blas#ing #e%hnie on li&e lines, all ne%essar" safe#" pre%a#ions shold be followed as per PD6 pro%edres. "!7
4e1el II Emergency 2e%ects- In0urious non leaing de%ects
These defe%#s are as des%ribed in se%#ion /./. The" ha&e a no!inal i!pa%# on #he prod%#i&i#" of #he pipeline de #o #he reire!en# for pressre red%#ion. +eferen%e is !ade #o SP42/5$ for possible repair op#ions and !e#hods for le&el4II e!ergen%" defe%#s. "!;
Repair organisation
The repair organisa#ion and %on#ingen%" plans for PD6 pipelines are gi&en in #he 0!ergen%" +esponse Do%!en#, Par#4III in #he following &ol!es:4 'ol!e45, Prod%#ion 6pera#ions, P+42== 4 Clase /.5.< 6il Pipeline Failre 4 Clase /.5.2 3as Pipeline Failre 'ol!e4-, Main 6il 1ine P+42=> 'ol!e4$, Ter!inal ? Tan Far! 6pera#ions, P+42=@ 'ol!e42-, 3o&ern!en# 3as S"s#e! Pipeline ? Ter!inals, P+42/-= 'ol!e42$, So#h 6!an 3as 1ine P+42/>$
Page 5 of >=
GU-379 Pipeline Emergency Repair Manual
.0 Emergenc !e"airs for +lass !einforced $lastic +!$3 $i"elines 3!#
General
3+P pipelines for PD6 ha&e been %ons#r%#ed af#er sa#isfa%#or" and rigoros alifi%a#ion #es#s ha&e been %arried o# on #he 3+P s"s#e!s. Fr#her ali#" %he%s are !ade b" %arr"ing o# &isal inspe%#ion and pressre #es#ing prior #o %o!!issioning of #he s"s#e!. Mos# of #he 3+P pipelines are of bried #"pe. 3+P pipeline s"s#e!s %an sffer opera#ional defe%#s, whi%h !a" be %a#as#rophi% in na#re. This !anal iden#ifies #he possible %a#as#rophi% defe%#s, %a#egorised as e!ergen%" defe%#s, and spe%ifies #he appropria#e repair !e#hods. 3!"
(cope
This par# of #he do%!en# defines #he e!ergen%" defe%#s and #he repair respe%#i&e reire!en#s for 3+P pipelines. The e!ergen%" repairs for o#her non4!e#alli% pipelines in%lding HDP0 s"s#e!s are e8%lded fro! #he s%ope. IS6 2-= 7par# 2 #o -9 and D0P 52.-.2.2<, 3+P Pipelines and Piping S"s#e!s 7)!end!en#s*Spple!en#s #o IS6 2-=9J for! #he basis for #his do%!en#. The defe%#s %onsidered are #hose #ha# %old be en%on#ered dring #he opera#ion of #he 3+P pipelines. Defe%#s de#e%#ed dring #he !anfa%#ring, ins#alla#ion, #es#ing and %o!!issioning s#ages are e8%lded fro! #his !anal. 3!3
&auses o% de%ects in an operating GRP pipeline system
The o%%rren%e of defe%#s in an opera#ing 3+P pipeline s"s#e! %an nor!all" be a##rib#ed #o ei#her one or a %o!bina#ion of #he following.
3!+
2
Third par#" in#erferen%e 7#he !os# %o!!on reason9
/
08%essi&e opera#ional loads*pse# %ondi#ions 7refer Se%#ion 5.- below9
2e%ects due to o1er pressurisation
The o&er pressrisa#ion of a 3+P pipeline s"s#e! de #o failre of #he o&er pressre pro#e%#ion s"s#e!s or e8%essi&e srge be"ond design li!i#s nor!all" leads #o weepage or rp#re of #he pipeline. If an" s%h si#a#ion o%%rs, i# is ad&ised #o repla%e #he %o!ple#e line or else fi#ness for prpose e&ala#ion shall be %arried o# as per !anfa%#rers re%o!!enda#ion. 3!,
2e%ect categorisation
The defe%# %a#egorisa#ion of 3+P Class4I pipelines is si!ilar #o #ha# of CS pipelines spe%ified in Se%#ion / of #his do%!en#, wi#h #he e8%ep#ion #ha# weeping defe%#s are in%lded in 1e&el42 e!ergen%" defe%#s.
Page 52 of >=
GU-379 Pipeline Emergency Repair Manual
eeping defe%#s : 4 This is #he !os# %o!!on #"pe of 1e&el4I defe%# in a 3+P pipeline s"s#e!. I# !ainl" %ons#i##es seepage, swea#ing or pene#ra#ion of #he liid #hrogh #he wall of #he pipeline. In weeping #here is no apparen# &isal indi%a#ion of a defe%# in #he 3+P !a#erial and !ainl" o%%rs de #o dis#rban%e in #he fibre !a#ri8. I# is diffi%l# #o iden#if" #he !inor weeping defe%#s in bried 3+P pipelines 7Minor weeping %an onl" be iden#ified dring h"dro#es#ing9. 3!.
Repair o% 4e1el-I Emergency 2e%ects
The lea de#e%#ion, defe%# assess!en# !e#hods and !ajor a%#i&i#ies following repor#ing of a pipeline lea are si!ilar #o #hose indi%a#ed for CS pipelines a# se%#ion /.$ of #his do%!en#. 3!.!#
(hut do5n and pressure reduction
The need for sh##ing down #he pipeline s"s#e! for #he prpose of %arr"ing o# repair or inspe%#ion shall be de%ided b" #he lo%al area e!ergen%" %oordina#or in %onsl#a#ion wi#h senior pipeline personnel based on #he #"pe of defe%# and #he possible %onseen%es. The repair op#ions for 3+P pipelines are nor!all" #he repla%e!en# of #he defe%#i&e se%#ion and #herefore, sh#down, depressrisa#ion and draining of #he s"s#e! is ne%essar". In %ase, weeping of a pipeline de #o o&er pressrisa#ion is iden#ified an i!!edia#e sh#down of #he pipeline !s# be ini#ia#ed. If #he pipeline has been sh# down, re4pressrisa#ion shold be done wi#h e8#re!e %a#ion, s#eadil" in%reasing #he pressre wi#ho# srges, whi%h %old &ibra#e #he pipeline and #he asso%ia#ed fi##ings leading #o in#egri#" proble!s. The s"s#e! pressre af#er %o!ple#ion of #he repair shall be de%ided b" #he engineer4 in4%harge, depending pon #he #"pe of repair and shall be re%orded in #he %lose o# repor#. Manfa%#rers ad&i%e !s# also be #aen in#o a%%on#. 3!.!"
Repair options
The preferred op#ion of repair is #o #ae #he pipeline o# of ser&i%e, de%o!!ission and #he repla%e #he defe%#i&e se%#ion wi#h pipe !ee#ing #he reire!en#s of #he %odes and s#andards. Sele%#ion of join#ing !e#hod for se%#ional repla%e!en# shall be go&erned b" design pressre of #he pipeline. If design pressre of #he pipeline is less #han or eal #o - barg, la!ina#ed join# shall be sed. Se%#ional repla%e!en#, in #he pipelines ha&ing design pressre !ore #han - barg, shall be %arried o# sing flanged join#s.
Page 5/ of >=
GU-379 Pipeline Emergency Repair Manual
The following repair op#ions are re%o!!ended depending pon #he #"pe of defe%#. 7+efer Table 59. a'le 3 - (election o% emergency repair options - GRP pipelines ype o% 2e%ect
emporary repair Permanent repair location location Minor lea in s#raigh# (il Se%#ional repla%e!en# O por#ion Major lea in s#raigh# (il Se%#ional repla%e!en# por#ion eep in s#raigh# (il Se%#ional repla%e!en# O por#ion +p#re (il Se%#ional repla%e!en# 1eas in join#s and (il +epla%e!en# of #he fi##ing*join# fi##ings 1eaage #hrogh road (il Se%#ional repla%e!en# and wadi %rossings O Minor leas or lo%alised weeping defe%#s %an be repaired b" o&er wrapping p #o - barg design pressre. 3!.!3
Repair acti1ity procedures
The a%#i&i#ies de#ailed below shall for! par# of #he o&erall repair wors. 3!.!3!# &utting o% the Pipeline
The se%#ion of #he pipeline #o be repla%ed shall be !ini!! 2!! 7$!! on ei#her side of defe%#9 !ore #han #he leng#h of #he defe%# The pipe se%#ion #o be %# shold be !ared and %arefll" se%#ioned. The %ross se%#ion shall be s#raigh# and perpendi%lar #o #he pipe a8is, as #he join# reliabili#" depends #o a large e8#en# on #he sareness of #he %#. Pipe p #o 2 !! no!inal dia!e#er shall be sare #o wi#hin 2.$ !! whils# %#s on larger dia!e#er pipes shall be sare #o wi#hin 5. !!. The %##ing of glass fibre reinfor%ed plas#i% pipes %an be done b" !eans of a ha%saw or -J grinding dis% for dia!e#ers p #o 2 !!. Pipes of larger dia!e#er shold be %# b" grinding wi#h a diagri# or %arbornd!4grinding dis%. )l#erna#i&e eip!en# sed for %##ing shall be sbje%# #o #he !anfa%#rers appro&al prior #o s#ar# of wor. 3!.!3!" &leaning o% the de%ect area
The srfa%e of affe%#ed area of #he pipeline shall be %leaned #o allow for repair, inspe%#ion e#%. The pipe se%#ion !s# be free fro! oil, grease and ds#. )dea#e %leaning is essen#ial a# #he join# where #he e8is#ing pipeline is #o be bonded #o a new spool pie%e. Ds# re!o&al shall be %arried o# sing a %lean dr" brsh, dr" rag or %o!pressed air #ha# is dr" and free fro! oil. )ll srfa%es #o be adhesi&e bonded shall be %leaned
Page 55 of >=
GU-379 Pipeline Emergency Repair Manual
sing a%e#one. The brsh or %lo#h #o be sed for %leaning shold be free fro! har!fl sbs#an%es. The %on#a%# srfa%e of #he e8is#ing pipeline #o be bonded shall be prepared in line wi#h join#ing pro%edre. Use of !e#al brshes or har!fl sol&en#s for %leaning of #hreaded join#s is no# ad&ised. 3!.!3!3 Emergency repair methods < GRE pipelines 3!.!3!3!# Repair o% leas in straight pipe section
The #"pe and na#re of #he defe%# shall di%#a#e #he repair pro%edre #o be followed. In %ase of !inor lea or lo%alised weeping de #o i!pa%# da!age is iden#ified in #he s#raigh# por#ion of #he pipeline, #hese defe%#s %an be repaired b" o&er wrapping, pro&ided #he design pressre of #he pipeline is less #han or eal #o - barg. In %ase, #he design pressre is - barg, se%#ional repla%e!en# shall be %arried o# for s%h leas. For !ajor lea*rp#re in s#raigh# se%#ion, se%#ional repla%e!en# shall be %arried o#. Pipeline se%#ion repla%e!en# in&ol&es %##ing o# of #he defe%#i&e por#ion and ins#alling a new spool pie%e of %o!pa#ible proper#ies #o #he e8is#ing pipeline. The sele%#ion of join#ing !e#hod depends on design pressre of #he pipeline. 1a!ina#ed join# shall be sed for joining #he new se%#ion wi#h e8is#ing pipeline p #o - barg design pressre. The alified pro%edre of la!ina#ed join# shall be sed for joining #he new se%#ion wi#h e8is#ing pipeline. The pipelines designed for !ore #han - barg pressre, are %ons#r%#ed sing #hreaded join#s, se%#ional repla%e!en# of s%h pipelines shall be %a rried o# sing flanged join#s as per Manfa%#rers repair pro%edres. +efer )ppendi8
For leas in fi##ings 7!inor*!ajor*rp#re*weep9, i# is re%o!!ended #o repla%e #he %o!ple#e fi##ing. +epla%e!en# of #he fi##ing in&ol&es #he sa!e pro%edres as spe%ified for s#raigh# se%#ions des%ribed in Se%#ion 5.=.5.5.2 3!.!3!3!3 Repair o% 0oint leas
+epair of leas #hrogh adhesi&e bonded, la!ina#ed, elas#o!eri% seal and #hreaded join#s ne%essi#a#es %##ing o# #he join#. ) pipe se%#ion %on#aining #he leaing join# shall be %# a# $ !! fro! #he leaing join# in bo#h ps#rea! and downs#rea! dire%#ions and a new pipe se%#ion shall be ins#alled. In %ase of flanged join#s, leas %an be %ased de #o #he wrong #"pe of gase# being fi##ed, a da!aged gase#, se of in%orre%# #ore for #igh#ening of #he flange bol#s, in%orre%# seen%e of #igh#ening of flange bol#s or ph"si%al da!age #o #he flange. For leas a##rib#ed #o gase#s, #he" shall be repla%ed b" #he %orre%# #"pe for #he appli%a#ion and #he flange bol#s #igh#ened #o #he !anfa%#rers re%o!!enda#ions.
