PERHITUNGAN VOLUME I. PEKERJAAN PERSIAPAN 1. Pem Pembers bersih ihan an Laha Lahan n Panjang lahan = 65 m Lebar lahan = 38 m Volume = 65 x 38 = 2470 m² Pagar Keamanan Keliling lapangan = ( 65 + 38 ) x 2 = 206 m 3. Direksi Kit Luas = Panjang x lebar =4mx4m = 16 m² Bauplank Keliling bangunan = 126,28 m II . PEKERJAAN TANAH 1. Gali Galian an Tan Tanah ah Pon Ponda dasi si Laju Lajur r Panjang Luas
166
Volume
160
= 216 m = ( 1,66 + 0,80) x ½ x 1,6 = 1,986 m² = 1,986 x 216 = 425,088 m³
80
2. Galian Galian Tana Tanah h Pondas Pondasii Foot Foot Plat Plat ( 40 Titi Titik k) Panjang Luas
282
200
Volume
17 5
Volume To Tot
= 2,8 m = ( 1,75 + 2,82 ) x ½ x 2 = 4,57 m² = 2,8 x 4,57 = 12,79 m ³ = 12 12,79 x 40 = 511,84 m ³
3. Gali Galian an Tan Tanah ah Pon Ponda dasi si Roll Rollag ag Rollag Trap • Panjang Luas 1 2 0 ,2 7
0 0 1
Volume
85
•
= 9m = ( 0,85 + 1,2) x ½ x 1 = 1,025 m² = 1,025 x 9 = 9,225 m ³
Rollag Pengikat Panjang 30,58
0 3
20
= 84,8 m
Luas Volume
= ( 0,2 + 0,3 ) x ½ x 0,3 = 0,075 m² = 0,075 x 84,8 = 6,36 m ³
TOTAL PEKERJAAN GALIAN TANAH = 425,088 425,088 +511,84 + 9,225 + 6,36 6,36 = 952,513 m ³ III. II. PEKERJAAN PA PASANGAN PO PONDASI 1. Urugan Pa Pasir sir Pondasi Lajur • Panjang = 216 Luas = 0,8 x 0,1 = 0,08 m² Volume = 0,08 x 216 = 17,28 m³ Pondasi Foot Plat • Volume = 0,1 x 1,75 x 2,8 = 0,49 m ³ Volume tot = 0,49 x 40 = 19,6 m³ Pondasi Rollag Trap • Volume = 0,3 x 0,1 x 9 = 0,27 m³ Volume tot = 0,27 x 6 =1,62 m³ Pondasi Rollag Pengikat • Volume = 0,25 x 0,1 x 84,8 = 2,12 m³ 0 1
8 0
1 0
1 7 5
10
30
1 0
2 5
Urugan pasir bawah lantai Luas = 643,45 m² Volume = 643,45 x 0,1 = 64,345 m³ VOLUME TOTAL URUGAN PASIR = 17,28 + 19,6 + 1,62 + 2,12 + 64,345 = 104,965 m³ 2. Pasa Pasang ngan an Bat Batu u Bel Belah ah Panjang = 216 m Luas = ( 0,25 + 0,8 ) x ½ x 0,9 = 0,47 m² Volume = 0,47 x 216 = 102,06 m ³ 3. Pasan Pasanga gan n Ansta Anstamp mpin ing g Volume = 0,2 x 1 x 216 = 43,2 m³ •
90
80
2 0
1 0 0
IV. PEKERJAAN BETON BERTULANG 1. Foot Plat Type A ( 20 Bh) • Volume di bagi menjadi 2 bagian : V1 = 1,65 x 1,62 x 0,3 = 0,80 m³ V2 = {(3,14x0,25x0,25) + (1,65x1,62) x ½ x 0,2 = 0,28 m³ Vol tot/ bh = 0,8 + 0,28 = 1,08 m³ / bh Vol total = 1,08 x 20 = 36 m³ Pembesian D 19 – 15. 2 = 2x ( 100/15 x 2,230 x 1,65 x 1,62 ) = 79,47 kg / unit Berat / m = 79,47 / 1,08 = 73,58 kg / m³ ~ 74 kg / m ³ Type B ( 6 Bh ) • 0.50
