CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
1 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date ate
:
15.0 15.01. 1.20 2005 05
Page
:
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
2 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date ate
:
15.0 15.01. 1.20 2005 05
Page
:
MAIN CONTRACTOR :
SUBCONTRACTOR:
AL HABTOOR MURRAY & ROBERTS JOINT VENTURE
EMIRATES TECHNICAL ASSOCIATES
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
3 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
Prepd' By Rev. No.
EQA
Date
ECM
Approvals HMR Description and Page Numbers of Revisions
(Shanawaz)
00
29.11.2004
SS
MY
Initial submission
01
16.12.2004
SS
MY
Company comments incorporated, pages 7,8 & forms 39A,B revised
02
15.01.2005
SS
MY
Company comments incorporated & pages 6,7 & forms FM-39A & B revised
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM 06.
TOOLS / EQUIPMENT
07.
PROCEDURES
08.
INSPECTION
09.
ATTACHMENTS
4 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
5 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
practices for the precommissioning & commissioning of "Staircase Pressurisation System" through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. 02. SCOPE :
This Procedure refers to various work methods contained within ETA Project Control documents, which explains and covers the Precommissioning & Commissioning of "Staircase Pressurisation
6 of 25
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
04. ABBREVIATIONS / DEFINITIONS
4.1 4.2
Company CEM
:
Abu Dhabi National Oil Company (ADNOC) C E i (HVAC)
7 of 25
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM 4.28 4.29 4.30 4.31
ECOMM HVAC MREP PTECH
: : : :
AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
ETA Commissioning Engineer (Mechanical) Heat Ventilation & Air Conditioning Manufacturer's Representative Prime Technologies
MAIN CONTRACTOR :
SUBCONTRACTOR:
AL HABTOOR MURRAY & ROBERTS JOINT VENTURE
EMIRATES TECHNICAL ASSOCIATES
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
8 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
5.7 The procedure is then reviewed and approved by HMR's QA/QC Manager. 5.8 The implementation of the procedures mentioned will be done by the ETA Commissioning Engineer - HVAC & M/s. Prime Technologies. 5.9. The test shall be performed at site. In case of failure, the manufacturer shall correct or replace parts or equipment at no cost to the company.
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
9 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
5.15. Replacement of materials and consumables (if required), cleaning of filters and all necessary steps to restore the building services to full serviceability shall be carried out. 5.16. All relevant schemtics / single line diagrams (if applicable) shall be made available while carrying out precommissioning & commissioning activities. 5.17. All design data of equipment shall be recorded in the relevant approved log sheets prior to start of field measurements. The variance of the actual values from the design shall be
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
10 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
7.1.
Ensure that the pressurisation fan installation is complete and mechanical completion is approved.
PTECH
7.2.
Ensure that vibration isolators are complete with proper alignment of fan.
PTECH
7.3.
Ensure that no damage has occured between mechanical completion & precommissioning.
PTECH
11 of 25
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM AL HABTOOR MURRAY & ROBERTS JOINT VENTURE
AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
EMIRATES TECHNICAL ASSOCIATES
7.12.
Check the interface of the pressurisation fan with the fire alarm system & BMS.
PTECH
7.13.
Check for proper installation of pressure sensor in the shaft.
PTECH
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM 7.25.
12 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
Record all readings in the final performance check list reference no. FM-3209-ETA-039C.
MAIN CONTRACTOR :
SUBCONTRACTOR:
PTECH
CONSTRUCTION OF ADNOC GROUP OF COMPANIES NEW HEADQUARTERS PROJECT No.3209 TITLE
PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
13 of 25 AGREEMENT No. 173209C1. Ref. No.
:
PC-3209-ETA- 039
Rev. No.