Page 5- of >=
GU-379 Pipeline Emergency Repair Manual
3!.!3!+ Procedure %or sand padding and 'ac%illing o% the trench
2. S%reened sof# sand, free of ro% and foreign !a##er, shall be sed for sand padding. The !ini!! %o!pa%#ed dep#h of padding below #he pipe shall be 2$ !!. /. Hand sho&el and wooden hand4ra!!ing de&i%e shall be sed for #he pla%e!en# of sand nder #he pipe. 5. Sand shall be lowered in#o #he #ren%h wi#h a !e%hani%al sho&el and hand spread nifor!l" arond #he pipe. The dep#h of #he sand padding o&er #he #op of #he pipe shall be a# leas# 5 !!. Sand on #op of #he pipe shall be shaped #o #he na#ral angle of repose. -. S%reened e8%a&a#ed !a#erial fro! #he lo%a#ion shall be sed 7af#er #he re!o&al of an" ro% and bolders9 on #op of #he sand. In order no# #o da!age #he sand padding, #he ini#ial la"ers of final fill shall be %arefll" lowered in#o #he #ren%h fro! ea%h side b" !e%hani%al sho&el ensring #ha# #he ba%fill !a#erial is deposi#ed %arefll" #o a&oid dis#rbing #he sand padding. $. The !e%hani%al e8%a&a#or shall !ain#ain #he following minimum safe dis#an%es 7whi%h shall be %learl" !ared b" a line of bn#ing9 fro! #he edge of #he #ren%h: 4
+o%: dis#an%e fro! edge of #ren%h shall be 2. !e#re
4
Co!pa%#ed grond: dis#an%e fro! ba##ered edge of #ren%h shall be 2.$ !e#re
4
Sof# sand wi#h #ren%h sides ba##ered #o a !ini!! slope of /:2: dis#an%e shall be / !e#res.
=. )f#er %o!ple#ion of #he ini#ial ba%fill la"er, #he re!aining ba%fill shall be finished #o a le&el sligh#l" abo&e #he na#ral grade and shall be #horoghl" %o!pa%#ed b" !eans of a %o!pa%#ing &ibra#or. >. indrow shall be reins#a#ed, in%lding #he se%#ion sed for #e!porar" %rossings. here #he e8%a&a#ion %rosses wadis or di#%hes wi#h lined or o#herwise i!pro&ed srfa%es, #hese shall be reins#a#ed #o #heir original %on#or and %ondi#ion. +eferen%e shold also be !ade #o 0+D 5@422 and SP42/-> for de#ails on reins#a#e!en#. 3!.!3!, 2etailed &lose /ut Repair Report
The %on#en#s of %loseo# repor# for 3+P pipelines shall be si!ilar #o #ha# of CS pipeline repairs %loseo# repor# indi%a#ed a# se%#ion /.$.>.> of #his do%!en#.
Page 5$ of >=
GU-379 Pipeline Emergency Repair Manual
3!7
Emergency Repair Procedure Buali%ication
Se%#ional repla%e!en# is #he onl" possible repair !e#hod for res#oring #he long #re! in#egri#" of #he pipeline. The la!in#ed join# shall be sed for %onne%#ing #he new se%#ion wi#h e8is#ing pipe s"#e!s for #he pipelines ha&ing design pressre less #han - barg. Si!ilarl", se%#ional repla%e!en# shall be %arried o# sing flanged join#, if design pressre of #he pipeline is !ore #han - barg. The alified and appro&ed join#ing pro%edre shold be sed for se%#ional repla%e!en# in all %ases. For pro%edre alifi%a#ion, PD6 shall engage one of #he for appro&ed 3+P &endors for pro%re!en# and sper&ision rela#ed a%#i&i#ies for #he e!ergen%" repair of #he 3+P pipelines. The appro&ed &endor shall de&elop a de#ailed repair pro%edre in%lding %leaningW %##ing and join#ing of #he e8i#ing pipeline wi#h new pipe se%#ion. This pro%edre along wi#h #es#ing plan shall be sb!i##ed #o PD6 for re&iew and appro&al. The alifi%a#ion #es#s shall be %arried o# wi#h all PD6 appro&ed 3+P !anfa%#rer pipes wi#h a &iew #o &erif" #he %o!pa#abili#" of resin #o be sed for la!ina#ed join#s. To !ini!ie #he e!ergen%" !a#erial, one fi# for allJ philosoph" is adop#ed. I# !eans highes# ra#ing pipe for a no!inal dia!e#er shall be pro%red fro! one of #he appro&ed &endor and sa!e pipe shall be sed for se%#ional repla%e!en# for all ra#ing for #ha# no!inal dia!e#er. 3!;
Buality Programme during Repair
The repair wors shall be %ond%#ed in a%%ordan%e wi#h #he ali#" !anage!en# s"s#e! as reired for IS6 <. ) high le&el of inspe%#ion shall be !ain#ained for all wors #o ensre %o!plian%e wi#h #he reire!en#s of #he rele&an# spe%ifi%a#ions and pro%edres. )ll repair wor shall be %arried o# nder #he sper&ision of appro&ed e!ergen%" repair %on#ra%#or who shall be responsible for !ain#aining %o!prehensi&e re%ords of #he repair a%#i&i#ies. 3!9
Emergency Repair Cit
The repair %rews shall be eipped wi#h all si#able eip!en# as reired for #he pipeline being repaired and shall %arr" an adea#e range of fll" %o!pa#ible spare pipe and fi##ings. In addi#ion #he following #ools and %ons!ables shall be %arried: 2. Te!pera#re and rela#i&e h!idi#" !easring eip!en#s /. Measring #ape, sliding gage, pipe !arer 7pen9 5. Pipe sha&ers 7as spplied b" #he pipe !anfa%#rer9 -. in%hes or Pllers, Cargo la#%hing bel#s and slings $. 3rinders and 3rinding Diss =. Drilling !a%hine and Flapper wheels 7gri# -4=9
Page 5= of >=
GU-379 Pipeline Emergency Repair Manual
>. 0!er" Paper @. Sol&en Sol&en## %lean %leaner, er, %leani %leaning ng rags rags <. PP0 7glo 7glo&es &es,, e"e e"e pro#e%# pro#e%#ion ion,, ds# ds# !as9 !as9
Page 5> of >=
GU-379 Pipeline Emergency Repair Manual
4.0 Emergenc Emergenc !e"air !e"air of #ubsea #ubsea Carbon Carbon #teel $i"elines $i"elines +!#
General
The in#egri#" of sb4sea pipeline s"s#e!s is &er" i!por#an# for #he opera#ors for e%ono!i%al, opera#ional and en&iron!en#al reasons. 6n%e %o!!issioned, #he sb4sea pipelines !s# gi&e %on#inos ser&i%e wi#h !ini!! in#errp#ion. Howe&er, sb!arine pipelines generall" are opera#ed in a highl" %orrosi&e and ina%%essible en&iron!e en&iron!en#. n#. PD6 opera#es opera#es a few sb4sea sb4sea e8por# e8por# pipelines pipelines for loading loading %rde oil and handling whi#e oil refiner" prod%#s #o #aners a# M)F area. The #o#al leng#h of sb!erged se%#ion of #hese pipelines is appro8i!a#el" $!. These in%lde • • • •
5J SM2 0as# 4 %rde e8por# pipeline. 5J SM2 es# es# 4 %rde e8por# pipeline. -J SM/ SM/ 4 %rde e8por# pipeline. 2J Prod%# lines Shell !are# lines 7= nos SM*2*/*59.
The in#egri#" of %rde oil, prod%#4load prod%#4loading ing lines is highl" highl" i!por#an# i!por#an# fro! opera#ions opera#ions poin# of &iew. The %rde oil e8por# pipelines are !ainl" opera#ed nder gra&i#" flow %ond %ondi# i#io ions ns.. De De #o oper opera# a#io iona nall and and #an #aner er re reir ire! e!en en#s #s all all #he #he sb! sb!er erge ged d %rde*prod%# loading lines are %ri#i%al and #here is no spe%ifi% s#andb" line for %rde oil e8por#. )n" leas on #hese pipelines will ha&e a !ajor effe%# on #he !arine en&iron!en# and rep#a#ion wi#h longer4#er! effe%#s on loading opera#ionsW hen%e an" of #hese pipeline leas are reired #o be a##ended on e!ergen%" basis. This !anal iden#ifies #he possible %a#as#rophi% defe%#s 7le&elI defe%#s9 and spe%ifies #he appropria#e repair !e#hods for PD6 sb4sea pipelines. +!"
(cope
This par# of #he do%!en# de#ails #he possible e!ergen%" repair !e#hods for PD6 offshore loading lines. The defe%#s %onsidered are #hose #ha# %old be en%on#ered dring #he opera#ion of #he sb4sea pipelines. The #"pe of defe%#s, defe%# %lassifi%a#ion and %a#egorisa#ion of defe%#s, #he repair op#ions for sb4sea CS pipelines are si!ilar #o #ha# of bried onshore CS pipelines spe%ified in se%#ion /.. The addi#ional spe%ifi% reire!en#s for e!ergen%" repair of offshore se%#ions of loading lines are briefl" de#ailed in #his do%!en#. The sppor# fa%ili#ies reired for e!ergen%" repair of sb4sea pipelines, s%h as #e%hni%al #e%hni%al spe%ifi%a#ion spe%ifi%a#ion of reired fa%ili#ies on #he srfa%e sppor# sppor# &essel, di&ing di&ing e8per#ise reired for %arr"ing o# #he ne%essar" repair, spe%ifi% reire!en#s for nder wa#er %la!ping and h"perbari% welding e#%., are no# de#ailed in #his do%!en#.
Page 5@ of >=
GU-379 Pipeline Emergency Repair Manual
+!3
&auses o% o% 2e 2e%ects
The possible reasons for sb4sea pipeline defe%#s are 2. Thir Third d par par#" #" da!a da!age ge /. 08%essi 08%essi&e &e oper opera#i a#iona onall loads loads*err *errors ors 5. Corros Corrosion ion 7in#er 7in#ernal nal * e8#ern e8#ernal9 al9 -. Manfa Manfa%# %#rin ring g * %ons# %ons#r% r%#io #ion n defe%# defe%#ss +!+ +!+
4e1e 4e 1ell < I Emer Emerge genc ncy y 2e%e 2e%ect ctss
The !ajor a%#i&i#ies rela#ed #o 1e&el4I e!ergen%" repairs are %a#egorised in#o 2. 1ea ea de# de#e% e%#i #io on /. 1ea 1ea asses assess! s!en en## sr sr&e &e" " 5. De%ide #he repair repair op#ion op#ion based on da!age da!age assess!en# assess!en# sr&e" sr&e" -. Mobilia#io Mobilia#ion n of e!ergen%" e!ergen%" repair repair %rew, eip!en# eip!en# and %arr"o %arr"o# # #he repair wor wor (o#e: Poin#s 5 ? - ha&e ha&e been %o&ered in brief. brief.