1.62
Ø 19 - 15
Ø 19 - 15 50
16 5
0 .4 0
V1
= 1,65x1,62x0,3 = 0,80 m V2 = {( 0,4x0,4) + ( 1,65x1,62) x ½ x 0,2 = 0,28 m V tot / bh = 0,8 + 0,2 = 1m
1.62
Ø 19 -15
Ø1 9 - 1 5 40 165
V total = 1 x 6 =6m Pembesian Ø 19 – 15 = 2{( 100/15x2,230) x ( 1,65 x 1,62) = 79,47 Berat / m = 79,47 / 1 = 79,47 kg / m ~ 79 kg / m Type C ( 4 bh) • V1 = 1,65x1,62x0,3 = 0,80 V2 = {( 3,14x0,2x0,2)+(1,65x1,62)x1/2x0,2 = 1,1 m V tot / bh = 0,80 + 1,1 = 1,91 m / bh Vol tot = 1,91 x 4 = 7,67 m Pembesian Ø 19 – 15 = 2{( 100/15x2,230) x ( 1,65 x 1,62) = 79,47 Berat / m = 79,47 / 1,91 = 41,60 kg / m ~ 42 kg / m Type D ( 6 bh ) • V1 = 1,5 x1,5x0,25 = 0,56 m V2 = { ( 0,3 x 0,3)+ ( 1,5x1,5)} x ½ x 0,15 = 0,015 m 0. 40
1. 62
Ø 19 - 15
Ø 19 - 15 40
165
1.50
Ø 19 - 15
Ø 19 - 15
Ø 19 - 15 30 150
V tot / bh V tot Pembesian Ø 19 – 15
= 2{( 100/15x2,230) x ( 1,5 x 1,5 ) = 66,9 = 66,9 / 0,57 = 117,36 kg / m ~ 117 kg / m
Berat / m •
= 0,015 + 0,56 = 0,57 m = 0,57 x 8 = 4,6 m
Type E ( 2 bh ) V1
1.50 Ø 19 - 15
Ø 19 - 15
Ø 19 - 15
30 150
Pembesian Ø 19 – 15 Berat / m 2. Sloof
= 1,5 x 1,5 x 0,25 = 0,56 V2 = {( 3,14x0,15x0,15)+(1,5x1,5)} x ½ x 0,15 = 0,174 Vol tot / unit = 0,56 + 0,174 = 0,7 Vol Total = 0,7 x 2 = 1,4 m
= 2{( 100/15x2,230) x ( 1,5 x 1,5 ) = 66,9 = 66,9 / 0,7 = 95,57 kg / m ~ 96 kg / m
Type S1 TUMPUAN Panjang = 34,4 m Volume = 34,4 x 0,6 x 0,25 = 5,16 m Pembesian 5 D 22 x 2 = 5 x 2,980 x 2 2 Ø 12 = 2 x 0,888 Ø 10 – 10 = 100 / 10 x 0,617 x 1,7 •
= 29,8 kg / m = 1,776 kg / m = 10,48 kg / m = 42,06 kg / m
Berat / m Bekisting Luas / m
= 42,06 / 0,15 = 280,4 kg / m = ( 2 x 0,6 ) + 0,25 = 1,45 = 1,45 / 0,15 = 9,66 m / m
LAPANGAN Panjang = 51,6 m Volume = 51,6 x 0,6 x 0,25 = 7,74 m Pembesian 6 D 22 x 2 = 6 x 2,980 x 2 2 Ø 12 = 2 x 0,888 Ø 10 – 15 = 100 / 15 x 0,617 x 1,7
= 35,76 kg / m = 1,776 kg / m = 6,98 kg / m = 44,516 kg / m
Berat / m •
Type S2 TUMPUAN Panjang Volume
Pembesian 4 D 22 x 2 2 Ø 12 Ø 10 – 10
= 44,516 / 0,15 = 296,77 kg / m
= 58,2 m = 58,2 x 0,4 x 0,25 = 5,82 m
= 4 x 2,980 x 2 = 2 x 0,888 = 100 / 10 x 0,617 x 1,3
= 23,84 kg / m = 1,776 kg / m = 8,021 kg / m = 33,63 kg / m
Berat / m
= 33,63 / 0,1 =336,37 kg / m
LAPANGAN Panjang =87,3 m Volume = 87,3 x 0,4 x 0,25 = 8,73 m Pembesian 4 D 22 x 2 = 4 x 2,980 x 2 2 Ø 12 = 2 x 0,888 Ø 10 – 15 = 100 / 15 x 0,617 x 1,3
