Method statement prepared for demolition works according to Singapore standardsFull description
Method statement prepared for demolition works according to Singapore standardsFull description
Method of statement for civil worksFull description
statement
Methods to pile a spun pile.
General Lifting
Full description
Method Statement for Rehabilitation Works
General LiftingFull description
Method of statement for civil works
Method of Statement for Earth WroksFull description
Full description
Infrastructure Works
Method Statement - Concrete WorksFull description
Full description
Infrastructure WorksFull description
Infrastructure WorksFull description
Infrastructure Works
Civil ActivitiesFull description
METHOD STATEMENT FOR UNDER GROUND CABLE WORKS
CONTENTS Page 2 2 2
1 2 3
Purpose Scope of Works Reference documents
4
Method of Installations 4.1 Site Surve 4.2 !rial pit "#cavation and findings 4.3 $ori%ontal &irectional &rilling 4.4 !rench e#cavation 4.' Sand (edding 4.) *a(le pulling 4.+ *a(le ,ointing and !ermination 4.ackfilling and Reinstatement 4./ Installation of Route 0 ,oint Markers 4.1 !esting and *ommissioning
3 3 3 3 4 4 4 ' ' ) )
' )
"uipment and !ools Safet and Risk Management
-
1
PURPOSE Purpose of this method statement is to outline the seuences and methods of orks intended to (e used for the e#cavation of trench for laing underground 33 k poer5 67. !he *ontractor has the right to adapt the methods of e#ecution as contained in this document from time to time and modif as necessar according to specific site conditions.
2
SCOPE OF WORKS
Method Statements For Under Ground Cabes
!a"e # o$ %
METHOD STATEMENT FOR UNDER GROUND CABLE WORKS
!he scope of orks comprises Manual site surve8 !rail pit e#cavation8 !renching8 *a(le pulling8 *a(le 9ointing8 *a(le termination8 ackfilling8 Installation of Protection tiles8 Installation of Warning tape8 Reinstatement8 Installation of route markers 0 ,oint markers8 *a(le testing8 $ori%ontal &irectional &rilling 0 7pen:cut for Road *rossings8 and Site clearance.