+!+! !+!#
4ea 2ete 2etecction ion
I# is ne%essar" #o iden#if" #he lea lo%a#ion as soon as possible #o !ini!ie spill of h"dro%arbons and i!pa%# on #he en&iron!en#. The sb sea pipeline leas are di&ided in#o !inor leas and !ajor leas, whi%h is in line wi#h defe%# %a#egorisa#ion for onshore %arbon s#eel pipelines. The !inor !inor leas are !ainl" pinhole pinhole leas or %ra% leas. The pinhole pinhole lea is a s!all perfora#ion in #he pipe wall and is generall" #he resl# of ei#her %orrosion pi#s or weld defe% defe%#s #s or !a#e !a#eria riall defe% defe%#s #s or e8#e e8#ern rnal al da!a da!age ge.. ) s!all s!all pinh pinhol olee lea lea !a" !a" go nde#e%#ed for so!e #i!e n#il e&iden%e of oil poll#ion 7sigh#ed oil" sheen*la"ers in wa#er9 is obser&ed on #he wa#er srfa%e. The nsal dea#h of !arine life s%h as s!all fish e#%. in #he &i%ini#" of #he loading lines also indi%a#es sspe%#ed pipe lea. ) pinhole !a" o%%r below %orrosion s%ales*deposi#s or nder weigh# %oa#ing !aing #he de#e%#ion &er" diffi%l#. In #he %ase of a defini#e lea, #he da!age will be of s%h e8#en# #ha# pipeline %anno# re#ain re#ain #he line line pressr pressre. e. Pressr Pressree loss loss and en&iron en&iron!en !en#al #al poll#i poll#ion on are #he !ain %hara%#eris#i%s of !ajor pipeline leas. For iden#if"ing iden#if"ing #he sspe%#ed sspe%#ed lea, an e8perien%ed di&er shall ph"si%all" ph"si%all" inspe%# #he pipeline and sear%h for e&iden%e of a lea * sor%e of oil poll#ion. +e!o#e 6pera#ed 'essels 7+6'9 or !anned sb!ersibles %an also be engaged for lea de#e%#ion and repair a%#i&i#ies, in %ase #he safe#" of #he di&ers is in es#ion. Following iden#ifi%a#ion of lea lo%a#ion, #he defe%#i&e se%#ion shall be %learl" !ared sing bo"s. )f#er iden#if"ing #he lo%a#ion of #he lea, a preli!inar" inspe%#ion !s# be %arried o# as i%l" as possible #o iden#if" #he #"pe and e8#en# of #he da!age ss#ained #o #he
Page 5< of >=
GU-379 Pipeline Emergency Repair Manual
pipeline. Under wa#er &ideo re%ording fa%ili#ies gi&e an added ad&an#age for anal"sis of pipeline da!age b" e8per#s. ased on #he preli!inar" inspe%#ion resl#s a ali#a#i&e assess!en# shall be !ade #o assess #he %ondi#ion of #he line 7leaing * nsafe * badl" da!aged9 in rela#ion #o #he safe#" of fr#her di&ing opera#ions. Hen%e #he preli!inar" inspe%#ion !s# be nder#aen wi#h e8#re!e %a#ion. +!+!"
4ea Assessment (ur1ey
)f#er %onfir!a#ion of #he presen%e and lo%a#ion of #he lea, #he ne8# s#ep in&ol&es #he assess!en# and %a#egorisa#ion of #he defe%# in#o !inor, !ajor or rp#re and e8ploring #he possible reasons for #he lea. This assess!en# is essen#ial #o de%ide pon #he repair pro%edre #o be adop#ed and #he safe#" !easres #o be #aen dring #he repair. The lea assess!en# sr&e" in&ol&es e8posre and de#ail inspe%#ion of #he defe%#i&e pipe se%#ion #o assess and re%ord #he %ondi#ion for sbseen# in#erpre#a#ion. The e8#ernal %on%re#e %oa#ing in #he defe%#i&e area shall be re!o&ed sing high4pressre wa#er je##ing. The defe%#i&e pipe se%#ion shall be %leaned #o an a%%ep#able le&el, whi%h is dependen# on #"pe of repair !e#hod. 08posing #he pipe for repair !a" reire e8%a&a#ion of #he srronding area. Sin%e #hese #ass reire e8#ensi&e srfa%e sppor#, #he" %an be %onsidered #oge#her and a single !obilisa#ion shall be !ade sing one &essel. I# shold be no#ed, #ha# #he spe%ial eip!en# sed and #he di&ing e8per#ise reired for #hese a%#i&i#ies shall be of #he highes# ali#". Sin%e #he preli!inar" inspe%#ion reires a rapid !obilisa#ion of di&ing %rew wi#h !ini!! dela", #he ser&i%es of #he sppor# &essel and di&ing %rew, a&ailable nder #he e8is#ing reglar !arine sppor# %on#ra%# shall be #ilied. Pro&ision e8is#s wi#hin #his %on#ra%# #o %all off addi#ional spe%ialis# !anpower and eip!en# a# shor# no#i%e. +!+!3
(hutdo5n and Pressure Reduction
The reire!en# of pressre red%#ion and sh# down depends pon se&eri#" of #he da!age, i!pli%a#ions of leaage on #he en&iron!en# and repair !e#hod #o be sed. Te!porar" repair of pinhole leas sing proprie#ar" slee&es or %la!ps %an be e8e%#ed wi#ho# pressre red%#ion. In %ase of a !ajor lea or rp#re, pipeline sh#down is ne%essar", #o !ini!ie en&iron!en#al poll#ion and for %arr"ing o# per!anen# repair 7se%#ional repla%e!en#9 in a safe !anner. +!+!+
Repair options
The %o!pan" philosoph", appli%able repair !e#hod, go&erning rles and regla#ions di%#a#e #he repair s#ra#eg". Depending on #he e8#en# of #he da!age fond, #he repair !a" reire ins#alla#ion of a repair %la!p or repla%e!en# of defe%#i&e se%#ion of pipe #iliing %onne%#ors or %oplings. The sele%#ion of repair !e#hod shall be based on pressre %on#ain!en# reire!en#s and %orrosi&i#" of in#ernal and e8#ernal en&iron!en#.
Page - of >=
GU-379 Pipeline Emergency Repair Manual
Permanent Repairs
The preferred op#ion of per!anen# repair is #o de%o!!ission #he pipeline, %# #he defe%#i&e se%#ion and repla%e i# wi#h a new se%#ion. Howe&er, #his op#ion is seldo! e8er%ised de #o #he #i!e %ons#rain#, a&ailabili#" of resor%es and %os# in&ol&ed. For se%#ional repla%e!en#, !e%hani%al %onne%#ors shall be sed. The !ain ad&an#age of !e%hani%al %onne%#ors is #ha# #his !e#hod is fas# and nderwa#er 7h"perbari%9 welding %an be a&oided. The o#her per!anen# repair #e%hnies indi%a#ed for bried 7onshore9 CS pipelines are also appli%able for sb4sea pipelines. emporary Repairs
Plid%o Cla!p and slee&e or an" o#her si!ilar Co!pan" appro&ed brand slee&es are preferred for #e!porar" repair of sb4sea pipeline leas 7refer #o Table 2 Sele%#ion of e!ergen%" repair op#ions for CS pipelines9. The Plid%o Cla!p and slee&e has %la!ping srfa%es, whi%h grip #he o#side wall #o %on#er end4pll and a8ial s#resses. These #e!porar" repairs %an be a%%ep#ed as a per!anen# repair, sbje%#ed #o periodi% inspe%#ion of #hese slee&es following ins#alla#ion. In #he e&en# of pipeline rp#re, #he se%#ional repla%e!en# op#ion shall be sele%#ed. +!,
Resources
In order #o perfor! #he sb4sea inspe%#ion and lea repair a%#i&i#ies, an adea#e srfa%e &essel will be reired. The &essel shold ha&e following !ain fea#res. •
3ood seawor#hiness rela#ed #o i#s o&erall di!ensions and hll for!. ) #"pi%al fla# bo##o! barge for e!ergen%" repair of sb4sea pipelines shall be of 2$ #o /$ fee# long wi#h &alid %er#ifi%a#ion for hll, !a%hiner", safe#" eip!en# for offshore opera#ions. For shallow wa#er appli%a#ions ei#her a ;a%4p or shallow wa#er fla# bo##o! barge %an be sed.
•
The &essel de% %rane %apa%i#" !s# be in e8%ess of e8pe%#ed loads 7for lowering, lif#ing of pipe se%#ions, repair slee&es, %la!ps e#%.9. The reire!en# will depend pon #he #"pe of repair and sie of defe%#i&e pipeline. The %rane !s# be ra#ed for offshore se and !s# be eipped #o assis# di&er opera#ions down #o $ !e#ers wa#er dep#h.
•
3eneral %ons#r%#ion %apabili#ies shold in%lde nder wa#er welding and %##ing gear #oge#her wi#h worshop * repair fa%ili#ies. The &essel shold ha&e a well4#rained and in#egra#ed %rew fa!iliar wi#h #he wor and #he %ons#r%#ion, repair opera#ions.
•
Posi#ioning s"s#e!s #o allow #he &essel #o a%%ra#el" fi8 i#s posi#ion rela#i&e #o nown referen%es and #o #he pipeline on #he seabed.
•
Co!!ni%a#ions !s# be good and in preferen%e in%lde #ele8, as well as nor!al !arine side band 'HF*UHF and walie4#alie eip!en#.
Page -2 of >=
GU-379 Pipeline Emergency Repair Manual
hils# #he %o!pan" !ain#enan%e barge GFahal2 flfils !os# of #he reire!en#s abo&e, ss#ained opera#ions !a" reire #he ser&i%es of addi#ional spe%ialis# eip!en#. i#h a &iew #o #a%le an" e!ergen%" si#a#ions wi#h #he sb4sea loading lines a# M)F area, #he sor%es of reired resor%es for #a%ling an" e!ergen%" repair wor needs #o be iden#ified and #he rele&an# repair pro%edres shold be !ade a&ailable for read" referen%e.
.0
Emergenc #toc' %aterials ,!#
Philosophy
The following philosoph" has been adop#ed #o es#ablish #he an#i#ies of e!ergen%" s#o% !a#erial. For CS pipelines, all %lass4I pipelines shall be di&ided in#o differen# grops based on pipe dia!e#er and lo%a#ion of #he pipeline. Presen#l", e!ergen%" !a#erials are s#ored a# for lo%a#ions. These lo%a#ions are (i!r, Mar!l, Fahd and M)F. )ll %lass4I pipelines are reglarl" !oni#ored and inspe%#ed b" IP and UT. The inspe%#ion freen%" depends on #he presen# %ondi#ion of #he pipeline, e8pe%#ed %orrosion ra#e and ris asso%ia#ed wi#h #he pipeline. )ll iden#ified defe%#s, whi%h are #hrea#ening #he in#egri#" of #he pipeline, are repaired in a planned !anner and %han%es of an" #hird par#" da!age #o #he pipeline are !ini!al. Considering all #hese aspe%#s, #he probabili#" of leaage in a %lass4I pipeline is !ini!!, so i# is %on%lded #ha# e!ergen%" !a#erials shall be s#ored for one e&en# a# ea%h lo%a#ion for ea%h dia!e#er. )n e&en# in%ldes a pinhole lea, a !ajor lea and a rp#re. +eire!en# of an" addi#ional e!ergen%" !a#erial shall be dis%ssed wi#h PD6 on %ase #o %ase basis. The Plid%o Spli# Slee&es 7or si!ilar9 shall be pro%red for highes# ra#ing pipeline for ea%h dia!e#er. Howe&er, a&ailable Plid%o S!i#h Cla!p %an be sed for !inor leas if adja%en# area has sffi%ien# wall #hi%ness. In f#re, no Plid%o S!i#h Cla!p shall be pro%red. For se%#ional repla%e!en# in %arbon s#eel pipeline, i# is proposed #ha# 5 pipe join#s for ea%h dia!e#er a# e&er" lo%a#ion shall be s#o%ed fro! a&ailable pipe !a#erial. The wall #hi%ness and grade of pipe !a#erial shall be sele%#ed in s%h a !anner #ha# sele%#ed pipes %an be sed for se%#ional repla%e!en# in all pipelines of sa!e dia!e#er a# #ha# lo%a#ion wi#ho# an" %o!pa#ibili#" isse. For 3+0 pipelines, i# is de%ided #ha# se%#ional repla%e!en# shall be %arried o# sing la!ina#ed join#s p #o - barg and flanged spool pie%es shall be sed for se%#ional repla%e!en# for lines opera#ing a# !ore #han - barg. Minor leas shall be repaired b" o&er wrapping p #o a design pressre of - barg. ,!"
