IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT
COMMITTEE OF TESTING LABORATORIES rd
IEC 60950 3 ED. (1999-04) TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING SUBCONTRACTING (revised 2006-06-01) 2006 -06-01) R=Required by Lab S=May be subcontracted Clause 1.6.2 1.7.13 2.1.1.1
Measurement/testing Input current Durability Protection in operator access areas
Testing / measuring equipment / material needed Amp-meter suitable for the current and waveform Petroleum spirit/water/piece of cloth. Test finger (joint /rigid 30N, fig. 2A) Test pin (fig. 2B/ 4mm/3mm/15 mm long)
2.3.1 2.3.3 .3.3 2.3. 2.3.5 5
Limits of TNV circuits Sepa Separa rattion ion fro from m haz haza ardo rdous vo voltag ltage e Test Test for for ope opera rati ting ng volt voltag ages es gene genera rate ted d ext exter erna nall lly y
Resistor 5000 2% Resistor 5000 2% Test generator (120V 2Va.c., 50 or 60 Hz, 1200 2%)
2.4.2 .4.2 2.6. 2.6.3. 3.3 3 2.9.2 2.10 2.10
Limi Limite ted d curre rrent dete determ rmiinati ation Resi Resist stan ance ce of of eart earthi hing ng con condu duct ctor ors s Humidity co conditioning Cree Creepa page ge/c /cle lear aran ance ce/d /dis ista tanc nce e thro through ugh insu insula lati tion on (determination of requirements; working voltage measurements) Creepage/clearance/distance Creepage/clearance/distance through insulation (measurements)
Resistor 2 000 10%, 25 A / < 12V < 0,1 Chamber (91% Rh...95% Rh, 20...30 C) Oscilloscope
Test probe (Fig. 2C, 12mm/80mm)
2.10.3.4 2.10.4 2.10.6.3 and
Measurement of transient levels Creepage distances Thermal cycling and thermal ageing
1/3
R R R R S: only if telecom products are excluded R R R R
Dial gauge
R
Micrometer
R
Pins etc. with different diameters
R
Microscope Test-generator acc. Annex N Test equipment for track ing index Full draught oven ( 2ºC)
R R S S
2006-06-01 1/3
2006-06-01
Subcontracting R R R R
IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT 2.10.6.4 2.10.6.6 2.10.7 3.2.6 3.2.8 4.1.
4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 4.2.10 4.3.2 4.3.6 4.3.12 4.3.13 4.4 4.5
Cooling facility (0º C) Scratch test device with steel pin See 2.10.6.3 and 2.10.6.4 Appropriate weights See 3.2.6 Inclined plane 10 Force 250N/ 800N(Flat surface 12,5cm by 20cm)
Abrasion resistance test Enclosed and sealed parts Cord anchorage and strain relief Cord guards Stability
2006-06-01
S S* R R R R
Steady force test 30 N Steady state force, 250 N Impact test Drop test Stress relief Cathode ray tube Wall or ceiling mounted equipment Handles and manual controls Direct plug-in equipment Flammable liquids Ionizing radiation laser radiation Protection against hazardous moving parts Thermal requirements
Test finger (rigid 30N 3N, fig. 2A) 250N 10N( 30mm circular plane) 50mm/500g 25g steel ball Hard wood 13mm on 19mm to 20mm plywood, two layers. Oven 70K over normal temp. Test equipment acc. IEC 60065 Several weights Force 15N/20N/30N/50N Test equipment (see Fig. 11 of IEC 60065) Measuring equipment for concentration of flammable vapours Ionization meter (Annex H) Several special equipment for laser classification(IEC 60825-1) Test finger (joint /rigid 30N, fig. 2A)
R R R R R S R R R S S S R R
Voltage supply
Voltage supply systems/variability/adequacy
R
Temperature (rise)
Temperature recorder (multi-channel)
R
Thermocouples
R
Winding resistance (normally > 1,0 2-wire, 4-wire <1,0 ).
R
Voltage
2006-06-01
COMMITTEE OF TESTING LABORATORIES
Voltmeters (ac/dc)
R
High voltage meter (probe)
R
Current
Currents (ac/dc)
R
Loading
Loads (resistive)
R
Resistance to abnormal heat
Ball pressure test apparatus (Fig 21, 2nd ed. or IEC 60695-10-2) Oven at least 125ºC
R
2/3
IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT
COMMITTEE OF TESTING LABORATORIES
2/3 4.5.2 4.6.5 4.7.3
4.7.3.6 5.1 5.2 6.2 6.2.1 6.2.2.1 6.2.2.3
Adhesives for constructional purposes Materials, Tests see Annex A
Materials used in high-voltage components Touch current and protective conductor current Electric strength Protection of equipment users from overvoltages on telecommunication networks Impulse Test
Oven up to 100 C V-1, V-2, HF-2, 5V Bunsen burner (9,5 0,5 mm) Gas for burner (~37 MJ/m3)
R
Oven for preconditioning
R
High current arcing
S
Hot wire ignition Test of Annex A or test of 14.4 of IEC 60065 Measuring instruments of Annex D Test equipment with the relevant voltage and dripping current.
R R R R R
Test probe (Fig. 2C, 12mm/80mm) Impulse test generator according to Annex N insulation resistance (500 V dc > 2 M )
R R R
Note: The presence of equipment alone does not indicate a satisfactory situation. Assessors must evaluate the equipment design, calibration, uncertainty and documentation to ensure compliance with the directions of the standard. The requirements of ISO Guide 25 regarding validation are applicable, as the tests of this standard are not standardised tests. Items with * were changed in revised version because of errors in first version 2006-0601 3/3
2006-06-01
3/3
R R R