= 23,84 kg / m = 1,776 kg / m = 5,34 kg / m = 30,96 kg / m
Berat / m Bekisting Luas / m •
Type S3 TUMPUAN Panjang Volume Pembesian 6 D 22 x 2 2 Ø 12 Ø 10 – 10
= 30,96 / 0,1 = 309,6 kg = ( 2 x 0,4 ) + 0,25 = 1,05 m = 1,05 / 0,1 = 10,5 m / m
= 16,8 m = 16,8 x 0,3 x 0,6 = 3,024 m = 6 x 2,980 x 2 = 2 x 0,888 = 100 / 10 x 0,617 x 1,8
= 35,76 kg / m = 1,776 kg / m = 11,1 kg / m = 48,64 kg / m
Berat / m
= 48,64 / 0,18 = 270,2 kg /m
LAPANGAN Panjang = 25,2 Volume = 25,2 x 0,6 x 0,3 = 4,536 m
Pembesian 6 D 22 x 2 2 Ø 12 Ø 10 – 15
= 6 x 2,980 x 2 = 2 x 0,888 = 100 / 15 x 0,617 x 1,8
= 35,76 kg / m = 1,776 kg / m = 7,40 kg / m = 44,9 kg / m
Berat / m Bekisting Luas /m
= 44,9 / 0,18 = 249 , 4 kg / m = ( 2 x 0,6 ) + 0,3 = 1,5 m = 1,5 / 0,18 = 8,33 m / m
3. Kolom K1 • Tinggi = 7,4 m Jumlah= 20 bh Vol = 7,4 x 3,14 x 0,25 x 0,25 x 20 = 29,04 m Pembesian 15 Ø19 = 15x2,230 Ø 8 – 10 =100 / 10 x 0,395 ( 3,14 x 0,5)
= 33, 45 kg / m = 6,2 kg / m = 39,65 kg / m
Berat / m Bekisting Luas / m
= 39,65 / 0,195 = 202,29 kg / m = ( 3,14 x 0,5) x 1 = 1,57 m = 1,57 / ( 3,14 x 0,25 x 0,25 = 8,26 m / m
K2 Tinggi = 4,2 m Jumlah = 4 bh Vol = 4,2 x 3,14 x 0,2 x 0,2 x 4 = 2,1 m Pembesian 10 Ø19= 10 x2,230 Ø 8 – 10 =100 / 10 x 0,395 ( 3,14 x 0,4) •
= 22,3 kg / m = 4,96 kg / m = 27,26 kg / m
Berat / m Bekisting Luas / m
= 27,26 / 0,125 = 218,08 kg / m = ( 3,14 x 0,4) x 1 = 1,26 m = 1,26 / 0,125 = 10 m / m
K3 Tinggi = 4,2 m •
Jumlah = 2 bh Vol = 4,2 x 3,14 x 0,15 x 0,15 x 2 = 0,593 m Pembesian 8 Ø19 = 8 x2,230 Ø 8 – 10 =100 / 10 x 0,395 ( 3,14 x 0,3)
= 17,84 kg / m = 3,72 kg / m = 21,56 kg / m
Berat / m Bekisting Luas / m
= 21,56 / 0,07 = 308 kg / m = ( 3,14 x 0,3 ) x 1 = 0,942 m = 0,942 / 0,07 = 13,45 m / m
K4 Tinggi = 7,4 m Jumlah = 6 bh Vol = 7,4 x 0,4 x 0,4 x 6 = 7,104 m Pembesian 16 Ø19 = 16 x2,230 = 35,68 kg / m Ø 8 – 10 =100 / 10 x 0,395 { ( 0,4 + 0,4) x2) = 6,32 kg / m •
= 42 kg / m Berat / m Bekisting Luas / m
= 42 / 0,16 = 262,5 kg / m = ( 2 x ( 0,4 x 0,4 ) ) x 1 = 1,6 m = 1,6 / 0,16 = 10 m / m
K5 Tinggi = 7,4 m Jumlah = 8 bh Vol = 7,4 x 0,3 x 0,3 x 8 = 5,328 m Pembesian 8 Ø19 = 8 x2,230 = 17,84 kg / m Ø 8 – 10 =100 / 10 x 0,395 { ( 0,3 + 0,3) x2) = 4,74 kg / m •
= 22,58 kg / m Berat / m Bekisting Luas / m
= 22,58 / 0,09 = 250 kg / m = ( 2 x ( 0,3 x 0,3 ) ) x 1 = 1,2 m = 1,2 / 0,09 = 13,3 m / m