4oaction and Buantities o% Emergency (toc Materials
The 0!ergen%" S#o% Ma#erials are lo%a#ed in following s#ores. • (i!r •
Page -/ of >=
Mar!l MPS
GU-379 Pipeline Emergency Repair Manual •
Fahd M1PS
•
Mina )l Fahal
•
(i!r
The lis# of re%o!!ended e!ergen%" !a#erials is a##a%hed as )ppendi8 @.
5.0
#afet .!#
(a%ety reuirements during repair o% emergency de%ects
I# is #he responsibili#" of #he engineer4in4%harge #o ensre #he repair opera#ions are %arried o# in a %on#rolled and safe !anner. The engineer4in4%harge shall prepare a spe%ifi% a%#ion plan indi%a#ing #he da!age iden#ified, #he repair !e#hod #o be sed in line wi#h #his !anal. )ll pre%a#ions and safe#" !easres #o be #aen shall also be spe%ified in #he plan. The plan shall %on#ain #he following !ini!! infor!a#ion: 4 o o o
o
o o
o o
(a!e and #elephone n!ber of #he PD6 %o!!ander on #he s%ene. 1o%a#ion of defe%# Defe%# %a#egoria#ion*#"pe as per Se%#ion /./ for CS and Se%#ion 5.$ for 3+P and SP42/5$ Pipeline ser&i%e and de#ails 7flid #ranspor#ed, !a#erial grade, 6D, opera#ing pressre, wall #hi%ness9 +epair !e#hod 7repair op#ion, #ools reired, PS9 +epair !a#erial reired 7lis#, lo%a#ion and responsible par#" for arranging and #ranspor#ing #he repair !a#erial9 De#ails of %on#ra%#or who will %arr" o# #he repair 7na!e*#elephone9 Safe#" pre%a#ions, in%lding a&ailabili#" of adea#e fire pro#e%#ion eip!en#.
The repair opera#ions shold pro%eed onl" af#er #he reisi#e safe#" pre%a#ions for dealing wi#h an" e!ergen%" in%lding fire, e8plosion or spill ha&e been dl" adop#ed. The re%o!!ended safe#" !easres shall be based on #he #"pe of defe%# and #he le&el of lea as o#lined in SP42>$ and HS0 <>425. For raising an e!ergen%" alar! #he PD6 e!ergen%" response do%!en#s shall be followed. These do%!en#s o#line #he %on#ingen%" plans and safe#" !easres #o be adop#ed. )ll ne%essar" no#ifi%a#ion and repor#ing shall be done as per HS0 <>42 and as des%ribed in Se%#ion /.$.>.> abo&e. The personnel in&ol&ed in #he repair shall be pro&ided wi#h adea#e personnel pro#e%#ion eip!en# in line wi#h SP42/5- and S+D4S42 and shall wor #o #he Gdd" 7non4woring alone9 s"s#e! as o#lined in P+42@2. For welding on li&e lines, #he po#en#ial for fire is grea#er and #herefore #he wearing of fire resis#an# %lo#hing is essen#ial. In %ases of repairs #o a leaing pipeline, a haard assess!en# !s# be done i!!edia#el" and a worsi#e safe#" plan prod%ed. ) haard one shold be es#ablished b" de#er!ining #he a!on# of h"dro%arbon &apors in #he area. Infor!a#ion %on#ained in #he !a#erial da#a shee# for #he prod%# shold be %onsl#ed #o de#er!ine #he &ola#ili#" and #o8i%i#" %hara%#eris#i%. )n area assess!en# shall e8plore #he following !ini!! aspe%#s: 2. The fla!!abili#" le&el in #he area shold be %he%ed wi#h a %o!bs#ible gas de#e%#or. )#!ospheres abo&e 2N of #he lower e8plosi&e li!i# 71019 shall be
Page -5 of >=
GU-379 Pipeline Emergency Repair Manual
de%lared haardos and a%%ess shold be res#ri%#ed. Those abo&e $N 101 shall no# be en#ered. /. To8i%i#" #es#ing shold be !ade wi#h dire%# reading ins#r!en#s #ha# in%lde %olori!e#ri% #bes. This will de#er!ine #he #"pe of #he pro#e%#i&e eip!en# reired for all personnel woring in #he area. 5. If #he repair is #o be done in a %onfined spa%e s%h as a #ren%h, #he o8"gen le&el !s# be %he%ed and !oni#ored. -.
The fla!!able haard one !s# be de!ar%a#ed #o prohibi# !o&e!en# of eip!en# and o#her igni#ion sor%es in#o #he one.
6#her essen#ial safe#" !easres #ha# shall be followed in%lde:4 2. If #he haard area e8#ends in#o pbli% areas, all ne%essar" warning signs and res#ri%#ed a%%ess !s# be p# in pla%e. /. The lea si#e shold be barri%aded and !ared #o pre&en# #he possibili#" of a%%iden#s or injries. 5. 0le%#ri%al ear#hing bonds !s# be pro&ided de #o #he possibili#" of an ele%#ri%al po#en#ial on #he pipeline. -. efore s#ar# of ho# wor, an" h"dro%arbon sa#ra#ed ear#h shold be re!o&ed. $. The e8%a&a#ion and i#s srronding area shold be #es#ed and %on#inosl" !oni#ored wi#h %o!bs#ible gas de#e%#ors or o8"gen !oni#ors or bo#h #o ensre #he a#!osphere re!ains safe. )dea#e &en#ila#ion is essen#ial #hrogho# #he wor dra#ion. In addi#ion, #he following safe#" !easres are spe%ifi%all" appli%able for 3+P pipeline repair wors :4 2. Under no %ir%!s#an%es shold brning eip!en# be sed for 3+P repair wors /. Spe%ial pre%a#ions shall be #aen when woring wi#h resins, %ring agen#s, and %a#al"s#s whi%h %an prod%e irri#a#ion when allowed #o %o!e in#o %on#a%# wi#h #he e"es or sin. )dea#e personnel pro#e%#ion !s# be worn e.g. fa%e !ass, safe#" glasses, rbber glo&es and barrier %rea!s. 5. )n" a%%iden#all" %on#a!ina#ed sin area shall be #horoghl" washed wi#h soap and wa#er. -. Spe%ial pre%a#ions shall be #aen #o pre&en# inhala#ion of #he glass fibre ds#. $. )ll redndan# %o!ponen#s shall be %orre%#l" disposed. .!"
Accidental releases
0&er" effor# shall be !ade #o %on#ain an" spill or a%%iden#al release, red%e #he %on#a!ina#ed area and #o di&er# #he oil awa" fro! sensi#i&e areas s%h as wadis, &illages, fa%ili#ies and sor%es of igni#ion. In %ases of spills #he !e#hods and pro%edres o#lined in P+4 2@-, P+42@<, SP4 2$ and SP42> shall be followed. ) spill shold be di&er#ed awa" fro! sensi#i&e areas where possible b" %##ing drainage %hannels fro! #he lea si#e #o a spe%iall" dg pi# or a bnded %olle%#ion poin#
Page -- of >=
GU-379 Pipeline Emergency Repair Manual
a# leas# $! awa" fro! #he area so #he oil %an be %olle%#ed in a safe and %on#rolled !anner. If ne%essar", addi#ional pi#s or bnded areas shold be %ons#r%#ed #o #ae an" o&erflow. Par#i%lar a##en#ion shall be #aen #o ensre #ha# #he oil does no# flow in#o a falaj s"s#e! as #his %old allow #he oil #o #ra&el a %onsiderable dis#an%e and %on#a!ina#e popla#ed*agri%l#ral areas.
Page -$ of >=
GU-379 Pipeline Emergency Repair Manual
6.0
!eferences If no re&ision or isse da#e is !en#ioned referen%e shall be !ade #o #he la#es# re&ision in for%e a# #he #i!e of isse of #his Manal P2/ Engineering Re%erence 2ocuments
0+D 5@422
3idelines for 08%a&a#ion and oring arond 1i&e Pipelines
P2/ (peci%ications
SP42$ SP42= SP42> SP42< SP422/ SP42>$ SP422=> SP422>= SP422>> SP42/@ SP42/2 SP42/22 SP42/5SP42/5$ SP42/-=
0!issions #o )#!osphere HS0 spe%ifi%a#ion 4 )eos 0fflen#s Spe%ifi%a#ion for )%%iden#al +eleases #o 1and and a#er as#e Manage!en# Si#e Prepara#ion, )bandon!en# and +es#ora#ion Spe%ifi%a#ion for Fire and 08plosion +is Manage!en# Spe%ifi%a#ion for elding on Pressrised Pipes 7)!end!en#s* Spple!en#s #o D0P 5.2.=.59 (on4Des#r%#i&e 08a!ina#ion 7)!end!en#*Spple!en# #o )SM0 '9 elding of Class I Pipelines 7)!end!en#s*Spple!en#s #o )PI 22-9 Pipeline Cons#r%#ion Spe%ifi%a#ion Pipeline 6pera#ions and Main#enan%e Pipeline 0ngineering Heal#h, Safe#" and 0n&iron!en# Spe%ifi%a#ion 7PP09 D0P 52.-.=.2/4PD6 Pipeline +epairs 7)!end!en#s*Spple!en#s #o )SM0 52.- and 52.@9 Spe%ifi%a#ion for Pain#ing and Coa#ing of 6il and 3as Prod%#ion Fa%ili#ies
P2/ Procedures
P+4222 P+42= P+42== P+42=> P+42=@ P+42>2 P+42>5 P+42>P+42>= P+42@2 P+42@/ P+42@P+42@< P+422-= P+42/-= P+42/>$
Page -= of >=
Pipeline +e!edial ors HS0 Manage!en# Pro%edre X Co!!ni%a#ing ? +epor#ing 0!ergen%" +esponse Do%!en# Se%#ion /II, Con#ingen%" Plan, 'ol. III Prod%#ion 6pera#ion 0!ergen%" +esponse Do%!en# 0!ergen%" +esponse Do%!en# Flow 1ine Sspension*)bandon!en# 3as Freeing, Prging and 1ea Tes#ing of Pro%ess 0ip!en# Flshing Flow 1ines Isola#ion of Pro%ess 0ip!en#s The Gdd" S"s#e! Pro%edre Pipeline Pigging Pro%edre Spills Clean4p and Si#e +es#ora#ion Pro%edre Spillage +epor#ing Pro%edre Flow 1ine Cold C##ing Pro%edre 0!ergen%" +esponse Do%!en# 0!ergen%" +esponse Do%!en#
GU-379 Pipeline Emergency Repair Manual
P+42/>= P+42$=
S#d Pro%edre Aalifi%a#ion +e%ord for elding on #o Pressrised Pipes Pipeline Ho# Tap Manage!en# Pro%edre
P2/ Guidelines
3U4/>5
Per!i# #o or S"s#e!
