Job Safety Analysis
Effective Date: 03/09/2000
JOB SAFETY ANALYSIS Job Analyzed: Cable Splicing
Page 1 of
Co!ple"ed By:
JSA #efe$ence %: SC&1
#e'ie(ed by LPT:
)a"e:
Loca"ion*Si"e: #eda P$od+c"ion Sy,"e!, Se$'ice Cen"e$, Specific lo,, e0po,+$e, -+ali"y2 3eal"42 Safe"y2 En'i$on!en".
-LPT Leade$ *da"e.
15 Pe$,onal In7+$y
15
Ta,/ S"ep,
15 #e6+i$ #e6+i$ed ed Pe$,on Pe$,onal al P$o"ec P$o"ec"i' "i'e e E6+ip!en" -PPE. 95 In,pec" (o$/ a$ea and e6+ip!en": e6+ip!en": a5 Cabl Cable e ,"an ,"and, d, b5 Sold Solde$ e$in ing g I$on I$on c5 8$o+ 8$o+nd ndin ing g e6+ip e6+ip!e !en" n" d5 i,i i,ibl ble e 3az 3aza$ a$d, d,
95 a5 In7+$y In7+$y f$o! cable cable falling falling f$o! ,"and,5 ,"and,5 b5 Elec"$ical ,4oc/ 4aza$d c5 In7+$y f$o! ,lipping* falling5
5 P$ P$epa$e cable fo$ ,plicing5
a5 In7+$y f$ f$o! cable falling5 b5 Elec"$ical ,4oc/ 4aza$d5
#eco!!ended Con"$ol, -Enginee$ed2 Ad!ini,"$a"i'e2 PPE. a5 Safe"y S4oe, b5 Safe"y 8la,,e, (*Side S4ield, 95 a5 C4ec/ cable ,"and, ,"and, "o en,+$e en,+$e "4ey a$e ,afe5 b5 C4ec/ elec"$ical co$d, on ,olde$ing i$on fo$ da!age; $epai$*$eplace if nece,,a$y5 c5 C4ec/ g$o+nding e6+ip!en" "o en,+$e i" i, (o$/ing p$ope$ly5 d5 C4ec/ a$ea fo$ 'i,ible 'i,ible 4aza$d, and ,c$ap cable*a$!o$ "4a" i, laying on floo$ and place in p$ope$ di,po,al con"aine$5 5 a5 Al(ay, !a/e ,+$e cable i, ,ec+$ed p$ope$ly in cable ,"and,5 b5
3SE Ad'i,o$ Signa"+$e:
Si"e*P$o7ec"
)a"e:
)a"e:
RPS-JSA-SC-xx
1
Job Safety Analysis
Effective Date: 03/09/2000
JOB SAFETY ANALYSIS Job Analyzed: Cable Splicing
Page 9 of
Co!ple"ed By:
JSA #efe$ence %: SC&1
#e'ie(ed by LPT:
)a"e:
Loca"ion*Si"e: #eda P$od+c"ion Sy,"e!, Se$'ice Cen"e$, Specific lo,, e0po,+$e, -+ali"y2 3eal"42 Safe"y2 En'i$on!en".
-LPT Leade$ *da"e.
=5 #e!o'e a$!o$ f$o! cable in ,plice a$ea5
=5 a5 3and and finge$ c+", f$o! 4ac/,a( and a$!o$5
=5
?5 #e!o'e 7ac/e"*,4ea"4 f$o! in,+la"ing cond+c"o$5
?5 a5 )a!age "o in,+la"ion ca+,ing cable ,plice fail+$e5 b5 In7+$y f$o! being c+" by /nife5
?5
5 Clean in,+la"ing cond+c"o$,5
5
a5 I!p$ope$ elec"$ical cond+c"i'i"y f$o! cond+c"o$, no" cleaned p$ope$ly5
5
5 In,"all ,plicing ,lee'e,5
5
a5 In7+$y "o finge$, and 4and, f$o! being pinc4ed5 b5 I!p$ope$ elec"$ical cond+c"i'i"y d+e "o inco$$ec" ,lee'e in,"alla"ion5
5
5 Apply "ape "o ,plice5
5
a5 In7+$y f$o! /nife c+",5 b5 )efec"i'e cable ,plice ca+,ing p$e!a"+$e fail+$e5
D5
Ta,/ S"ep,
#eco!!ended Con"$ol, -Enginee$ed2 Ad!ini,"$a"i'e2 PPE.
3SE Ad'i,o$ Signa"+$e:
Si"e*P$o7ec"
)a"e:
)a"e:
RPS-JSA-SC-xx
a5 >eep finge$, and 4and, clea$ of 4ac/,a( blade (4en c+""ing a$!o$ and a(ay f$o! "4e ,4a$p edge, of "4e cable a$!o$ (4en peeling i" off5 a5 )o no" c+" in"o "4e cond+c"o$ in,+la"ion (4en $e!o'ing "4e cable 7ac/e"*,4ea"45 If "4e in,+la"ion i, da!aged a ne( ,plice !+," be ,"a$"ed5 b5 @4en $e!o'ing in,+la"ion f$o! "4e cond+c"o$2 al(ay, c+" a(ay f$o! yo+$ body5 a5 Al(ay, clean e0po,ed cond+c"o$, (i"4 p$ope$ cleane$5 a5 >eep finge$, and 4and, a(ay f$o! "4e 7a(, of "4e c$i!ping "ool (4en in,"alling ,plicing ,lee'e,5 b5 In,"all ,plicing ,lee'e, and c$i!p a, pe$ ,plicing in,"$+c"ion, in "4e Se$'ice
2
Job Safety Analysis
Effective Date: 03/09/2000
JOB SAFETY ANALYSIS Job Analyzed: Cable Splicing
Page of
Co!ple"ed By:
JSA #efe$ence %: SC&1
#e'ie(ed by LPT:
)a"e:
Loca"ion*Si"e: #eda P$od+c"ion Sy,"e!, Se$'ice Cen"e$, Specific lo,, e0po,+$e, -+ali"y2 3eal"42 Safe"y2 En'i$on!en".
-LPT Leade$ *da"e.
15 Apply a$!o$5
15 a5 Finge$ and 4and c+",5 b5 B+$n, f$o! ,olde$ing i$on5 c5 In,+la"ion fail+$e d+e "o i!p$ope$ a$!o$ in,+la"ion5
15
115 Te," cable5
115 a5 Cable ,plice in"eg$i"y5
115
195 Clean A$ea5
195 a5 Safe"y 3aza$d5
195
15 C4ec/ fo$ 4aza$do+, !a"e$ial (a,"e5
15 a5 B$ea"4ing 4a$!f+l 4aza$do+, (a,"e 'apo$,5
15
Ta,/ S"ep,
#eco!!ended Con"$ol, -Enginee$ed2 Ad!ini,"$a"i'e2 PPE.
3SE Ad'i,o$ Signa"+$e:
Si"e*P$o7ec"
)a"e:
)a"e:
RPS-JSA-SC-xx
a5 @a"c4 fo$ ,4a$p edge, on a$!o$ "4a" can c+"5 b5 Be ca$ef+l (4en +,ing ,olde$ing i$on no" "o ge" clo,e eno+g4 "o be b+$ned; (a"c4 fo$ 4o" d$ipping ,olde$ "4an can b+$n5 c5 In,"all a$!o$ a, pe$ applica"ion in,"$+c"ion, in "4e Se$'ice
3