4. Balok •
B1
TUMPUAN Panjang = 4,8 m Volume = 4,8 x 0,8 x 0,4 = 1,536 m Pembesian 2x 10 Ø19 = 10 x2,230 Ø 8 – 10 =100 / 10 x 0,395 x 2,4
= 44,6 kg / m = 9,48 kg / m = 54,08 kg / m
Berat / m
= 54,08 / ( 0,8 x 0,4 ) = 169 kg / m = ( 0,8 x 2 ) + 0,4 =2m = 2 / ( 0,8 x 0,4 ) = 6,25 m / m
Bekisting Luas / m
LAPANGAN Panjang = 7,2 m Volume = 7,2 x 0,8 x 0,4 = 2,304 m Pembesian 10 Ø19 = 10 x2,230 Ø 8 – 15 =100 / 15 x 0,395 x 2,4 7 Ø19 = 7 x 2,230 4 Ø19 = 4 x 2,230
= 22,3 kg / m = 6,31 kg / m = 15,61 kg / m = 8,92 kg / m =53, 14kg / m
Berat / m •
= 53,14 / ( 0,8 x 0,4 ) = 166 kg / m B2-1
TUMPUAN Panjang = 14,4 m Volume = 7,2 x 0,7 x = 3,024 m Pembesian 8 Ø19 Ø 8 – 10 4 Ø19 2 Ø8
0,3
= 8 x2,230 =100 / 10 x 0,395 x 2 = 4 x 2,230 = 2 x 0,395
= 17,84 kg / m = 7,9 kg / m = 8,92 kg / m = 0,79 kg / m =35,45 kg / m
Berat / m
= 35,45 / 0,21 =168,8 kg / m
LAPANGAN Panjang = 21,6 m Volume = 21,6 x 0,7x 0,3 = 4,536 m
Pembesian 4 Ø19 x 2 Ø 8 – 15 2 Ø8
= 4 x2,230 x 2 =100 / 15 x 0,395 x 2 = 2 x 0,395
= 17,84 kg / m = 5,26 kg / m = 0,79 kg / m =23,89 kg / m
Berat / m Bekisting Luas / m •
TUMPUAN Panjang Volume Pembesian 7 Ø19 Ø 8 – 10 3 Ø19 2 Ø8
= 23,89 / 0,21 =113,79 kg / m = ( 0,7 x 2 ) + 0,3 = 1,7 m = 1,7 / ( 0,7 x 0,3 ) = 8,09 m / m B2 -2 =6m = 6 x 0,7 x 0,3 = 1,26 m = 7 x2,230 =100 / 10 x 0,395 x 2 = 3 x 2,230 = 2 x 0,395
= 15,61 kg / m = 7,9 kg / m = 6,69 kg / m = 0,79 kg / m =30,99 kg / m
Berat / m
= 30,99 / 0,21 = 147,57 kg / m = ( 0,7 x 2 ) + 0,3 = 1,7 = 1,7 / 0,21 = 8,09 m /m
Bekisting Luas / m
LAPANGAN Panjang =9m Volume = 9 x 0,7x 0,3 = 1,89 m Pembesian 4 Ø19 = 4 x2,230 Ø 8 – 15 =100 / 15 x 0,395 x 2 5 Ø19 = 5 x 2,230 2 Ø8 = 2 x 0,395
= 8,920 kg / m = 5,26 kg / m = 11,15 kg / m = 0,79 kg / m =26,12 kg / m
Berat / m •
TUMPUAN Panjang Volume
= 26,12 / 0,21 = 124,38 kg / m B3-1 = 56 m = 56 x 0,5 x 0,25 =7m
Pembesian 6 Ø19 Ø 8 – 10 3 Ø19 2 Ø8
= 6 x2,230 =100 / 10 x 0,395 x 1,5 = 3 x 2,230 = 2 x 0,395
= 13,38 kg / m = 5,925 kg / m = 6,69 kg / m = 0,79 kg / m =26,78 kg / m
Berat / m Bekisting Luas / m
= 26,78 / 0,5 x 0,25 = 214,24 kg / m = ( 0,5 x 2 ) + 0,25 = 1,25 m = 1,25 / 0,5 x 0,25 = 10 m / m
LAPANGAN Panjang = 96 m Volume = 96 x 0,5 x 0,25 = 12 m Pembesian 3 Ø19 = 3 x2,230 Ø 8 – 15 =100 / 15 x 0,395 x 1,5 4 Ø19 = 4 x 2,230 2 Ø8 = 2 x 0,395