P2/ @(E (tandards
HS0 <>42 HS0 <>425 S+D4S42 S+D4S45
In%iden# (o#ifi%a#ion, In&es#iga#ion, +epor#ing and Follow p F0+M Fa%ili#" Plan 3ideline S#andard for +espira#or" Pro#e%#i&e 0ip!en#s S#andards and 3idan%e for Personnel H"drogen Slphide Moni#ors
P2/ Policy
P145
PD6 0!ergen%" +esponse Poli%"
2EP
52.5@.=.2 52.-.5.5 52.-.5.52 52.-.-.5@ 52.-.=.22
Ho#4Tapping on pipelines, Piping and 0ip!en# 1ine Pipe for se in 6il and 3as 6pera#ions Under (on4sor Condi#ion 1ine Pipe for se in 6il and 3as 6pera#ions Under Sor Condi#ion H"dros#a#i% Pressre Tes#ing of (ew Pipelines Pipeline 1ea De#e%#ion
International (tandards
)SM0 52.- Pipeline Transpor#a#ion S"s#e!s for 1iid H"dro%arbons and 6#her 1iids )SM0 52.@ 3as Trans!ission Pipelines )PI +P 22> Pipeline Main#enan%e elding Pra%#i%es )PI +P // +epairing Crde 6il, 1iefied Pe#role! 3as, and Prod%# Pipelines )PI +P //2 Safe Ho# Tapping Pra%#i%es in #he Pe#role! ? Pe#ro%he!i%al Inds#ries )PI S#d. 22- elding of Pipelines and +ela#ed Fa%ili#ies )PI $1 Spe%ifi%a#ion for 1ine Pipe Re%erences speci%ic to GRP pipelines
D0P 52.-.2.2<
3+P Pipelines and Piping S"s#e!s ))!end!en#s* Spple!en# #o IS6 2-= 9 S >2$<:2<@< Design and Cons#r%#ion of 3lass +einfor%ed Plas#i%s 73+P9 piping s"s#e!s for indi&idal plan#s or si#es )PI 2$1+ 1ow Pressre Fiberglass 1ine Pipe )PI 2$H+ Spe%ifi%a#ion for High Pressre Fibre 3lass 1ine Pipe SP42/-> Cons#r%#ion of Pipeline S"s#e!s in (on4Me#alli% Ma#erials IS6 2-= De% // :Par# 2 #o -: Pe#role! and (a#ral 3as Inds#ries4 3+P Piping
Page -> of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-#8 Mechanical methods to 'e used in installation o% slee1es
Repair sleeve
Pipe
&ug and bolt method
Hydraulic jack Hi-yield chain link
Wood skid
Repair sleeve halves with side strips shown Pipe Wood skid
#tandard method
Page -@ of >=
Chain clam" method
GU-379 Pipeline Emergency Repair Manual
AppendiD-"8 Plidco (plit = (lee1e
Studs & nuts in position
Test ports
End thrust studs
End sealing mechanism
Page -< of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-38 Plidco (mith = &lamp
orce-screw with cone
!lamp
"raw-#olt
Page $ of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-+8 Plidco >eld = &ap
Page $2 of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-,8 FiDing arrangement %or Plidco >eld = End
Page $/ of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-.8 Plidco Flange = Repair Ring
Page $5 of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-78 Plidco Flange < Repair = (plit (lee1e
Page $- of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-; 8 4ist o% Emergency Materials )#. Pages*
Page $$ of >=
GU-379 Pipeline Emergency Repair Manual
AppendiD-9 8 Manu%acturer Instructions
Page $= of >=
GU-379 Pipeline Emergency Repair Manual
$&I)CO C&A%$ 7 !I+ I#TA&&ATIO I#T!8CTIO# (AFE &@E&C 4I( • •
•
•
+ead and follow #hese ins#r%#ions %arefll". Do no# e8%eed #he !a8i!! end res#rain# indi%a#ed on #he label of #he Plid%o Cla!p E +ing. ) Plid%o Cla!p E +ing is designed for a spe%ifi%, longi#dinal and res#rain# in ni#s of for%e. 'erif" #he !a8i!! end res#rain# indi%a#ed on #he label is sffi%ien# #o resis# #he %o!bina#ion of h"dros#a#i%, d"na!i%, e8#ernal and #her!al ind%ed for%es. Do no# e8%eed #he !a8i!! #e!pera#re indi%a#ed on #he label of #he Plid%o Cla!p E +ing. The !a8i!! #e!pera#re indi%a#ed on #he label refers onl" #o #he sele%#ion of an allowable s#ress sed in #he design of #he Plid%o Cla!p E +ing. I# does no# i!pl" #he Plid%o Cla!p E +ing is %apable of resis#ing #her!al for%es asso%ia#ed wi#h raising #he #e!pera#re of #he pipeline #o #he !a8i!! #e!pera#re indi%a#ed on #he label. Please refer #o design end res#rain#J des%ribed earlier. If ne%essar", please %onsl# Plid%o Depar#!en# 2 for fr#her de#ail. If #he pipeline has been sh# down, repressring shold be done wi#h e8#re!e %a#ion. +e4pressring shold be a%%o!plished slowl" and s#eadil" wi#ho# srges, whi%h %old &ibra#e #he pipeline and fi##ing. Inds#r" %odes and s#andards are a good sor%e of infor!a#ion on #his sbje%#. Do no# e8%eed #he !a8i!! end res#rain# indi%a#ed on #he label as des%ribed earlier. Personnel shold no# be allowed near #he ins#alla#ion n#il #he Plid%o Cla!p E +ing has been pro&en. &4AMP = RIG &/MP/E(
Page $> of >=
GU-379 Pipeline Emergency Repair Manual
PIPE PREPARAI/
2. +e!o&e all %oa#ings, rs# and s%ale fro! #he pipe srfa%e where #he Plid%o Cla!p E+ing will %on#a%# #he pipe. /. Sr&e" #he o#side of #he pipe #o %onfir! a %ir%lar %ross se%#ion, par#i%larl" in #he area of #he %la!ping se%#ion. This area shold be a s!oo#h %r&ed srfa%e wi#ho# inden#a#ions of fla# spo#s #ha# %old ad&ersel" affe%# proper gripping. 5. ) ring gage shold be sed for sb!erged pipelines where &isibili#" is li!i#ed. Plid%o has a&ailable ring gages #ha# %an a%%ra#el" sr&e" #he %ross se%#ional shape of #he pipe. -. The bol#ing for%e genera#ed when asse!bling #he #wo hal&es is %apable of shaping !inor o#4of4rond pipe. Ma8i!! allowable o&ali#" is appro8i!a#el" $N, depending on #he pipe wall #hi%ness. Fla# spo#s are &er" diffi%l# #o reshape and bol#ing for%e shold no# be relied on #o %orre%# fla##ened or inden#ed areas. $. Clean and lbri%a#e all Plid%o Cla!p E +ing. S#d bol#s and n#s. Pro&e free and eas" n# rnning prior #o ins#alla#ion. I(A44AI/
Careless handling %an da!age Cla!p E +ing. 1if#ing de&i%es s%h as %hains, %ables or lif# #r% fors shold no# %on#a%# #he %la!ping se%#ions. 2. )sse!ble #he Plid%o Cla!p E +ing loosel" on #he pipe, %en#ered o&er #he repair fi##ing, !aing %er#ain #he "ellow pain#ed ends are !a#%hed. There shold be appro8i!a#el" #hree 759 in%hes be#ween #he Plid%o Cla!p E +ing and #he repair fi##ing. See Cla!p E +ing %o!ponen#s. /. i#h #he #ie s#d bol# lgs in align!en#, inser# #he #ie s#d bol#. Hand #igh#en a n# on ea%h side of #he lgs. 5. )ll %la!ping s#d bol#s and n#s shold be nifor!l" #ored as indi%a#ed in #he Plid%o Tore Char# #he bes# resl#s are ob#ained b" !ain#aining an eal gap be#ween #he sidebars while #igh#ening The s#d bol#s. The sidebars will be gapped appro8i!a#el" Y #o in%h. -. The #ie s#d bol# n#s need onl" be sng. ) high pre4s#ress on #he #ie s#d bol#s is ndesirable. $. To %o!ple#e asse!bl", #he %la!ping s#d bol#s shold be re%he%ed a# #he re%o!!ended #ore. )n in%rease in #ore on one s#d bol# %an %ase a de%rease in #ore on neighboring s#d bol#s. FIE42 E(IG
The Plid%o Cla!p E +ing is %apable of being field #es#ed p #o 2 #i!es i#s !a8i!! end res#rained indi%a#ed on #he label of #he Plid%o Cla!p E +ing. The %o!bina#ion of
Page $@ of >=
GU-379 Pipeline Emergency Repair Manual
h"dros#a#i%, d"na!i%, e8#ernal and #her!al ind%ed for%ed an#i%ipa#ed dring #es#ing !s# be %onsidered. (/RAGE
Plid%o Cla!p E +ing shold be s#ored in a dr" en&iron!en# #o pre&en# an" npain#ed srfa%es rs#ing. P4I2&/ /RBUE &@AR (o!inal dia!e#er of s#d bol#s 7 in%hes9
ren%h 6pening a%ross fla#s
Cla!ping S#dbol# Tore 'alesO .@ Cf F#4lbs
.2$ Cf (!
f#4lbs
(!
$/,$ psi pre4s#ress $*@22 [442 >*@< 2@ 242*@@ 242*-44@ 245*@@ 242*/44@ 24$*@@ 245*-44@ 24>*@@ /@ /42*-@ /42*/44@
<$ 22@ 2= 2=/ /= /@ /$< 5/@ --= 5@$ -< ==$=2 >2< <>$ >@/ 2@ 25=@ 2$$ 25=@ 2@$$ 25@/ 2@ /--2 2>$@ /5/ 52/2 ///= /@ 5<=< />$@ 5=55 -> 55= ---=/$ -@/= =-2/ @=<===@@@= 2/-@ ->,$ psi pre4s#ress /45*-@ -42*$<-> @=2>@> 2-=/@ 5@ -4$*@ >@2= 2$<@ 2-/2@ 2@ 542*-@ $ <<== 25$22@2> /-=5< 542*/44@ $45*@ 2/->@ 2=2 //><5<@ 545*-@ $45*2$5@ /@$= /@2- 5@2$> -@ =42*@ 2@=<< /$5$$ 5-/=/ -=-= 5>,$ psi pre4s#ress -42*-@ =42*/ 2>>5$ /-$ 5/$- --2/5 -42*/44@ =4>*@ /2@/ /@$@= 5@>/5 $/$@ -45*-@ >42*/-@// 55=$< -$=-5 =2@<2 $@ >4$*@ /@<@5 5<5/ $55->/55$42*-@ @ 55$@$ -$$5< =2@=@5@@> $42*/44@ @45*@ 5@=-> $/-$ >2/-$ <==< $45*-@ @45*--2<$ $<< @2$/< 22$$= =@ <42*@ $/-< =@25< >=2 2/$>@5 Tore &ales shown in #he #able represen# #wo differen# %oeffi%ien#s of fri%#ion 7Cf9W .@ and .2$. hen Cf eals .@, i# is ass!ed #he s#ds and n#s are %lean, free rnning, free of ob&ios flaws and lbri%a#ed wi#h a high grade graphi#e4oil #hread lbri%an#. hen Cf eals .2$, i# is ass!ed #he s#ds and n#s are %lean, free rnning, free of ob&ios flaws and lbri%a#ed wi#h a ligh# weigh# Ma%hine oil. The #ore &ales are safe !ini!!s and represen# appro8i!a#el" #he bol# pre4s#ress &ales lis#ed in #he #able.
Page $< of >=
242*2= 242*24>*2= 24$*@ 2425*2= / /45*2= /45*@ /4<*2= /45*/42$*2= 542*@ 542*/ 54>*@
> 2/ 2 /@-2$>= >>> 22< 2/<= 2=-5 /55 /->@ 5$= -<2-
GU-379 Pipeline Emergency Repair Manual
$&I)CO ,E&) 7 E)# I#TA&&ATIO I#T!8CTIO# (AFE &@E&C 4I( • • •
+ead and follow #hese ins#r%#ions %arefll". e absol#el" %er#ain #ha# #he %orre%# seal !a#erial has been sele%#ed for #he in#ended se. De#er!ine #he #"pe of join# #ha# #he Plid%o eld E 0nds %opling is e8pe%#ed #o %onne%#. See 7a9 and 7b9 below and de#er!ine #he appropria#e ra#ing fro! #he ra#ings lis#ed on #he label of #he Plid%o eld E0nds %opling. 7a9 Pipe (o# an%hored ) join# in whi%h #he pipe ends %old !o&e when sbje%#ed #o in#ernal or e8#ernal for%es, s%h as in#ernal pressre, #e!pera#re e8pansion and %on#ra%#ion, nderwa#er %rren#s, grond !o&e!en# or an" %o!bina#ion #hereof. The assigned Plid%o eld E 0nds Pipe (o# )n%hored ra#ing %onsiders onl" #he end for%e %rea#ed b" #he in#ernal pressre. I# does no# %onsider an" addi#ional e8#ernal for%es s%h as #e!pera#re e8pansion and %on#ra%#ion, nderwa#er %rren#s, grond !o&e!en# or an" %o!bina#ion #hereof. These addi#ional e8#ernal for%es !s# be de#er!ined. If an" of #hese for%es %anno# be res#rained b" %s#o!er pro&en #e%hnies, a Plid%o Cla!p E +ing shold be sed. 7b9 )n%hored pipe ) join# in whi%h #he pipe ends wold no# !o&e when sbje%#ed #o #hese sa!e for%es. Plid%o eld E 0nds )n%hored pipe ra#ing is #he !a8i!! pressre a# whi%h #he pipeline %an be opera#ed. I# ass!es #ha# #he pipeline is si#abl" )n%hored b" welding, b" #he se of an appropria#el" ra#ed Plid%o Cla!p E +ing or b" o#her %s#o!er pro&en #e%hnies.
