Lifting & Rigging Procedures Title:
Lifting Plan of use Crane / . Document Type: Controlled Systems affected: None
Document No : Rev. No. : 0 Issued Date : Dept. : Service Department
TABLE OF CONTENT 1.
CRANE
……………………………………………………………………………………
2
2.
SPECIFICATION DRAWING
……………………………………… ……………………………………………………………………………………
2
3.
SUMMARY
……………………………………… ……………………………………………………………………………………
3
4.
HES PRECAUTION
……………………………………… ……………………………………………………………………………………
3
5.
PRE-REQUISITES
……………………………………… ……………………………………………………………………………………
3
6.
RESOURCES
……………………………………… ……………………………………………………………………………………
3
7.
REFERENCES
……………………………………… ……………………………………………………………………………………
3
8.
CHECKLIST
……………………………………… ……………………………………………………………………………………
4
PROCEDURE
……………………………………...
4
Preparation
……………………………………………………………………………………
4
Pre Lift Inspection
………………………………………
4
For All Terrain Crane
……………………………………………………………………………………
5
Lifting The Load
……………………………………… …………………………………………………………………………………… ……………………………………… ……………………………………………………………………………………
9.
SIGNAL STANDARD
……………………………………… …………………………………………………………………………………… ………………………………………
1
7
NORTH DURI COGEN PLANT
Lifting & Rigging Procedure
Approved by: Reviewed by:
Prepared by: Name (dd/mm/yy)
Department
Signature
.
2
Date
NORTH DURI COGEN PLANT
Lifting & Rigging Procedure 1. CRANE SPECIFICATION
Crane :
Load : Boom Length : Load Radius : Boom Angle : ° Fully Outriggers Extended Rope Type :
2. DRAWING
3
3. SUMMARY The scope of this document is to provide guideline to the team performing Lifting Plan during site preparation for ….. The work will be included: Crane Pre-Lift Inspection Checklist. Operation or simulation test refer to available SOP. 4. HES PRECAUTION All steps in this procedure shall be performed in accordance with and under the constraints of Torishima Safe Work Practices (SWP) and applicable local safety rules and regulations. Warning: STRICT ADHERENCE TO THE DETAILS INDONESIA LABOR LAWS MUST BE MAINTAINED AT ALL TIMES DURING THE IMPLEMENTATION OF THIS PROCEDURE. THE SITE AND LOCAL SAFETY GUIDELINES AND PROCEDURES SHALL BE ADHERED TO AT ALL TIMES. IT IS ADVISABLE TO USE THE LOCAL NDC STANDARD OPERATION PROCEDURE OF OVER HEAD CRANE OF MAINTENANCE, TAGGING AND PADLOCKING OF EQUIPMENT, WITH ALL PERSONNEL MADE FAMILIAR WITH THE PROCEDURE. IT IS OF PARAMOUNT IMPORTANCE THAT ALL PERSONNEL IN THE VICINITY OF LIFTING & RIGGING AND WORKING AT HIGH. 5. PRE-REQUISITES: The following prerequisites shall be completed prior to performing Lifting Job using Crane at HCT Plant : Ensure to do Crane Pre-Lift Inspection Checklist before operate crane Lifting Plan should be done prior to lifting operation start and Lifting Plan The weight of the lifted load and its center of gravity must be known with reasonable accuracy early in the planning process Special consideration for ground support capacity for the crane Before perform lifting ensure that atmospheric test is doing. Lifting Equipment to be used should have a valid certificate and color code Use appropriate lifting equipment All crane crew should be certified personals: Crane operator should have a valid certificate as a MIGAS Crane Operator Lifting Supervisor, Rigger and Signalman should have a valid certificate as a Lifting Supervisor, Rigger and Signalman All crane crew should be get safety induction as SWP required 6. RESOURCES a) Personnel Qualification o Supervisor : 1 person o Crane Operator : 1 person o Rigger : 2 persons b) Tools and Materials Required o Lifting gears ( wire rope sling, shackle, etc ) o Plastic rope for tag line. 7. REFERENCES Document No. Title N/A
SOP Crane
8. CHECKLIST PROCEDURE The following checklist procedure outlines the steps for Lifting using Mobile crane at NDC Plant Area : ST EP A
1.
2.
B 1.
2.
3.
4.
1.
2.
3.
4.