= 6,69 kg / m = 3,94 kg / m = 8,92 kg / m = 0,79 kg / m =16,79 kg / m
Berat / m •
B3-2 TUMPUAN Panjang Volume Pembesian 5 Ø19 Ø 8 – 10 2 Ø19 2 Ø8
= 16 ,79 / 0,5x 0,25 = 134,32 kg / m
= 12 m = 12 x 0,5 x 0,25 = 1,5 m = 5 x2,230 =100 / 10 x 0,395 x 1,5 = 2 x 2,230 = 2 x 0,395
= 11,15 kg / m = 5,925 kg / m = 4,46 kg / m = 0,79 kg / m =22,325 kg / m
Berat / m
= 22,325 / 0,5x0,25 = 178,6 kg / m
LAPANGAN Panjang = 18 m Volume = 18 x 0,5 x 0,25 = 2,25 m Pembesian 2 Ø19 = 2 x2,230 Ø 8 – 15 =100 / 15 x 0,395 x 1,5 3 Ø19 = 2 x 2,230 2 Ø8 = 2 x 0,395
= 4,46 kg / m = 3,94 kg / m = 6,69 kg / m = 0,79 kg / m =15,88 kg / m
Berat / m •
B4-1 TUMPUAN Panjang Volume Pembesian 5 Ø19 Ø 8 – 10 2 Ø19
= 15,88/ 0,5 x 0,25 = 127,04 kg / m
= 70,8 m = 70,8 x 0,4 x 0,25 = 7,08 = 5 x2,230 =100 / 10 x 0,395 x 1,3 = 2 x 2,230
= 11,15 kg / m = 3,42 kg / m = 4,46 kg / m =19,38 kg / m
Berat / m Bekisting Luas / m
= 19,38 / 0,4x0,25 =193,8 kg / m = ( 0,4 x 2 ) + 0,25 = 1,05 = 1,05 / 0,4 x 0,25 = 1,05 m / m
LAPANGAN Panjang = 106,2 m Volume = 106,2 x 0,4 x 0,25 = 10,62 m Pembesian 2 Ø19 = 2 x2,230 Ø 8 – 15 =100 / 15 x 0,395 x 1,3 3 Ø19 = 2 x 2,230
= 4,46 kg / m = 3,42 kg / m = 6,69 kg / m =14,57 kg / m
Berat / m •
B4-2 TUMPUAN Panjang Volume Pembesian 4 Ø19 Ø 8 – 10 2 Ø19
= 14,57/ 0,4x0,25 = 145,7 kg / m
= 27,6 m = 27,6 x 0,4 x 0,25 = 2,76 m = 4 x2,230 =100 / 10 x 0,395 x 1,3 = 2 x 2,230
= 8,920 kg / m = 3,42 kg / m = 4,46 kg / m =16,8 kg / m
Berat / m
= 16,8 / 0,4 x 0,25 = 168 kg / m
LAPANGAN Panjang = 41,4 m Volume = 41,4 x 0,4 x 0,25 = 4,14 m Pembesian 2 Ø19 = 2 x2,230
= 4,46 kg / m
Ø 8 – 15 3 Ø19
=100 / 15 x 0,395 x 1,3 = 2 x 2,230
= 3,42 kg / m = 6,69 kg / m =14,57 kg / m
Berat / m •
B5-1 TUMPUAN Panjang Volume Pembesian 5 Ø16 Ø 8 – 10 2 Ø16
= 14,57/ 0,4x0,25 = 145,7 kg / m
= 16,8 m = 16,8 x 0,4 x 0,2 = 1,344 m = 5 x1,58 =100 / 10 x 0,395 x 1,2 = 2 x 1,58
= 7,9 kg / m = 4,74 kg / m = 3,16 kg / m =15,8 kg / m
Berat / m Bekisting Luas / m
= 15,8 / 0,08 = 197,5 kg / m = ( 0,4 x 2 ) + 0,2 =1 = 1 / 0,08 = 12,5 m / m
LAPANGAN Panjang = 25,2 m Volume = 25,2 x 0,4 x 0,2 = 2,016 Pembesian 3 Ø16 = 3 x1,58 Ø 8 – 15 =100 / 15 x 0,395 x 1,2 4 Ø16 =4 x 1,58
= 4,74kg / m = 3,15 kg / m = 6,32 kg / m =14,21 kg / m
Berat / m •
B5-2 TUMPUAN Panjang Volume Pembesian 4 Ø16 Ø 8 – 10 2 Ø16