•
6bser&e #he pressre and #e!pera#re ra#ings on #he label of #he Plid%o eld E 0nds %opling. Do no# e8%eed #he !a8i!! appropria#e pressre indi%a#ed on #he ni#. Minimum Pipe >all hicness For Plidco >eld = Ends ominal Pipe (i?e )inches * 2 / / 5 = @ 2 2/ 22= ? larger
Page = of >=
>all hicness )inches * ./ ./2@ ./>= ./5> ./5> ./@ .5// .5=$ .-< .-5@ .$
GU-379 Pipeline Emergency Repair Manual • •
•
•
Pipe wall #hi%ness less #han #hose lis#ed !a" be pshed inward b" #he for%e of #he %la!p s%rews. ) Plid%o Cla!p E +ing shold be %onsidered whene&er wall #hi%ness is less #han #hose lis#ed. ) Plid%o Cla!p E +ing shold also be %onsidered where high e8#ernal for%es 7s%h as nderwa#er Crren#s or #her!al %on#ra%#ions9 are an#i%ipa#ed, e&en if #he pipe has an adea#e wall #hi%ness. Pipelines shold be %arefll" blo%ed a# elbows and bends #o pre&en# pllo#s %ased b" in#ernal and e8#ernal for%esW or a Plid%o Cla!p E +ing shold be sed. Pipeline shold be e&enl" sppor#ed before re4pressring. Follow appli%able 52 %odes dring re4pressring. If #he Plid%o eld E 0nds %opling is welded or a si#able Plid%o Cla!pE +ing is sed, i# %an be %onsidered an an%hored join#. PIPE PREPARAI/
2. The pipe srfa%e in #he area of #he repair shold be %lean, free of %oa#ing and brrs and lbri%a#ed #o pre&en# abrasion #o #he seal. /. For badl" !isaligned or o# of rond pipe, i# is helpfl grind a pilo# be&el wi#h a generos #aper on #he pipe. This wold be eli!ina#e #he ris of da!age #o #he seal while slipping #he Plid%o eld E 0nds %opling o&er #he end of #he pipe 7See Figre 29
I(A44AI/
The seal %an be da!aged b" %areless handling. 1if#ing de&i%es s%h as %hains, %ables or lif# #r%s fors shold no# %on#a%# #he seal. Failre #o do so %an resl# in #he seal being da!aged or plled fro! i#s groo&es. 2. Measre and re%ord di!ension DJ as shown in Figre 5. This will be needed la#er if #he Plid%o eld E 0nds is welded #o #he pipe. /. Coa# all e8posed srfa%es of #he seal !a#erial wi#h a lbri%an#. The following %har# indi%a#es #he lbri%an#s #ha# are re%o!!ended for #he &arios seal !a#erials. I# !s# be de#er!ine #ha# #he lbri%an# is %o!pa#ible wi#h #he prod%# in #he pipeline. na4(
Page =2 of >=
), , C
//$ \F
GU-379 Pipeline Emergency Repair Manual
'i#on Sili%one (eoprene )flas Teflon Be&lar Pe#role! based lbri%an# ) Sili%one based lbri%an# 3l"%erin based lbri%an# C
), , C C , C ), , C ), , C ), , C
/$ \F -$ \F /$ \F /$ \F $ \F >$ \F
5. Slide #he pipe in#o #he Plid%o elds E 0nds %opling %o!ple#el". Mar on #he pipe one4half #he Plid%o eld E 0nds %oplings leng#h fro! #he !iddle of gap 7re%o!!ended gap no# #o e8%eed [ in%h9. Slide #he eld E 0nds %opling ba% #o #he !ar #o di&ide #he %opling eall" o&er #he join#. 7See Figre /9.
-. Cla!p s%rews ha&e %ase hardened %p poin#s whi%h are sed #o se%re #he %opling #o #he pipe. The shans are !ild s#eel and fll" weldable. Cla!p s%rews shold be #igh#ened e&enl", !ain#aining an eal spa%e be#ween #he pipe and #he %opling sing #he re%o!!ended #ore &ales. Cla!p s%rews are designed for #he assigned Plid%o eld E 0nds (o# an%hored ra#ing whi%h %onsiders onl" #he end for%e %rea#ed b" #he in#ernal pressre. Cla!p s%rews do no# %onsider an" addi#ional e8#ernal for%es or s#resses i!posed on #he pipeline. $. )%%ra#e %la!p s%rew #ore &ales are &er" i!por#an# when #he Plid%o eld E 0nds %opling is sed on a pipeline join# #ha# is (6T )(CH6+0D. Do no# e8%eed #he Pipe (o# )n%hored +a#ing lis#ed on #he label of #he Plid%o eld E 0nds n#il sbseen# welding has been %o!ple#ed.
Page =/ of >=
GU-379 Pipeline Emergency Repair Manual
=. Che% all %la!p s%rews #o !ae %er#ain ea%h has re%ei&ed a# leas# #he !ini!! #ore spe%ified in %har# below. Cp poin# Cla!p S%rews $*@422 [42
Mini!! Tore f#4lbf 2 2$
(! 25= /-
>. Thrs# s%rews a%#i&a#e #he seals. The" are !ade of !ild %arbon s#eel and are fll" weldable. The" shold be #igh#ened gradall" and nifor!l" arond #he %ir%!feren%e. Firs#, sng all #he #hrs# s%rews fir!l". Then ad&an%e ea%h #hrs# s%rew abo# 2*@ of a #rn before pro%eedings #o an adja%en# #hrs# s%rew. I# will be ne%essar" #o !ae !an" %ir%i#s arond #he %opling before %o!ple#ing #he #hrs# s%rew #ore opera#ion. Use re%o!!ended #ore &ales in #he %har# below. Thrs# S%rews 5*@42= 425 $*@422
Tore +ange f#4lbf /4/$ 54- >4@
(! /@45-24$$ <$42<
@. ) final #ore range, shown in #he %har# abo&e, will be adea#e #o %o!ple#e #he asse!bl". <. +epressring af#er #he repair shold be done wi#h e8#re!e %a#ionW slowl" and s#eadil" wi#ho# srges, whi%h %old &ibra#e #he pipeline and fi##ing. Inds#r" %odes and s#andards are a good sor%e of infor!a#ion on #his sbje%#. 6pera#ing pressre !s# no# e8%eed #he !a8i!! appropria#e Pipe )n%hored or Pipe (o# )n%hored +a#ing. Personnel shold no# be allowed near #he ins#alla#ion n#il #he seal has been pro&en. FIE42 >E42IG I(RU&I/(
Pipeline shold be fll and nderflow. Use absol#el" dr" ele%#rodes, whi%h are of eal or grea#er #ensile s#reng#h #han #he pipe. Carefll" %on#rol #he sie and shape of #he %ir%!feren#ial fille# weld. The weld is reired #o an%hor #he join# and gi&e longi#dinal s#abili#" #o #he pipeline. The sie of #he fille# weld shold be a# leas# 2.- #i!es #he wall #hi%ness of #he pipe. This ass!es a 2. join# effi%ien%". There !a" be need #o sele%# a differen# join# effi%ien%" based on le&el of inspe%#ion or "or %o!pan"s welding poli%". S#ri&e for a %on%a&e fa%ed fille# weld wi#h s#rea!lined blending in#o bo#h !e!bersW a&oid no#%hes and nder%#s. The s!oo#her and !ore s#rea!lined #he weld, #he grea#er #he resis#an%e #o fa#ige failre. The wors# Possible shape wold be a hea&" reinfor%ed %on&e8 weld wi#h an nder%#. I!proper weld shape %an lead #o rapid fa#ige failre, whi%h %an %ase leaage, rp#re or e8plosion wi#h a##endan# serios %onseen%es.
Page =5 of >=
GU-379 Pipeline Emergency Repair Manual
elders and weld pro%edres shold be alified in a%%ordan%e wi#h )PI s#andard 22-, elding of Pipelines and +ela#ed Fa%ili#iesJ or +P 22>, +e%o!!ended Pipeline Main#enan%e elding Pra%#i%esJ la#es# edi#ion. )PI 22- and 22> ha&e eas" #o follow dire%#ions for pro%edre alifi%a#ion. Plid%o en%orage #he se of low h"drogen ele%#rodes 704KK2@9 be%ase of #heir high resis#an%e #o !ois#re pi%4p and h"drogen %ra%ing. Shielded !e#al ar% welding 7S)9 filler !e#als lis#ed in )PI 22- and 22> in%lde #he %elllose %oa#ed ele%#rodes 704KK2 series9 whi%h are of#en preferred be%ase of #he e8%ellen# downhill welding %hara%#eris#i%s. There are a%%ep#able filler !e#al, pro&ided #he" are pro&en b" pro%edre alifi%a#ion. I# is &er" i!por#an# #ha# #he field welding pro%edre %losel" follow #he essen#ial &ariables of #he alified pro%edre so #ha# #he ali#" of #he field weld is represen#ed b" #he ph"si%al #es#s perfor!ed on #he pro%edre alifi%a#ion #es# spe%i!en. Di!ension DJ as !easred dring #he ini#ial Ins#alla#ion, !a" now be sed #o !ar off lo%a#ions )J and J as shown in Figre 5. These lo%a#ions are #he sa!e dis#an%e fro! #he weld as #he seal lo%a#ion CJ. To pre&en# da!age #o #he seals, !oni#or #he hea# genera#ed b" welding or prehea#ing, par#i%larl" a# lo%a#ion )J and J, b" sing #e!pera#re %ra"ons or probe #her!o!e#ers. If #he hea# genera#ed approa%hes #he #e!pera#re li!i# of #he seal !a#erial, whi%h is indi%a#ed on #he label and in #he seal lbri%a#ion %har#, welding shold be dis%on#ined or seen%ed #o ano#her par# of #he fi##ing so #ha# #he affe%#ed area has a %han%e #o %ool. >E42IG (EBUE&E
2. Ca#ion shold be obser&ed so #ha# welding or pre hea#ing does no# o&erhea# #he seals. Seen%e #he welding so #ha# #he hea# is no# %on%en#ra#ed in one area. /. Thrs# S%rews shold be %# or brned off flsh. S#ar# wi#h #he fille# weld #o #he pipe arond %ir%!feren%e and in%lde seal welding #he #hrs# s%rews. 7See Figre 59. 5. C# or brn off %la!p S%rews appro8i!a#el" 5*2=J abo&e #he o#side srfa%e of #he %opling and seal weld. 6ne %la!p s%rew near #he #op !a" be re!o&ed #o ser&e as a &en# while welding and also as a final #es# poin# for leaage. 7See Figre 59
Page =- of >=
GU-379 Pipeline Emergency Repair Manual
FIE42 E(IG
The Plid%o eld E0nds %opling %an be field #es#ed p #o 2 #i!es #he appropria#e pipe )n%hored or Pipe (o# )n%hored + a#ing. (/RAGE I(RU&I/(
Plid%o eld E0nds %opling shold be s#ored in a dr" en&iron!en# #o pre&en# #he npain#ed srfa%es fro! rs#ing. S#orage #e!pera#res shold no# e8%eed 2/ $F 7-< \C9. Co&er wi#h a dar pol"e#h"lene #o eep #he dire%# sn ligh# fro! #he seals. I# is bes# #o e8%lde %on#a!ina#ion, ligh#, oone and radia#ion. I!properl" s#ored Plid%o eld E 0nds %oplings %an %ase #he gase# !a#erial #o be%o!e %ra%ed and bri##le and lose i#s abili#" #o seal.
