Below are possible questions for a Six sigma exam. How many data points do you need to have a short-term capability? Two data points. Over 100 data points. Fewer than five data points. Between 30 and 50 data points. If the Cp is 1.0, what is the sigma value? 1 2 3 6 None of above
What is the purpose for gauge R&R? Statistical analysis to evaluate measure error To understand repeatability and reproducibility of your MSA To help validate what is a defect and what is not To gauge the rest and relaxation needed for a black belt a through d Q4. What plot describes the many distributions in one graph in quartiles? Interval plot Capability plot Probability plot Median plot Box plot Q5. What is meant by a p-value of less than 0.05? That there are no significant difference The variance terms are equal The mean has a shift of 1.5 sigma You're 95 percent confident that there is a statistical difference All the above A correlation value of less than 0.2 indicates Significant correlation Insignificant Correlation Cant Say None of the above
% of normal Distribution Curve A process can be in control when 1 point is outside 3 sigma limit 8 points are on same side of the control limits Both A and B None of the above Above what RPN should immediate action be taken 70 80 85 75
An activity in a process map is represented using a Circle Triangle Rectangle Cylinder As per the RACI model the sponsor or champion is assigned what role R A C I At 5 sigma DPMO equals 6210 233 3.4 None of the above At what percentage are Gage R&R test unsatisfactory 10% 15% 25% >30% Average companies operate at what sigma levels 3Sigma 4Sigma 5Sigma 6Sigma Can the process owner and champion be the same person Yes No Cant Say None of the above Cp is a capability index with the units measured in? mm No units Scale of 1 to 5 Defect rate or yield
If Cpk = Process Process Process Process
Cp, this result means that themean is on target mean is not on target mean can not be defined mean is defected
If p<=0.05 then the effect is statistically Significant Insignificant Cant Say None of the above W What chart is used when sample size is 1
If the formula Quartile(array,4) is given, what value would it return Max value Min Value First Quartile MedianValue If there are occasional failures the Occurance Indicator is set at 4 5 3 2
In DOE with repetition what happens to the factors Are reset Are not reset Maybe reset Cant say
In RACI Model, C stands forCooperation Control Consultation Coordination
In SIPOC Model, S stands forSuppliers Subordinates Seniors Sponsor
Orthogonal DOE design is Balanced Horizontally Balanced Vertically Balanced Diagonally Balanced Horizontally + Vertically Six sigma implies quality at what percentage? 99% 99.9% 99.99966% 100% t test is performed with how many groups Three Two N number of groups None of the above The C and U chart follow which distribution Poisson Binomial Normal None of the above
Variations which occur naturally in a stable process are called Common Cause Variation Controlled Cause Variation Both A and B None of the above
What documents should not be presented during project approval Project Charter Request for financial support Project Plan Analysis Plan What does an alternative hypothesis state? Some difference exists between 2 samples No difference exists Difference may or may not exist None of the above What is a defect? Something which will always happen A feeling that the process is causing a problem A measurable indicator not conforming to customer requirement All of the above What is the standard deviation of the following population 11,13,18,15,9 3.49 3.12 3 4 What type of DOE is used if there are 5 or more factors Screening DOE Optimization DOE Characterization DOE All of the above When a point on the graph falls outside the control limits without a special cause it can be classified as a Type I error Type II error This is natural Cant say Which formula is used to calculate the correlation RSQ CORREL CORELATION None of the above Which graph reveals relationships or association between two variables Scatter Plot Box Plot Frequency Plot Interval Plot Which is a low cost VOC tool
Surveys Focus Group Interviews Benchmarking
Which is not a phase of DMAIC? Measure Continue Analyze Define Which of the following can be shown on a process map Activities Responsibilities Volumes All of the above Which of the following is an analyze phase deliverable Project Status Form Metrics Graphs Project Plan All of the above Which of the Critical To Critical To Critical To Critical To
following is not a dimension of project metricsQuality (CTQ) Supply (CTS) Price (CTP) Delivery (CTD
Which of the following is not a waste Waste of inventory Waste of production Waste of conveyance Waste of waiting Which of the following is not an element of the charter Business Case Problem statement Project Plan Risk Plan Which organization was responsible for introducing Six Sigma? Motorola General Electric ABB Allied Signal Who is a champion? Professional who leads 6Sigma projects on full time basis Professional who leads 6Sigma project on part time basis One who receives process output Senior level executive who sponsors a project