= 14,21 / 0,08 = 177,625 kg / m
= 3,6 m = 3,6 x 0,4 x 0,2 = 0,288 m = 4 x1,58 =100 / 10 x 0,395 x 1,2 = 2 x 1,58
= 6,32kg / m = 4,74 kg / m = 3,16 kg / m =14,2 kg / m
Berat / m
= 14,2 / 0,08 = 177,5 kg / m
LAPANGAN Panjang = 5,4 m Volume = 5,4 x 0,4 x 0,2 = 0,432 m Pembesian 3 Ø16 = 3 x1,58 Ø 8 – 15 =100 / 15 x 0,395 x 1,2 2 Ø16 = 2 x 1,58
= 4,74kg / m = 3,15 kg / m = 3,16 kg / m =11,05 kg / m
Berat / m •
B6 TUMPUAN Panjang Volume Pembesian 3 Ø14 Ø 8 – 15 2 Ø14
= 11,05 / 0,08 = 138,125 kg / m
= 9,6 m = 9,6 x 0,3 x 0,25 = 0,72 m = 3 x1,23 =100 / 15 x 0,395 x 1,1 = 2 x 1,23
= 3,69 kg / m = 2,89 kg / m = 2,46 kg / m =9,04 kg / m
Berat / m
= 9,04 / 0,075 = 120,53 kg / m
LAPANGAN Panjang = 14,4 Volume = 14,4 x 0,3 x 0,25 = 1,08 m Pembesian 3 Ø16 = 3 x1,58 Ø 8 – 20 =100 / 20 x 0,395 x 1,1 2 Ø14 = 2 x 1,23
= 4,74 kg / m = 2,17 kg / m = 2,46 kg / m =9,37 kg / m
Berat / m Bekisting Luas / m
•
B7 TUMPUAN Panjang Volume Pembesian 6 Ø19 Ø 8 – 10
= 9,37 / 0,075 = 124,9 kg / m = ( 0,3 x 2 ) + 0,25 = 0,85 m = 0,85 / 0,075 = 11,3 m / m
= 4,8 m = 4,8 x 0,6 x 0,25 = 0,72 m = 6 x2,230 =100 / 10 x 0,395 x 1,7
= 13,38kg / m = 6,715 kg / m
3 Ø19 2 Ø8
=3 x 2,230 = 2 x 0,395
= 6,69kg / m = 0,79kg / m =27,57 kg / m
Berat / m = 27,57 / 0,15 = 183,8 kg /m LAPANGAN Panjang = 7,2 m Volume = 7,2 x 0,6 x 0,25 Pembesian 4 Ø19 = 4 x2,230 Ø 8 – 10 =100 / 15 x 0,395 x 1,7 3 Ø19 =3 x 2,230 2 Ø8 = 2 x 0,395
= 8,92kg / m = 4,47 kg / m = 6,69kg / m = 0,79kg / m =20,87 kg / m
Berat / m Bekisting Luas /m
= 20,87 / 0,15 = 139,17 kg /m = ( 0,6 x2 ) + 0,25 = 1,45 = 1,45 / 0,15 =9,66 m /m
5. RING BALK TUMPUAN Panjang = 75,8 m Volume = 75,8 x 0,4 x 0,25 = 7,58 m Pembesian 4 Ø19 = 4 x2,230 Ø 8 – 10 =100 / 10 x 0,395 x 1,3 2 Ø19 =2 x 2,230
= 8,92kg / m = 5,135 kg / m = 4,46 kg / m =18,515 kg / m
Berat / m Bekisting Luas / m
= 18,515 / 0,1 = 185,15 kg /m = ( 0,4 x 2 ) + 0,25 = 1,05 = 1,05 / 0,1 = 10,5 m / m
LAPANGAN Panjang = 96,1 m Volume = 96,1 x 0,4 x 0,25 = 9,61 m Pembesian 3 Ø19 = 3 x2,230 Ø 8 – 15 =100 / 15 x 0,395 x 1,3 2 Ø19 =2 x 2,230
= 6,69 kg / m = 3,42 kg / m = 4,46 kg / m =14,57 kg / m
Berat / m
= 14,57 / 0,1 = 145,7 kg /m
6. PLAT LANTAI Luas lantai = 573 m Tebal = 0,12 Volume = 0,12 x 474,1 = 67,772 m Pembesian Ø 10 – 40 = 1,48 kg Berat / m = 1,48 / 0,12 x 1 = 12,34 kg / m 7. TANGGA V.