Page =$ of >=
GU-379 Pipeline Emergency Repair Manual
$&I)CO #$&IT 7 #&EE9E I#TA&&ATIO I#T!8CTIO# (AFE &@E&C 4I( • •
•
• •
+ead and follow #hese ins#r%#ions %arefll". The Plid%o Spli# E Slee&e shold ne&er be sed #o %ople pipe nless sffi%ien# end res#rain# is pro&ided s%h as wi#h #he Plid%o Cla!p E +ing. The Plid%o Spli# ESlee&e has no end res#rain# in i#s nwelded %ondi#ion, and if so #ilied %old resl# in e8plosion, fire, dea#h, personal injr", proper#" da!age and*or har! #o en&iron!en#. 6bser&e woring pressre and #e!pera#re on #he label of #he Plid%o Spli# E Slee&e. Do no# e8%eed !a8i!! woring pressre or #e!pera#re as indi%a#ed on #he ni#. hen repairing an a%#i&e lea, e8#re!e %are !s# be #aen #o gard personnel. Se&ere injr" or dea#h %old resl#. If #he pipeline has been sh# down, repressring #o #es# #he seals af#er repair shold be done wi#h e8#re!e %a#ion. +e4pressring shold be a%%o!plished slowl" and s#eadil" wi#ho# srges, whi%h %old &ibra#e #he pipeline and fi##ing. Inds#r" %odes and s#andards are a good sor%e of infor!a#ion on #his sbje%#. Do no# e8%eed #he !a8i!! woring pressre. Personnel shold no# be allowed near #he repair n#il #he seal has been pro&en. PIPE PREPARAI/
2. +e!o&e all %oa#ings, rs# and s%ale fro! #he pipe srfa%e where #he %ir%!feren#ial seals of #he Plid%o Spli# ESlee&e will %on#a%# #he pipe. /. The seal %an #olera#e !inor srfa%e irreglari#ies p #o ± 2*5/J. I(A44AI/
The seals and 3irder +ings %an be da!aged b" %areless handling. 1if#ing de&i%es s%h as %hains, %ables or lif# #r% fors shold no# %on#a%# #he seals or girder +ings. Con#a%# %an resl# #he seals being plled fro! #heir groo&es. 7See Figre 29 2. Coa# all e8posed srfa%es of #he seals wi#h a lbri%an#. The following %har# indi%a#es #he lbri%an#s #ha# are re%o!!ended for &arios seals. Pe#role! based lbri%an# : Sili%one based lbri%an# : 3l"%erine based lbri%an# : na4 ( 'i#on Sili%one 0#h"lene Prop"lene (eoprene )flas Teflon Be&lar
) C ), , C ), , C C , C , C ), , C ), , C ), , C
The %s#o!er !s# de#er!ine if #he lbri%an# is %o!pa#ible wi#h #he prod%# in #he pipeline.
Page == of >=
GU-379 Pipeline Emergency Repair Manual
/. Clean and lbri%a#e all s#d bol#s and n#s, and pro&e free and eas" n# rnning prior #o ins#alla#ion. 5. )sse!ble #he Plid%o Spli#E Slee&e arond #he pipe !aing sre #he "ellow pain#ed ends are !a#%hed and #ha# #he fi##ing is %en#ered o&er #he lea and da!aged area as !%h as possible. So!e#i!es i# is helpfl #o loosel" asse!ble
Page => of >=
GU-379 Pipeline Emergency Repair Manual
#he Plid%o Spli# E Slee&e #o one side of #he lea, #hen reposi#ion i# %en#ered o&er #he lea. -. )ll s#d bol#s and n#s shold be nifor!l" #ored as indi%a#ed b" #he Plid%o Spli# ESlee&e Tore Char#. The bes# resl#s are ob#ained b" !ain#aining an eal gap all arond be#ween side bars while #igh#ening #he s#dbol#s. $. To %o!ple#e asse!bl", )11 s#d bol#s shold be re%he%ed a# #he re%o!!ended #ore. Beep in !ind, #he sligh#es# in%rease in #ore on one s#dbol# %an %ase a de%rease in #ore on neighboring s#dbol#s. =. The side bars are grapped appro8i!a#el" 2*@J when #he Plid%o Spli# ESlee&e is fll" #igh#ened. FIE42 >E42IG I(RU&I/(
If #he pipeline has been sh#down, repressring #o #es# #he seals af#er repair shold be done wi#h e8#re!e %a#ion. +epressring shold be a%%o!plished slowl" and s#eadil" wi#ho# srges whi%h %old &ibra#e #he pipeline and fi##ing. Inds#r" %odes and s#andards are a good sor%e of infor!a#ion on #his sbje%#. Do no# e8%eed !a8i!! woring pressre. Personnel shold no# be allowed near #he repair n#il #he seal has been pro&en. Use absol#el" dr" ele%#rodes whi%h are eal or grea#er #ensile s#reng#h #han #he pipe. Carefll" %on#rol #he sie and shape of #he %ir%!feren#ial fille# welds. The sie of #he fille# welds shold be a# leas# 2.- #i!es #he wall #hi%ness of #he pipe. This ass!es a 2. join# effi%ien%". S#ri&e for a %on%a&e fille# weld, wi#h s#rea!lined blending in#o bo#h !e!bersW a&oid no#%hes and nder%#s. I!proper weld shape %an lead #o rapid fa#ige failre whi%h %an %ase leaage, rp#re or e8plosion wi#h a##endan# serios %onseen%es. elders and weld pro%edres shold be alified in a%%ordan%e wi#h )PI S#andard 22- elding of Pipelines and rela#ed Fa%ili#ies,J or +P 22> +e%o!!ended Pipeline Main#enan%e elding Pra%#i%es,J la#es# edi#ion. )PI 22- and 22> ha&e eas"4#o4follow dire%#ions for pro%edre alifi%a#ion. Plid%o en%orage #he se of low h"drogen ele%#rodes 7 04KK2@9 be%ase of #heir high resis#an%e #o !ois#re pi%4p and h"drogen %ra%ing. The" are also #he preferred ele%#rode for seals welding #he s#d bol#s and n#s. Shielded !e#al ar% welding 7SM)9 filler !e#als lis#ed in )PI 22- and 22> in%lde #he %elllose %oa#ed ele%#rodes 704KK29 series whi%h are of#en preferred be%ase of #he e8%ellen# downhill welding %hara%#eris#i%s. These are a%%ep#able filler, !e#als, pro&ided #he" are pro&en b" pro%edre alifi%a#ion. Celllose %oa#ed ele%#rodes are no# re%o!!ended for seal welding #he s#d bol#s and n#s. I# is &er" i!por#an# #ha# #he field welding pro%edre %losel" follow #he essen#ial &ariables of #he alified pro%edre so #ha# #he ali#" of #he field weld is represen#ed b" #he ph"si%al #es#s perfor!ed on #he pro%edre alifi%a#ion spe%i!en. Moni#or #he hea# genera#ed b" welding or prehea#ing, par#i%larl" near #he area of #he seals, b" sing #e!pera#re %ra"ons or probe #her!o!e#er. If #he hea# genera#ed approa%hes #he #e!pera#re li!i# of #he seal !a#erial whi%h is indi%a#ed on #he label,
Page =@ of >=
GU-379 Pipeline Emergency Repair Manual
welding shold be dis%on#ined or seen%ed #o ano#her par# of #he fi##ing so #ha# #he affe%#ed area has a %han%e #o %ool. Seal welding #he grade 4> s#dbol#s of a Plid%o Spli# E Slee&e is #he !os# diffi%l# phase of field welding. The" are !ade of )ISI -2- s#eel wi#h a high %arbon ei&alen%e. " sing low h"drogen ele%#rodes 7 04KK2@9 and a !odes# prehea# 7 do no# e8%eed / degree F9, #he proble! of h"drogen %ra%ing and pin holes %an be red%ed. The prehea# will dr" o# na" !ois#re, oil da!pness or #hread lbri%an# #ha# !a" be presen# in #he seal weld area. >E42IG (EBUE&E
2. Ca#ion shold be obser&ed so #ha# welding does no# o&erhea# #he seals. Seen%e #he welding so #ha# #he hea# is no# %on%en#ra#ed in one area. I# will be ne%essar" #o re4#ore #he s#dbol#s and n#s periodi%all" dring field welding be%ase weld %on#ra%#ion %ases #he! #o loosen. /. Fille#4weld ends #o pipe 5. Seal4weld side openings -. +e4#ore s#d bol#s and n#s $. Seal4weld arond bo##o!s of n#s #o side bars. =. Seal weld n#s #o s#dbol#s.
FIE42 E(IG @E P4I2&/ (P4I= (4EE:E
The Plid%o Spli# E Slee&e %an be field #es#ed p #o 2 #i!es i#s design woring pressre. (/RAGE I(RU&I/(
Plid%o Spli# E Slee&es shold be s#ored in a dr" en&iron!en# #o pre&en# #he npain#ed srfa%es fro! rs#ing. S#orage #e!pera#res shold no# e8%eed 2/ $ 7-< \C9. Co&er wi#h a dar pol"e#h"lene #o eep #he dire%# sn ligh# fro! #he seals. I# is bes# #o e8%lde %on#a!ina#ion, ligh#, oone and radia#ion. I!properl" s#ored Plid%o Spli# E Slee&es %an %ase #he seal !a#erial #o be%o!e %ra%ed and bri##le and lose i#s abili#" #o seal. P4I2&/ (P4I = (4EE:E /RBUE &@AR (o!inal
Page =< of >=
ren%h
Cla!ping S#dbol# 7Tore 'alesO9
GU-379 Pipeline Emergency Repair Manual
dia!e#er of s#d bol#s 7 in%hes9 $*@22 [442 >*@< 2@ 242*@@ 242*-@ 245*@@ 242*/@ 24$*@@ 245*-@ 24>*@@ /@ /42*-44@ /42*/@
6pening a%ross fla#s
242*2= 242*24>*2= 24$*@ 2425*2= / /45*2= /45*@ /4<*2= /45*/42$*2= 542*@ 542*/ 54>*@
.@ Cf f#4lbs
55 $> <2 25$ 2<> />5> -@$ =2> >@/ <=@ 22@ 2=<$ /5-
f#4lbs
.2$ Cf (!
/$, psi pre4s#ress -$ $= >> <@ 2/5 2$= 2@5 /55 /=> 5-/ 5>/ -@ $/ =$2 =$@ @$> @5> 2<= 2= 25<2525 2>5 2= /22= //<@ 5$5 52>5 -/52
>= 255 /2/ 52= -==$2 @@5 22=/ 2-@= 2@< /5-= /@=< -2- $>5>
(!
/5 psi pre4s#ress /45*-44@ -42*/@@ 5<$//>@5 5@ -4$*@ 5>@$ $255 =@@$ <55= 542*-44@ $ -@/= =$-$ @><< 22<52 542*/@ $45*@ =-5 @2<225> 2-<=> 545*-@ $45*>--> 2<< 25=/= 2@->> -@ =42*@ <$$ 2//>@ 2=$< //-<> 2@,@ psi pre4s#ress -42*-@ =42*/ @@<2 2/>$ 2=525 //2/ -42*/@ =4>*@ 2$=< 2-552 2<-25 /=5/-45*-@ >42*2/--2=@>//@@/ 52/@ $@ >4$*@ 2-$5 2<>5 /=>-5 5=/=5 $42*-@ @ 2=@5> //@5 522-/$$ $42*/@ @45*@ 2<5>$ /=/>/ 5$>2> -@-55 $45*-@ @45*//2$= 5--@>5 $$-/$ =@ <42*@ /$2<2 5-2= -=$=5$< Tore &ales shown in #he #able represen# #wo differen# %oeffi%ien#s of fri%#ion 7Cf9W .@ and .2$. hen Cf eals .@, i# is ass!ed #he s#ds and n#s are %lean, free rnning, free of ob&ios flaws and lbri%a#ed wi#h a high grade graphi#e4oil #hread lbri%an#. hen Cf eals .2$, i# is ass!ed #he s#ds and n#s are %lean, free rnning, free of ob&ios flaws and lbri%a#ed wi#h a ligh# weigh# !a%hine oil. The #ore &ales are safe !ini!!s and represen# appro8i!a#el" #he bol# pre4s#ress &ales lis#ed in #he #able.