PROCEDURE Preparations: Persiapan : Prepare SRP, JSA, Permit, Check ATC and conduct tail gate meeting between Crane crew who will perform this job Siapkan SRP, JSA, Permit, Check atmosphere dan lakukan tail gate meeting bagi crew crane yang akan bekerja Make sure that all of PPE are available and used. Pastikan semua PPE yang diperlukan tersedia dan dipakai Pre – Lift Inspection Checklist: Pemeriksaan sebelum pengangkatan Check and cleaning of crane unit and ensure there is clear and no foreign material. Cek dan bersihkan crane dan pastikan tidak akan ada barang terjatuh bila crane dioperasikan Make sure the barricades have been installed properly in lifting operation area Pastikan barikade telah terpasang dengan baik di area pengangkatan Ensure that the pre-use inspections have been carried out on cranes that will be used and all finding have been resolved Pastikan bahwa pre use inspeksi telah dilakukan untuk crane yang akan digunakan dan semua finding telah diselesaikan Make sure had been disconected and free from obstacle Pastikan telah tidak terhubung dan bebas dari penghalang apapun For All Terrain crane Ensure that timber mat for crane’s jacks are installed Pastikan timber mat sudah terpasang pada semua kaki2 Ensure that the outrigger was full extention prior lifting operation ongoing Pastikan bahwa outrigger telah full extention sebelum lifting operation berlangsung Ensure that the ground support condition to avoid outrigge r collapsed to the ground. Pastikan ground support kondisi untuk menghindari outrigger amblas ke tanah Check overall safety devices are working properly Periksa keseluruhan safety devices bekerja dengan baik
STATUS/Va lue
Tim e
5.
6. 7. 8. 9. 10. 11. 12. 13. 14. C 1.
2.
3.
4.
5.
6.
Check overall wire rope and drum condition, ensure that is in place and in pulley groove. Cek kondisi sling dan drum sling, pastikan sling berada di groove Check hook condition and ensure the safety latch in good condition and function Cek kondisi hook dan pastikan ada safety latch serta berfungsi Check hook block condition Cek kondisi hook block Check pulley of hook block condition Cek kondisi pulley pada hook Operate the crane swing smoothly. Gerakkan crane untuk swing secara perlahan Operate hoist crane and ensure that all is normal. Gerakkan hoist dan pastikan berfungsi dengan baik Check and simulate all of switch and push button and ensure that all is normal. Cek dan periksa semua tombol dan push button bekerja normal Ensure overall condition is normal and proper. Pastikan kondisi crane aman untuk dioperasikan Report any abnormalities and DO NOT operate the crane. Catat dan laporkan bila ditemukan kerusakan dan crane jangan dioperasikan Overall house keeping. Jaga kebersihan crane dan area kerja Lifting the load: Ensure the operator and rigger are certified, proper lifting gears are checked and marked as color coding Pastikan operator dan rigger punya sertifikat, lifting gear sudah diperiksa dan diwarnai sesuai color coding Operator should really know the weight of starting package to be lifted Operator harus benar-benar mengetahui berat starting package yang akan diangkat Set cranes in safe operation, set the working radius for free swing movement, all outrigger jacks are fully extended for max load Set Cranes pada kondisi aman untuk dioperasikan, pastikan kaki2 terpasang dengan sempurna Arrange the crane’s position so that it is safe to lift the . . Pastikan posisi cranes aman untuk mengangkat MGW, TW and Payload Container should be clear through Identification Data Plate MGW, TW dan Payload Container harus jelas melalui Identifikasi Data Plate Install lifting gear properly ( lifting gears are proper with the load ); 4 pcs of long wire rope sling for all the lug’s corner Pasang lifting gear pada ke empat sudutnya 1 buah sling
7.
8.
9.
10. 11. 12.
13 . 14.
Install 2 tag line in order to control the movement of the . . while lifting Pasang 2 tag line untuk mengontrol beban pada saat diangkat Only one dedicated signalman is assigned to give code / signal to the cranes’ operator and signal man shall wear hi-visibility vest Hanya satu signalman yang memberi aba-aba ke operator cranes dan signal man harus menggunakan hi-visibility vest Lift the slowly, monitor the lifting gears’ position, the center of gravity, and the load Angkat pelan2, pastikan posisi lifting gear, titik berat seimbang, monitor beratnya Lift the as higher as needed, so that it is on the open free position Angkat dengan tinggi secukupnya sehingga terbebas dari halangan Swing the crane to put the starting package in place Swing crane ke arah starting package akan diletakkan Put the container on site make sure that nothing not be pinned under by the . Tempatkan di posisinya, pastikan tak ada yang tertindih oleh Remove lifting gears and store it again Lepaskan lifting gear dan simpan Housekeeping
Remarks : 1. Pastikan Crane bersertifikat (SILO) 2. Pastikan Operator bersertifikat (SIO) 3. Pastikan Rigger bersertifikat 4. Pastikan Work Permit disetujui dan berlaku 5. Pastikan Personil tidak berada di Line Of Fire 6. Pastikan melakukan tailgate meeting dan sosialisasi JSA 7. Pastikan komunikasi lengkap antar personil terlibat 8. Pakai bahasa isyarat yang standard dan dimengerti
9. Signal Standard :