MS PPR piping installation
METHOD STATEMENT FOR WATER PROFFING WORKS
Full description
Full description
Full description
Full description
Full description
Full description
Full description
Full description
sharjah method statementFull description
Full description
Full description
Method Statement:-INSTALLATION INSTALLATION DOMESTIC DO MESTIC WATER FILTRATION FILTRATION SYSTEM.
METHOD STATEMENT FOR INSTALLATION INSTALLATION OF DOMESTIC DOMEST IC WATER WATER FILTRA FILTRATION TION SYSTEM.
Page 1 of 7
Method Statement:- INSTALLATION DOMESTIC WATER FILTRATION SYSTEM.
INDEX
1. P!"o#e
$. S%o"e
&. Re'e!en%e#
(. Mate!)a*#
+. E,)"ment Man"oe!
/. P!o%ed!e#
a.
Sto!a0e
. P!e"a!at)on
%. In#ta**at)on
2. 3a*)t4 Cont!o*
5. In#"e%t)on and te#t)n0.
6. Sa'et4 mea#!e#.
17. R)#8 A##e##ment.
11. Atta%hment#.
Page 2 of 7
Method Statement:- INSTALLATION DOMESTIC WATER FILTRATION SYSTEM.
1.7
P!"o#e:
This Method Statement is designed to give guidance for Installation Domestic water filtration system.
$.7
S%o"e:
To install Domestic water filtration system – Carbon Activated filter and Multimedia filter.
1. Scaffolding + levated "latform ,Installed + -"erated by Certified "ersonal. %. /ilti Drill and cutting M+c ,!AT certified. #. !lumbing and electrical Tool 0o including S"irit 2evel( !i"e cutter. 3. Sanding "a"er and cleaning waste cloth. 4. !i"e wrenches.
+. . Man"oe!
1. !ro5ect ngineer %. Site ngineer + Senior Su"ervisor #. Su"ervisors 3. Team leaders 4. !lumbers and lectricians.
Page 3 of 7
Method Statement:- INSTALLATION DOMESTIC WATER FILTRATION SYSTEM. 6. /el"ers
/.7
P!o%ed!e:
/. a. Sto!a0e.
I.
*iltration sets shall be carefully off$loaded at site storage yard using necessary man"ower + 0oom loader etc. in such a way that no damage is caused to these materials.
II.
Material will be ins"ected at off$loading "oint for any "hysical damage and com"ly to s"ecifications as "er the a""roved materials sheets.
III.
Materials shall be stored in a "lace free of water and ade7uately covered to avoid any 8ind of damages and to be "ro"erly identified.
I9.
*ilter vessels and accessories will be stored on a "ro"er "allet or wooden + card board boes. All sets to be covered "ro"erly to avoid the entry of foreign "articles.
9.
*ilter vessel and related fillings shall be shifted nearest to the wor8 "lace using # Ton truc8+vehicle.
/. . P!e"a!at)on:
i
Drawings for installation are a""roved ) co$ordinated with other services.
ii
2ocation + Area are cleared for commencement of installation of "i"ing.
iii !linth finishing and "i"ing to the system are in com"leted stage.
/. %. In#ta**at)on:
i.
-nly s"ecified and a""roved ma8e of :ater filter ,Multimedia *ilter and Carbon activated *ilter shall be used.
ii.
Installation shall be as "er a""roved drawings and as "er manufacturer;s recommendation.
iii.
All :ater filter ,Multimedia *ilter and Carbon activated *ilter shall be new + unused and ca"acity as indicated on the a""roved drawings and material submittal.
Page 4 of 7
Method Statement:- INSTALLATION DOMESTIC WATER FILTRATION SYSTEM.
iv.
The :ater filter ,Multimedia *ilter and Carbon activated *ilter should be "laced in a well$ ventilated room to ensure ade7uate cooling of the system.
v.
The :ater filter ,Multimedia *ilter and Carbon activated *ilter does not re7uire a s"ecial foundation( but it should be "ositioned on a concrete "linth of min. 14
vi.
All structural wor8 re7uired must have been carried out accordance with the dimensions stated in the dimension table + general arrangement drawing. The concrete foundations shall have sufficient strength. Ma8e sure that the concrete foundation has set firmly before "lacing the unit on it. Its surface shall be truly hori=ontal and even.
In#ta**at)on o' m*t)med)a F)*te!:
a
!osition the *iltration tan8 to the locations as "er sho" drawing and ensure "ro"er clearance available or the maintenance of the same.
b Install the valve head and it "anel in "osition on the *ilter vessel without any filling. nsure the "anel values are readable and free from obstruction. c
Start with "i"ing with filters in ) out connection and 0ac8 wash connection. nsure unions are "rovided for all connections and re7uired valves as "er manufacturer recommendation.
d -nce connections are made ensure sufficient su""ort to the connecting "i"es and valves so the valve head does not have load of same. e :ith valves closed "roceed for hydrostatic testing of the "i"e line to ensure no lea8s in the system. f
>ee" all the valves in shut condition remove the union 5oints and ma8e the 9alve head free from connections.
g ?nder the su"ervision of the *ilter su""lier sand filling to be done. h As "er instruction the fillings are done in levels+volume as mentioned by manufacturer. i
The *ilter "anel is connected with single "hase su""ly and to be switched on and commissioned by su""lier.
Page 5 of 7
Method Statement:- INSTALLATION DOMESTIC WATER FILTRATION SYSTEM.
In#ta**at)on o' Ca!on a%t)9ated F)*e!:
a !osition the *iltration tan8 to the locations as "er sho" drawing and ensure "ro"er clearance available or the maintenance of the same.
b Install the valve head and it "anel in "osition on the *ilter vessel without any filling. nsure the "anel values are readable and free from obstruction. c
Start with "i"ing with filters in ) out connection and 0ac8 wash connection. nsure unions are "rovided for all connections and re7uired valves as "er manufacturer recommendation.
d -nce connections are made ensure sufficient su""ort to the connecting "i"es and valves so the valve head does not have load of same. e :ith valves closed "roceed for hydrostatic testing of the "i"e line to ensure no lea8s in the system. f
>ee" all the valves in shut condition remove the union 5oints and ma8e the 9alve head free from connections.
g ?nder the su"ervision of the *ilter su""lier Carbon filling to be done. h As "er instruction the fillings are done in levels+volume as mentioned by manufacturer. i
-nce filling are com"leted the valve head is connected and the vessel is ready for the testing and commissioning activity.
5
The *ilter "anel is connected with single "hase su""ly and to be switched on and commissioned by su""lier.
2.7
3a*)t4 Cont!o*:
The @C ngineer at site will ensure 7uality at all stage of "ro5ect from delivery of Material( storage( installation( Testing and till /anding over.
Page 6 of 7
Method Statement:- INSTALLATION DOMESTIC WATER FILTRATION SYSTEM.
5.7
In#"e%t)on and te#t)n0:
After com"letion of Domestic :ater *iltration system installation( the same shall be raised for consultant;s ins"ection.
6.7
Sa'et4 Mea#!e#:
During the installation ) testing( all safety "recautions shall be followed as "er the established !ro5ect safety "lan.
17.7
R)#8 a##e##ment: The ris8s involved during installation and testing shall be assessed and recorded through /a=ard identification ris8 assessment sheet and mitigation measure shall be strictly ensured at site.