Page > of >=
GU-379 Pipeline Emergency Repair Manual
$&I)CO F&A+E 7 !E$AI!-!I+ I#TA&&ATIO I#T!8CTIO# (AFE &@E&C 4I( • • • • •
• •
+ead and follow #hese ins#r%#ions %arefll". The Plid%o Flange E+epair +ing !a" be sed wi#h #he pipeline in opera#ion or sh#down. e absol#el" %er#ain #ha# #he %orre%# seal !a#erial has been sele%#ed for #he in#ended se. The Plid%o Flange E +epair +ing shold ne&er be sed #o %ople flanges. (o end res#rain# is pro&ided wi#h #he Plid%o Flange E +epair +ing. 6bser&e woring pressre and #e!pera#re on #he label of #he Plid%o Flange E +epair +ing. Do no# e8%eed #he !a8i!! woring pressre or #e!pera#re as indi%a#ed on #he ni#. 'erif" #he #igh#ness of all #hreaded &en#s and %onne%#ions. hen ins#alling a Plid%o Flange E +epair +ing on non4leaing flanges sb!erged nder wa#er 7or an" liid9, Plid%o s#rongl" re%o!!ends #he &en#s be open dring ins#alla#ion #o pre&en# e8%essi&e pressre bildp wi#hin #he fi##ing de #o h"drali% lo%. PREPARAI/
2. +e!o&e all %oa#ings, rs# and s%ale fro! #he flange srfa%e where #he %ir%!feren#ial seals of #he Plid%o Flange E +epair +ing will %on#a%# #he flange. The seal %an #olera#e !inor srfa%e irreglari#ies p #o ± 2*5/J. /. Mae sre #he gap be#ween #he flanges is %lear #o #he flange s#d bol#s. 5. Clean and lbri%a#e all Plid%o Flange E +epair +ing s#d and n#s. Pro&e free and eas" n# rnning prior #o ins#alla#ion. -. Coa# all e8posed srfa%es of #he sealing !a#erial wi#h lbri%an#. The following %har# indi%a#es #he lbri%an#s #ha# are re%o!!ended and #he !a8i!! #e!pera#re li!i# for &arios seals. The %s#o!er !s# de#er!ine if #he lbri%an# is %o!pa#ible wi#h #he prod%# in #he pipeline. Pe#role! based lbri%an# Sili%one based lbri%an# 3l"%erine based lbri%an# na4 ( 'i#on Sili%one (eoprene )flas Teflon Be&lar
: : :
) C ), , C ), , C C , C ), , C ), , C ), , C
//$ degree F /$ degree F -$ degree F /$ degree F /$ degree F $ degree F >$ degree F
I(A44AI/
The seal and 3irder +ings %an be da!aged b" %areless handling. 1if#ing de&i%es s%h as %hains, %ables or lif# #r% fors shold no# %on#a%# #he seals or girder +ings. Con#a%# %an resl# #he seals being plled fro! #heir groo&es.
Page >2 of >=
GU-379 Pipeline Emergency Repair Manual
2.
/. 5. -. $.
)sse!ble #he Plid%o Flange E +epair +ing arond #he flanges !aing %er#ain #he fi##ing is %en#ered o&er #he gap be#ween #he flanges and #ha# #he "ellow pain#ed ends are !a#%hing. )sse!ble #he s#ds and n#s hand #igh#. )ll s#d bol#s and n#s shold be nifor!l" #ored as indi%a#ed b" #he Plid%o Tore Char#. The #ore &ales shown appl" p #o and in%lding > degree F. The bes# resl#s are ob#ained b" !ain#aining an eal gap be#ween #he side bars while #igh#ening #he bol#s. To %o!ple#e asse!bl", #he s#d bol#s shold be re%he%ed a# #he re%o!!ended #ore. The side bars are gapped appro8i!a#el" 2*@J #o 5*2=J when #he Plid%o Flange E +epair +ing is fll" #igh#ened. P4I2&/ /RBUE &@AR
(o!inal dia!e#er of s#d bol#s 7 in%hes9
ren%h 6pening a%ross fla#s
Cla!ping S#dbol# Tore 'alesO
$*@22 [442 >*@< 244@ 242*@@ 242*-44@ 245*@@ 242*/44@ 24$*@@ 245*-44@ 24>*@44@ /44@ /42*-44@ /42*/44@
242*2= 242*24>*2= 24$*@ 2425*2= / /45*2= /45*@ /42*/ /45*/42$*2= 542*@ 542*/ 54>*@
55 $> <2 25$ 2<> />5> -@$ =2> >@/ <=@ 22@ 2=<$ /5-
/45*-44@ 544@ 542*-44@ 542*/44@
-42*-4$*@ $ $45*@
525 -22$/-= =$=@
.@ Cf f#4lbs
(! f#4lbs /$, psi pre4s#ress -$ $= >> <@ 2/5 2$= 2@5 /55 /=> 5-/ 5>/ -@ $/ =$2 =$@ @$> @5> 2<= 2= 25<2525 2>5 2= /22= //<@ 5$5 52>5 -/52 -/-$$>< >22@<=
$=>@ >-@<$=22<<>
.2$ Cf (! >= 255 /2/ 52= -==$2 @@5 22=/ 2-@= 2@< /5-= /@=< -2- $>5> >=<< 22-@ 2/<=< 2=/=@
Tore &ales shown in #he #able represen# #wo differen# %oeffi%ien#s of fri%#ion 7Cf9W .@ and .2$. hen Cf eals .@, i# is ass!ed #he s#ds and n#s are %lean, free rnning, free of ob&ios flaws and lbri%a#ed wi#h a high grade graphi#e4oil #hread lbri%an#. hen Cf eals .2$, i# is ass!ed #he s#ds and n#s are %lean, free rnning, free of ob&ios flaws and lbri%a#ed wi#h a ligh# weigh# Ma%hine oil. The #ore &ales are safe !ini!!s and represen# appro8i!a#el" #he bol# pre4s#ress &ales lis#ed in #he #able.
(EA4A IE&I/
6ne or !ore sealan# %o%s are spplied wi#h ea%h Plid%o Flange E +epair +ing. These !a" be sed for &en#ing b" re!o&ing #he b##on heads while #he %o%s are %losed. 6pen #he sealan# %o%s #o allow prod%# #o &en# while bol#ing, if desired. Close %o%s and re4ins#all b##on heads. e sre %o%s are open before inje%#ing sealan#.
Page >/ of >=
GU-379 Pipeline Emergency Repair Manual
Conne%# a sealan# gn #o fi##ing and inje%# sealan# #hrogh all b##on head fi##ings a li##le a# a #i!e n#il #he Plid%o Flange E +epair +ing is fll. 1eaage will sall" slow down #o a whisper #hrogh #he flange bol#s. Inje%#ion shold pro%eed slowl", inje%#ing a li##le a# a #i!e #hrogh #he b##on head neares# #he lea n#il #o#al seal off is a##ained. So!e#i!es a #o#al seal off is ins#an#, in whi%h %ase all sealan# inje%#ion shold be s#opped. 6bser&e for a while #o see if a lea de&elops. 3enerall" #he leaage will red%e #o whispers and #he ra#e of sealan# inje%#ion shold be red%ed propor#iona#el". ) good rle #o re!e!ber is when #he ra#e of leaage de%reases #he ra#e of sealan# inje%#ion shold be de%reased. 6f#en, dring #he final phases of seal off, #here is an i!plse #o p!p sealan# ealosl". This does no# alwa"s gi&e desirable resl#s. The %onfined sealan#, ha&ing no where #o go, is for%ed o# a pre&iosl" sealed bol# hole or gase#. 6%%asionall" #he srfa%es #o be sealed are nreasonabl" gapped or badl" %orroded. These !a" reire sealan#s whi%h are &er" %oarse and whi%h %anno# be p!ped #hrogh #he res#ri%#ion of s#andard b##on heads. These sealan#s %an be inje%#ed dire%#l" #hrogh #he sealan# %o%. (/RAGE I(RU&I/(
Plid%o Flange E +epair4+ing shold be s#ored in a dr" en&iron!en# #o pre&en# #he npain#ed srfa%es fro! rs#ing. S#orage #e!pera#res shold no# e8%eed 2/ $ 7-< \C9. Co&er wi#h a dar pol"e#h"lene #o eep #he dire%# sn ligh# fro! #he seals. I# is bes# #o e8%lde %on#a!ina#ion, ligh# oone and radia#ion. I!properl" s#ored Plid%o Spli# E Slee&es %an %ase #he seal !a#erial #o be%o!e %ra%ed and bri##le and lose i#s abili#" #o seal.
Page >5 of >=
GU-379 Pipeline Emergency Repair Manual
GRE REPAIR PR/&U2RE( 8 (MI@ FIER Introduction
The repair of S#ar line pipe pri!aril" in&ol&es #he ins#alla#ion of a flange se#. 1ower pressre prod%#s offer al#erna#i&e !e#hods #o flange se#s, b# are li!i#ed in pressre ra#ing. The following are #he repair !e#hods and #he li!i#a#ions of ea%h: &AUI/8 Mae sre #ha# #he line is properl" &en#ed prior #o s#ar#ing repair wor. Flange (et
Pri!aril" for )PI @rd prod%#s ] $ PSI. Se# in%ldes / flanges, n#s, bol#s, washers and gase#s. Depending on #he lo%a#ion of #he lea, a de%ision !s# be !ade as #o how #o re%onne%# #he line wi#h #he flanges. The se of a !ini!! leng#h nipple !a" be reired #o ins#all #he flange se#.
• • • •
/PI/(8
2. Mae se of #he nda!aged pipe b" re#hreading #he ends in #he field allowing for #he flange se#. +eferen%e #he field #hread ra#ing %har# /.@./ of #he +e%o!!ended Ins#alla#ion Pra%#i%es for #he proper #hreading !e#hod #o !ain#ain #he s"s#e! pressre ra#ing. /. If e8#ra pipe is a&ailable, repla%e #he da!aged join# wi#h a new join# whi%h %an be shor#ened in #he field #o !ae roo! for #he flange se# and a !ini!! leng#h nipple. The pressre ra#ing of #he s"s#e! %an be !ain#ained sing #his s"s#e! on an" )PI @rd prod%#. 5. Pr%hase a prefabri%a#ed repair join# designed #o !e%hani%all" repla%e a fll 7<.2- M#rs. no!inal9 join# of pipe and !ae roo! for a flange se#. This !e#hod wors for )PI @rd. /PI/ /E PR/&E2URE8 Consider #he leng#h of #he da!age. If #he wid#h of a se# of flanges will repair • #he area, a nipple 7long enogh #o repair #he da!aged area9 and a %opling will be reired along wi#h #he flange se#. C# #he da!aged area of #he pipe sing a ha%saw, #aing in#o %onsidera#ion • #he #o#al la"ing leng#h of #he par#s needed #o !ae #he repair. Depending on how long #he da!aged area is, an e8#ra join# of pipe !a" be • reired. +e#hread bo#h sare %# ends or bell 8 !ale adap#ers. •
Page >- of >=
GU-379 Pipeline Emergency Repair Manual
Figure 1
/PI/ >/ PR/&E2URE8 C# #he da!aged join# sing a ha%saw. • +e!o&e bo#h re!aining ends sing 7/9 S#ar !e#al fri%#ion wren%hes. • +epla%e wi#h a new join# of pipe. • Shor#en #he join# as reired #o fi# #he flange se# and a !ini!! leng#h nipple. • Do no# %# #he pipe in #he pipe bod", onl" in #he pse# area. • Field #hread #he pipe. • Ins#all #he flange se#. •
Figure 2
/PI/ @REE PR/&E2URE8 C# #he da!aged join# of pipe sing a ha%saw. • +e!o&e bo#h re!aining ends sing 7/9 S#ar !e#al fri%#ion wren%hes. • +epla%e #he da!aged join# wi#h #he spe%ial leng#h repair join#s. • Ins#all #he flange se#. •
Figure
Page >$ of >=