Rincian Anggaran Biaya Penggemukan Domba Jumlah ternak yang digemukan : 400 ekor domba No
Item Biaya
Q
A. Biaya Tetap 1 Pembuatan kandang (kapasitas 100 ekor) 2 Pembutan Base camp 3 Mesin pemotong rumput
satuan
Harga per satuan (Rp)
4 kandang 1 buah 1 unit
3 1 ,6 2 5 , 0 0 0 4 , 9 8 0 ,0 0 0 1 0 ,0 0 0 , 0 0 0
Subtotal B. Biaya Variabel 1 Pe Pembelian domba bakalan (usia 8 bln) 2 Konsentrat dedak padi 3 Biaya Biaya listrik listrik 4 Obat cacing 5 Vitamin 6 Probiotik
Subtotal
C. Tenaga kerja 1 Up Upah pencari rumput (5 orang) 2 Upah anak kandang (2 orang @ Rp. 850.000) Subtotal Total Biaya (Rp)
400 ek ekor 4,800 kg kg
8 0 0 ,0 0 0 2 ,5 0 0
8 kali 8 kali 50 liliter
2 0 0 ,0 0 0 1 0 0 ,0 0 0 1 2 0 ,0 0 0
600 HO HOK 4 bulan
3 5 ,0 0 0 1 ,7 0 0 ,0 0 0
Jumlah (Rp)
126,500,000 4,980,000 10,000,000 141,480,000 320,000,000 12,000,000 500,000 1,600,000 800,000 6,000,000 340,900,000 21,000,000 6,800,000 27,800,000 510,180,000
Rincian Biaya Pembuatan Kandang Domba Kapasitas Luas kandang
No
Uraian Biaya
: 100 ekor : 15,5 x 6,5 meter per segi Harga/satuan Quantity satuan (Rp)
Jumlah (Rp)
A. Material Kandang 3
Pasir 3 m Bata merah 1,400 buah Semen 15 zak Kayu balok 6x12 cm 95 lembar Kayu balok 5x10 cm 110 lembar Kayu kaso 4x6 cm 350 lembar Kayu papan 1,5 cm x 10 cm x 100 cm 1,290 lembar Bambu 85 batang Asbes 0,9 m x 3 m 48 lembar Tutup asbes 20 lembar Paku asbes 5 kg Paku 10 10 kg Paku 7 5 kg Paku 5/4 5 kg Kayu papan 5 cm x 20c m x 300 cm 70 lembar Tali 50 meter Subtotal (Rp) B. Tenga Kerja 1 Tukang (1 orang x 25 hari) 25 HOK 2 Kenek (5 orang x 25 hari) 75 HOK Subtotal (Rp) C. Peralatan Kandang 1 Tempat minum 25 cm 100 buah 2 Sekop 2 buah 3 Ember plastik diameter 15 cm 10 buah 4 Tong bak air 2 buah 5 Ciduk 5 buah Subtotal (Rp) Total Biaya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
200,000 850 64,000 30,000 16,000 8,000 5,000 8,000 45,000 25,000 20,000 15,000 15,000 15,000 30,000 15,000
600,000 1,190,000 960,000 2,850,000 1,760,000 2,800,000 6,450,000 680,000 2,160,000 500,000 100,000 150,000 75,000 75,000 2,100,000 750,000 23,200,000
75,000 50,000
1,875,000 3,750,000 5,625,000
20,000 75,000 10,000 250,000 10,000
2,000,000 150,000 100,000 500,000 50,000 2,800,000 31,625,000
100.75
30 7.444168734 22.3325062
Luas Base camp + Gudang
No
Uraian Biaya
A. Material Base Cam+Gudang 1 Bambu 2 Papan kayu panjang 2 meter 3 Paku reng 4 Paku usuk 5 Genting Subtotal (Rp) B. Tenga Kerja 1 Tukang (1 orang x 25 hari) 2 Kenek (5 orang x 25 hari) Subtotal (Rp) Total Biaya
Rincian Biaya Pembuatan Base Camp : 6 x 5 meter per segi
Quantity
30 60 2 3 1,200
satuan
batang buah kg kg buah
8 HOK 25 HOK
Harga/satuan (Rp)
Jumlah (Rp)
8,000 27,000 14,000 14,000 1,000
240,000 1,620,000 28,000 42,000 1,200,000 3,130,000
75,000 50,000
600,000 1,250,000 1,850,000 4,980,000