:
02
Date
:
15.01.2005
Page
:
CONSTRUCTION OF ADNOC GROUP COMPANIES NEW HEADQUARTERS PROJECT No.3209 AGREEMENT No. 173209C1
CHECK SHEET FOR : PRECOMMISSIONING CHECK SHEET FOR STAIRCASE PRESURISATION SYSTEM
SUBCONTRACTOR
ETA
Form No.: FM-3209-ETA-039 A Rev. No. : 02 Date : Page : Page 1 of 1
HMR
FAN REF. NO. :
DRAWING REF. NO.:
LOCATION :
LEVEL : Checked by
Sl. No.
CHECKS TO BE PERFORMED
ETA
HMR
ADNOC
Date
For PRIME TECH/ETA : Name :
For HMR : Name :
For ADNOC - PROJECTS : Name :
Sign
:
Sign
:
Sign
:
Date
:
Date
:
Date
:
Abbreviation : ADNOC - Abu Dhabi National Oil Company, HMR - Al Habtoor Murray & Roberts JV
CONSTRUCTION OF ADNOC GROUP COMPANIES NEW HEADQUARTERS PROJECT No.3209 AGREEMENT No. 173209C1
CHECK SHEET FOR : COMMISSIONING CHECK SHEET FOR STAIRCASE PRESURISATION SYSTEM
SUBCONTRACTOR
ETA
Form No.: FM-3209-ETA-039 B Rev. No. : 02 Date : Page : Page 1 of 1
HMR
FAN REF. NO. :
DRAWING REF. NO.:
LOCATION :
LEVEL : Checked by
Sl. No.
CHECKS TO BE PERFORMED
ETA
HMR
ADNOC
Date
For PRIME TECH/ETA : Name :
For HMR : Name :
For ADNOC - PROJECTS : Name :
Sign
:
Sign
:
Sign
:
Date
:
Date
:
Date
:
Abbreviation : ADNOC - Abu Dhabi National Oil Company, HMR - Al Habtoor Murray & Roberts JV
CONSTRUCTION OF ADNOC GROUP COMPANIES NEW HEADQUARTERS PROJECT No.3209 AGREEMENT No. 173209C1
CHECK SHEET FOR : PERFORMANCE RECORD FOR STAIRCASE PRESSURISATION SYSTEM
SUBCONTRACTOR
ETA
HMR
FAN REF. NO. :
DRAWING REF. NO.:
LOCATION :
SUPPLIER :
Form No.: FM-3209-ETA-039 C Rev. No. : 02 Date : Page : Page 1 of 1
PERFORMANCE RECORD FOR STAIRCASE PRESSURISATION SYSTEM Manufacturer
Type
Speed
RPM
For PRIME TECH/ETA: Name :
For HMR : Name :
For ADNOC - PROJECTS : Name :
For ADNOC- ADMIN : Name :
Sign
:
Sign
:
Sign
:
Sign
:
Date
:
Date
:
Date
:
Date
:
Abbreviation : ADNOC - Abu Dhabi National Oil Company, HMR - Al Habtoor Murray & Roberts JV
AL HABTOOR MURRAY & ROBERTS JOINT VENTURE CONSTRUCTION OF ADNOC GROUP COMPANIES NEW HQ PROJECT NO. 3209 INSPECTION AND/OR TESTING REQUEST FOR APPROVAL ITEM TO BE INSPECTED AND/OR TESTED :
Form No. : FM-3209/ANNEX.KRev.No. : 06 Page
:
ITR No.
Verification Form: AREA: ITP REF ITP Serial No. DRWG. No. Previous ITR No. if any: SKETCH ATTACHED TO SHOW THE LOCATION (s)
YES
NO
READY FOR INSPECTION AND/OR TESTING : DATE : ……………….……TIME : …….. ……………SIGNATURE :………..… ISSUED BY ENGINEER : …………………. …… DATE : ……………….……TIME : …….. ……………SIGNATURE :………..… RECEIVED BY SUB CON. QC ENG. : ……………DATE : ……………….……TIME : …….. ……………SIGNATURE :………..… RECEIVED BY CONT. QC ENG. : ……………… DATE : ……………….……TIME : …….. ……………SIGNATURE :………..… RECEIVED BY ITL : ……………………………
DATE : ……………….……TIME : …….. ……………SIGNATURE :………..…
RECEIVED BY ADNOC :………………………..