PEKERJAAN PASANGAN DINDING 1. Pasangan Batu Trasram 1 : 3 Dinding lantai 1 • Panjang = 157,75 – 50,69 = 107,06 m Volume = 107,06 x 0,3 x 0,15 = 4,8117 m
Trasram KM / WC LT 1 dan Lt 2 Tinggi trasram = 1,5 m Panjang = 50,4 – 8,2 = 42,2 m Volume = 42,2 x 1,5 x 0,15 = 9,495 m 2. Pasangan Batu bata 1 : 3 : 10 Dinding Lantai 1 • Tinggi dinding = 3,7 m Panjang = 157,75 m Luas = ( panjang dinding x tinggi ) – bukaan = ( 157,75 x 3,7 ) – 142,69 = 583,675 – 142,69 = 440,985 m Volume = 440,985 x 0,15 = 66,14 m Dinding Km / Wc lantai 1 • Tinggi dinding = 2,25 m Panjang = 27 m Luas = ( 27 x 2,25 ) – 23,066 = 60,75 – 23,066 = 37,684 m Volume = 37,684 x 0,15 = 5,65 m Dinding Lantai 2 • Tinggi = 3,2 m Panjang = 153,75 Luas = ( 153,75 x 3,2 ) – 116,25 = 492 – 116,25 = 375,75 m •
Volume
Dinding Km Lt 2 Tinggi = 1,45 m Panjang = 26,6 Luas = ( 26,2 x 1,45 ) – 5,28 = 33,29 m Volume = 33,29 x 0,15 = 4,99 m PEKERJAAN PLESTERAN 1. Dinding trasram ( 1 : 8 ) tebal 15 mm Dinding LT 1 • Panjang = 107,06 Tinggi = 0,3 Volume = 107,06 x 0,3 x 2 = 64,23 m Dinding Km / Wc • Panjang = 42,2 Tinggi = 1,75 Volume = 42,2 x 1,75 x 2 = 147,7 m 2. Dinding ½ bata ( 1: 3 ) tebal 15 mm Dinding Lt 1 • Volume = 440,985 x 2 = 881,97 m Dinding KM / wc Lt1 • Volume = 37,684 x 2 = 75,368 m Dinding Lt 2 • Volume = 375,75 x 2 = 751 ,5 m Dinding Km / Wc Lt2 • Volume = 33,29 x 2 = 66,58 PEKERJAAN KUSEN 1. Type PJ1 ( 1 Bh ) Kusen = Alumunium 6 / 10 Panjang = 29,61 m Kaca Mati • Volume =12,284 m 2. Type PJ2 ( 1 bh ) Kusen = Alumunium • Panjang = 21,29 m Pintu Panil Kyu • Luas = 3,15 m Jendela Berbingkai • Luas = 3,342 m Kaca Mati • Luas = 1,135 m •
VI.
VII. •
= 375,75 x 0,15 = 56,36 m
3. Type PJ3 ( 2 Bh ) Kusen = Alumunium • Panjang = 15,55 x 2 = 31,1 m Pintu Panil Kyu • Luas = 1,68 m Volume = 1,68 x 2 = 3,36 m Jendela Berbingkai • Luas = 1,43 m Volume = 1,43 x 2 = 2,86 m 4. Type PTS ( 1 Bh ) Kusen = Alumunium • Panjang = 16,5 m Pintu Panil Kyu • Luas = 1,68 m Kaca Mati • Luas = 2,62 m
5. Type P1 ( 4 Bh ) Kusen = Alumunium • Panjang = 9,05 m Volume = 9,05 x 4 = 36,2 m Pintu Panil Kayu • Luas = 2,73 m Volume = 2,73 x 4 = 10,92 m Kaca Mati • Luas = 3,65 m Volume = 3,65 x 4 = 14,6 m 6. Type P2 ( 7 Bh ) Kusen = Alumunium • Panjang = 7,5 m Volume = 7,5 x 7 = 52,5 m Pintu Panil Kayu • Luas = 1,68 m Volume = 1,68 x 7 = 11,76 m Kaca Mati • Luas = 0,52 m Volume = 0,52 x 7 = 3,64 m 7. Type P3 ( 2 Bh ) Kusen = Alumunium •
Panjang Volume •
•
•
•
•
•
•
= 10,4 m = 10,4 x 2 = 20,8 m
Pintu Kaca Luas = 2,28 m Volume = 2,28 x 2 = 4,56 m Kaca Mati Luas = 1,1 m Volume = 1,1 x 2 = 2,2 m 8. Type P4 ( 10 Bh ) Kusen = Alumunium • Panjang = 5,12 m Volume = 5,12 x 10 = 51,2 m Pintu PVC Luas = 1,57 m Volume = 1,57 x 10 = 15,7 m 9. Type J1 ( 10 Bh ) Kusen = Alumunium • Panjang = 17,2 m Volume = 17,2 x 10 = 172 m Daun Jendela Luas = 2,37 m Volume = 2,37 x 10 = 23,7 m Kaca Mati Luas = 1,7 m Volume = 1,7 x 10 = 17 m 10. Type J2 ( 19 Bh ) Kusen = Alumunium • Panjang = 11,8 m Volume = 11,8 x 19 = 224,2 m Daun Jendela Luas = 2,37 m Volume = 2,37 x 19 = 45,03 m Kaca Mati Luas = 0,85m Volume = 0,85 x 19 = 16,15 m 11. Type J3 ( 4 Bh ) Kusen = Alumunium 6 / 10 •
Panjang Volume •
•
•
•
•
•
= 14,08 m = 14,08 x 4 = 56,32 m
Kaca Mati Luas = 3,852 m Volume = 3,85 x 4 = 15,4 m 12. Type J4 ( 2 Bh ) Kusen = Alumunium • Panjang = 9,9 m Volume = 9,9 x 2 = 19,8 m Daun Jendela Luas = 1,18 m Volume = 1,18 x 2 = 2,37 m Kaca Mati Luas = 0,85m Volume = 0,85 x 2 = 1,7 m 13. Type J5 ( 2 Bh ) Kusen = Alumunium 6 / 10 • Panjang = 13,14 m Volume = 13,14 x 2 = 26,28 m Kaca Mati Luas = 2,772m Volume = 2,772 x 2 = 5,54 m 14. Type J6 ( 1 Bh ) Kusen = Alumunium 6 / 10 • Panjang = 20,6 m Kaca Mati Luas = 3,68 m 15. Type V1 (2 Bh ) Kusen = Alumunium • Panjang = 5,35 m Volume = 5,35 x 2 = 10,7 m Daun Jendela Luas = 0,91 m Volume = 0,91 x 2 = 1,82 m 16. Type V2 ( 9 Bh ) Kusen = Alumunium • Panjang = 3,1 m
Volume
•
VIII.
