Descripción: rescripcion general de puntos importantes en el cierre de minas en antamina
plan de cierre-Mina Pierina
tema 1 Peon de mantenimientoDescripción completa
UNA SIMULACION DE TRATAMIENTO Y CIERRE DE MINA POMPERIA
Descripción: UNA SIMULACION DE TRATAMIENTO Y CIERRE DE MINA POMPERIA
Descripción completa
esto es un pryecto para calculo 2
Software PhaseDescripción completa
Mineria
libro de ajedrezDescripción completa
descripccion,metodo de explotacion, ubicacionDescripción completa
Descripción completa
Descripción completa
Descripción completa
UNIVERSIDAD DE SANTIAGO DE CHILE FACULTAD DE INGENIERIA INGENIERIA DEPARTAMENTO INGENIERIA GEOGRAFICA
PLAN DE CIERRE MINA EL PEÑÓN
ANGELI NATALIA FLORES OYARCE OYARCE 2005
UNIVERSIDAD DE SANTIAGO DE CHILE FACULTAD DE INGENIERIA INGENIERIA DEPARTAMENTO INGENIERIA GEOGRAFICA
PLAN DE CIERRE MINA EL PEÑÓN
“TRABAJO DE TITULACIÓN PRESENTADO EN CONFORMIDAD A LOS REQUISITOS PARA OBTENER EL TÍTULO DE INGENIERO DE EJECUCIÓN EN AMBIENTE”
Profesor Guía: Sr. Mario Araya B.
ANGELI NATALIA FLORES OYARCE OYARCE 2005
UNIVERSIDAD DE SANTIAGO DE CHILE FACULTAD DE INGENIERIA INGENIERIA DEPARTAMENTO INGENIERIA GEOGRAFICA
PLAN DE CIERRE MINA EL PEÑÓN
“TRABAJO DE TITULACIÓN PRESENTADO EN CONFORMIDAD A LOS REQUISITOS PARA OBTENER EL TÍTULO DE INGENIERO DE EJECUCIÓN EN AMBIENTE”
Profesor Guía: Sr. Mario Araya B.
ANGELI NATALIA FLORES OYARCE OYARCE 2005
ABSTRACT Minera Meridian Limitada (MML) has developed a Closure Plan for “El Peñón” site, it was on 2000, which was approved for SERNAGEOMIN. The Policy of the Company consider a proactive strategy respect to the closure, it establish action for the closure during the operation of the project and consider the actualization of the national law, both rezones makes urgent actualize the Closure Plan Project. To define the obligations of MML related to the closure and decommission of “El Peñón” site, was review and analyzed the environmental legislation, the facilities construction and operation permits, the compromises from the Environmental Evaluation Impact System (EEIS) about its Environmental Study Impact and Environmental Declaration Impact from the site, and the environmental government resolutions, the last closure plan and the environmental fundamentals of Meridian Gold Inc. To describe the environmental actual conditions of the studied areas and make the projections for the facilities included in the closure at the end of the operations, was made the bibliography from the “El Peñon” project, all of them form the Environmental Study Impact and Environmental Declaration Impact and some of studies and preliminary data made during on the operations. Based on the preliminary data and the information described on the paragraphs before reading, was defined the activities of closure and the evaluation of the cost for each facilities, the quantities, unitary costs, and mount associated for each activity finished in the Closure Plan.
unitarios, y montos asociados a cada actividad contemplada en el Plan de Cierre. Con la revisión y análisis de los antecedentes antes mencionados se obtuvo la versión actualizada del estudio Plan de Cierre vigente, para la Mina El Peñón, el cuál se desarrolla a continuación. Palabras clave: Plan Cierre Mina Abandono