DATE : ……………….……TIME : …….. ……………SIGNATURE :………..…
CONTRACTOR QA/QC INSPECTION RESULTS AND REMARKS:
APPROVED
LIST OF SHOP DRAWINGS RELATED TO PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM Drawing List Revision : Date : S.NO.
Drawing Title
DL-039 02 15.01.2005
Drawing No.
1
Air-conditioning & Ventilation Layout
Penthouse - Tower-H
3209/ETA/15000/ 0014
2
Air-conditioning & Ventilation Layout
Penthouse - Tower-J
3209/ETA/15000/ 0021
RISK ASSESSMENT CONSTRUCTION OF ADNOC GROUP COMPANIES NEW HEADQUARTERS PROJECT No.3209 AGREEMENT No. 173209C1
TITLE
:
REF. No. REV. No. DATE PAGE
: : : :
RA-3209-ETA- 039 02 15.01.2005 1 of 2
RISK ASSESSMENT FOR PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
Activity
Risk
Description of Risk - Risk of falling from ladder or mobile
Working on Height by use of
Precautionary Measures - Trained and competent personnel will be deputed to work on mobile scaffolding.
scaffolding by using improper ladder or Medium
step ladder or
mobile scaffolding.
- Proper, safe & maintained ladders & scaffolding will be used.
- Risk of Toppling of mobile access platforms
mobile scaffolding.
resulting in human injury + material damage.
- Necessary guidelines for safe use of mobile scaffolding or ladders will be provided to site personnel.
- Risk of getting injured by misuse of ladders or mobile scaffoldings.
- Close & vigilant supervision will be done during operations on mobile scaffolding.
- Safe and reasonable access will be provided for working areas.
Working Adjacent to other trades
Light
Risk of getting injured from operations in progress by other trades around the actual
- Works of other trades will be suitably co-ordinated by site supervisors to ensure safe operations of both the trade teams.
working locations. - Incase structural or other works is ongoing close by, suitable protection will be provided to protect the persons working close to other groups.
.
.
RISK ASSESSMENT CONSTRUCTION OF ADNOC GROUP COMPANIES NEW HEADQUARTERS PROJECT No.3209 AGREEMENT No. 173209C1
TITLE
:
REF. No. REV. No. DATE PAGE
: : : :
RA-3209-ETA- 039 02 15.01.2005 2 of 2
RISK ASSESSMENT FOR PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM
Activity
Risk
Description of Risk
Precautionary Measures
- Trained and competent personnel will be employed for use of power-tools. Working on live electric panel
- Risk of getting electric shock causing Medium
human injury.
- Risk of electric sparks by loose connections or ov erheated wires which
- Proper and healthy connections will be done by trained electricians.
- only specified / recommended industrial socket / plugs will be used for extension wires.
may become the source of fire incidents. - Switching off the power supply will be made compulsory while leaving the power tool idle for longer durations or leaving the working locations. - Well maintained power tool will be used at site. - Proper insulators will be used by working personnel such as hand gloves, wooden
platforms, safety shoe with rubber sole and dry floors to avoid the electric shock to working personnel. - Wherever felt necessary MCBs, will be used for quick disconnection of power supply to any defective power tool.
.
Project : ADNOC Group Companies New H.Q. Building PC & C PROCEDURE FOR STAIRCASE PRESSURISATION SYSTEM : PC-3209-ETA-039 RESPONSE TO COMPANY COMMENTS ON REV.01 SUBMISSION
.N O.
COMPANY COMMENTS
01. Noise level to be measured & recorded
ETA RESPONSE -
Noise level for all areas shall be measured as per approved procedure ref. PC-3209-ETA-044