IX.
X. •
= 3,1 x 9 = 27,9 m Daun Jendela Luas = 0,455 m Volume = 0,455 x 9 = 4,095 m PEKERJAAN LANTAI 1. Garaito 40 x 40 ( Polos ) Luas = 157,5 + 13,5 + 9 + 4,25 = 184,25 m Volume = 184,25 – 4,8 = 179,45 m 2. Keramik Glasur 40 x 40 Luas = 24,4 m 3. Keramik 30 x 30 ( Putih ) Luas = 684,5 m 4. Keramik 30 x 30 ( abu – abu ) Luas = 323,23 m 5. Keramik 20 x 20 Luas = 38 m 6. Keramik Dinding 20 x 25 Panjang =51,9 Tinggi = 1,5 m Luas = 51,9 x 1,5 = 77,85 m PEKERJAAN LANGIT – LANGIT 1. Pemasanga Rangka Metal Furring Luas = 1542,34 m 2. Pemesangan gypsum Board Luas = 723,09 m 3. Pemasangan Kalsiboard Luas = 819,25 m PEKERJAAN ATAP 1. Pekerjaan Kuda – Kuda Baja Kuda – Kuda 1 Profile 60.60 . 6 Panjang = 55,22 m Berat kg / m = 5,42 Berat total = 55,22 x 5,42 = 299,2 Profile 80.80.8 Panjang = 51,24 m Barat kg / m = 8,72 Berat total = 51,24 x 8,72 = 446,8 BERAT TOTAL KUDA – KUDA TYPE 1 •
Kuda – Kuda 2 Profile 60.60.6 Panjang = 73,69
= 446,8 + 299,2 = 746,01
Berat Total = 73,69 x 5,42 = 399,41 Profile 80.80.8 Panjang = 28,44 m Berat total = 28,44 x 8,72 = 247,4 BERAT KUDA – KUDA TYPE 2 •
Kuda – Kuda 3 Profile 60.60.6 Panjang = 18,16 m Berat total = 18,16 x 5,42 = 98,42 Profile 80.80.8 Panjang = 25,78 m Berat total = 25,78 x 8,72 = 224,8 BERAT KUDA – KUDA TYPE 3
2. Gording 8 / 12 Panjang = 633,33 m Volume = 0,08 x x 633,33 3. Usuk dan reng Luas atap = 870,454 m Nok Panjang
= 48,75 m
Bubungan
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. XII. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
Panjang = 48,75 m XI. PEKERJAAN SANITASI Jumlah Kloset Duduk = 7 bh Jumlah Wastafel = 9 bh Jumlah floor drain = 8 bh Jumlah kran = 9 bh Pasang Bak cuci stainlestil = 1 bh Pasang bak mandi = 7 bh Panjang Pipa air kotor padat = 29,73 m Panjang pipa air kotor cair = 48,63 m Pasang pipa beton = 195,65 m Pasang pipa air bersih = 99,13 m PEKERJAAN ISTALASI LISTRIK exhous fan = 5 bh Ac split = 21 bh Pane listrik = 2 bh Lampu Rml = 11 bh Lampu TKI = 5 bh Lampu RML = 53 bh Dwont light = 64 bh Stop Kontak = 2 bh Saklar ganda = 11 bh Saklar hotel = 26 bh
= 50,6 m
= 399,41 + 247,4 = 646,838
= 98,42 + 224 ,8 = 323,22
11.
Lampu gantung = 1 bh